HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 30192Transportation Services Transportation Planning CHANGE ORDER FORM City of Fort Collins PROJECT TITLE: Mason Transportation Corridor PROJECT NUMBER: 30521900 CONTRACTOR: Felsburg Holt & Ullevig (PO #2206648) CHANGE ORDER NUMBER: 5 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. & 2. See attached for reason and description of change. 3. The contract cost will increase by $12,730.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST $1,642,542.00 TOTAL APPROVED CHANGE ORDERS $904,112.60 TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change ACCEPTED BY: SUBMITTED BY; $0.00 $12, 730.00 $2,559,384.60 DATE: Jl s—o7 DATE: 5 /_�/O 7 REVIEWED BY: N t A- DATE: (Engineer) APPROVED BY: N i ✓k— DATE: APPROVED BY: APPROVED BY: cc. City Clerk Contractor Purchasing Project File (Department Head) DATE: s% J y A4 (Service Area DATE: (Purchasing Agent) =So [forth i Ikon • 1?0. oox 580 • Fort C oilllls, L 0 80522-0580 • (97 0) 224-n058 • F_1X (,97o) 2_1-o239 MA FELSBURG (4HOLT & ULLEVIG engineering paths to transportation solutions April 16, 2007 Ms. Kathleen Bracke, AICP Senior Transportation Planner City of Fort Collins PO Box 580 Fort Collins, CO 80522 RE: Budget Addendum Request FHU Reference No. 06-287 Dear Ms. Bracke: A request has been made by City of Fort Collins staff to use our sub -consultant, Carter & Burgess, for additional NEPA Environmental Assessment assistance. Attached is a proposal from Carter & Burgess for the additional services. If this budget addendum is approved, our contract budget for the BRT EA and PE should be revised as follows: Total Contract co 3_ H • Currently Contracted Amount = $536,215.00 • Requested Addendum = $ 12,730.00 Z= • New Total = $548,945.00 If you have any questions regarding this information, please do not hesitate to call me at 303- 721-1440. Sincerely, FELSBURG HOLT & ULLEVIG Richard R. Follmer, PE, PTOE Senior Transportation Engineer 6300 South Syracuse Way, Suite 600 Centennial, CO 80111 tet 303.712 1. 1440 fax 303.72L0832 www.thuen,.com into@flzueng.com Carter-Surgess April 9, 2007 Mr. Rich Follmer Felsburg Holt & Ullevig 6300 South Syracuse Way, Suite 600 D (�� �Y�! Centennial, CO 80111 IE AFR ± 2007 JJ I RE: Mason Corridor BRT Additional Requested Services FELSBURG, HOLT& ULLEVIG Dear Rich, In a conversation I had last week, Kurt Ravenschlag with the City of Fort Collins requested that i provide an '.'..itvliiuw %=v iii.; uc:U:iionui uCS. -�iiiia vlils niiitii .�Y: Biu gc,>s utiuu.�e-�....Cvilul"lvTiJ ucu �ioia Of theia:..0ii BRT EA. As part of the current scope, Carter & Burgess is preparing existing conditions sections for the following resources: visual, noise and vibration, air quality and hazardous materials. Under this proposed scope Carter & Burgess would update existing conditions for the following additional resources: • Land use and zoning • Water resources and water quality • Social • Floodplains • Economic • Paleontological resources • EJ • Parks and Recreation areas • Wildlife & Fisheries • Trails • Vegetation and noxious weeds The estimate for the additional work is $12,730, including preparation of 8 graphics. This scope also assumes the following: • City is responsible for updating existing conditions for: o Right-of-way o Historic and archaeological resources o Transportation (existing conditions and impacts) • FHU is responsible for providing the necessary right -of --way information to the city and updating 'IT 0 -1 .. o Threatened and endangered species Thank you for your assistance and please let me know if you need any additional information. Sincerely, J11"4rd Tracey MacDonald Project Manager Cc: Gina McAfee