Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5911 MISCELLANEOUS CONCRETE PROJECTAdministrative Services
Purchasing Division
Express Concrete, Inc.
Attn: Kimberly J. Hoffman, Vice President
5305 S. Ziegler Rd.
Fort Collins, CO 80528
Re: Renewal, 5911 Miscellaneous Concrete Project
Dear Ms. Hoffman:
The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per
the existing terms and conditions with the addition of Section 19 outlined below and revised bid
schedule attached.
Prohibition Against Employing Illegal Aliens. This paragraph shall apply to all Contractors whose
performance of work under this Agreement does not involve the delivery of a specific end product
other than reports that are merely incidental to the performance of said work. Pursuant to Section 8-
17.5-101, C.R.S., et. seq., Contractor represents and agrees that:
A. As of the date of this Agreement:
1. Contractor does not knowingly employ or contract with an illegal alien; and
2. Contractor has participated or attempted to participate in the basic pilot employment
verification program created in Public Law 208, 104th Congress, as amended, and
expanded in Public Law 156, 108th Congress, as amended, administered by the
United States Department of Homeland Security (the "Basic Pilot Program") in order to
verify that Contractor does not employ any illegal aliens.
B. Contractor shall not knowingly employ or contract with an illegal alien to perform works
under this Agreement or enter into a contract with a subcontractor that fails to certify to
Contractor that the subcontractor shall not knowingly employ or contract with an illegal
alien to perform work under this Agreement.
C. Contractor shall continue to apply to participate in the Basic Pilot Program and shall in
writing verify same every three (3) calendar months thereafter, until Contractor is
accepted or the public contract for services has been completed, whichever is earlier. The
requirements of this section shall not be required or effective if the Basic Pilot Program is
discontinued.
D. Contractor is prohibited from using Basic Pilot Program procedures to undertake pre-
employment screening of job applicants while this Agreement is being performed.
E. If Contractor obtains actual knowledge that a subcontractor performing work under this
Agreement knowingly employs or contracts with an illegal alien, Contractor shall:
Notify such subcontractor and the City within three days that Contractor has actual
knowledge that the subcontractor is employing or contracting with an illegal alien; and
215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707
SECTION 00330 CITY OF FORT COLLINS
BIDSCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO.5911 - 2007 RENEWAL
ITEM
NO
DESCRIPTION
2007 UNIT
PRICE
UNIT
ESTIMATED
QUANTITY
TOTAL COST
202.01
Sawcut Concrete/Asphalt <4"
$ 2.19
LF
25
$ 54.75
202.02
Sawcut Concrete/Asphalt 4" < 6"
$ 2.72
LF
25
$ 68.00
202.03
Sawcut Concrete/Asphalt 6" < 8"
$ 3.40
LF
25
$ 85.00
202.04
Sawcut Concrete/Asphalt 8" < 10"
$ 4.71
LF
25
$ 117.75
202.05
Sawcut-Additional l"Depth
$ 0.79
LF
25
$ 19.75
202.06
Remove Concrete Sidewalk
$ 2.36
SF
1500
$ 3,540.00
202.07
Remove Concrete Curb and Gutter
$ 3.56
LF
250
$ 890.00
202.08
Remove Monolithic Curb, Gutter & Sidewalk
$ 2.41
SF
250
$ 602.50
202.09
Remove Concrete Driveway/Apron/Crosspan
$ 2.56
SF
750
$ 1,920.00
202.10
Remove Concrete Pavement - 10"
$ 3.97
SF
500
$ 1,985.00
202.11
Remove Concrete Pavement - Additional I" Depth
$ 0.41
SF
50
$ 20.50
20112
Remove Asphalt-6"
$ 2.19
SF
250
$ 547.50
202.13
Remove Asphalt - Additional I" Depth
$ 0.41
SF
50
$ 20.50
202.14
Remove Inlet
$ 549.45
EA
5
$ 2,747.25
202.15
Remove and Haul Driveway Fillets
$ 52.33
EA
5
$ 261.65
202.16
Remove Flagstone
$ 2.98
SF
100
$ 298.00
203.01
Excavation - General Less Than 50 CY
$ 62.76
CY
150
$ 9,414.00
203.02
Excavation- General Over 50 CY
$ 56.68
CY
150
$ 8,502.00
203.03
Excavation - Walls Only
$ 11.51
CY
100
$ 1,151.00
203.04
Excavation - New Inlet
$ 404.87
EA
5
$ 2,024.35
203.05
Borrow - Less than 100 Ton
$ 31.37
TON
75
$ 2,352,75
203.06
Borrow - Over 100 Ton
$ 27.08
TON
75
$ 2,031.00
210.01
Reset Brick Pavers
$ 7.81
SF
185
$ 1,444.85
210.02
Adjust Manhole
$ 126.52
EA
10
is
$ 1,265.20
210.03
Adjust Valve Box
$ 116.40
1 EA
10
1,164.00
304.01 Aggregate Base Course $ 26.47 1 TON 1 150 $ 3,970.50
403.01 Temporary Asphalt Patching $ 90.09 J TON 100 1 $ 9,009.00
602.01
Reinforcing Steel
$ 0.47
LB
500
$ 235.00
602.02
Reinforcing Steel -Epoxy Coated
$ 0.97
LB
500
Is 485.00
604.01
Reconstruct Inlet Deck - Catch Basin (R&R)
$ 1,126.11
EA
5
$ 5,630.55
604.02
Reconstruct Inlet Deck - Additional Fool Opening (R&R)
$ 185_8l
IT
to
$ 1,858.I0
604.03
Reconstruct Curb Inlet Deck - 4' Opening (R&R)
$ 1,858.08
EA
5
$ 9,290.40
604.04
Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R)
$ 185.81
IT
to
$ 1,858.10
604,05
Area Inlet
$ 1,126.11
EA
5
$ 5,630.55
60406
Type R Inlet - 5' Opening
$ 1,914.39
EA
5
$ 9.571.90
604.07
Type R Inlet -Additional Foot Opening
$ 235.69
LF
5
$ 1,178.45
604.08
Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb
Bonnet (East Jordan Ironworks 7030 or Equivalent)
$ 1,632.86
EA
5
$ 8,164.30
604.09
Concrete Sidewalk Culvert
$ 378.23
EA
5
$ 1,891.15
604.10
Metal Sidewalk Culvert -2' Opening, 5/8" plate
$ I,267A 1
EA
10
S 12,674.10
604 111
Additional Square Foot 5/8" Plate
$ 1 1 1.53
SF
10
$ 1,115.30
609.01
Driveover Curb, Gutter & 4" Sidewalk
$ 20,61
LF
10)O
$ 20,610.00
608.02
Driveover Curb, Gutter & 6" Sidewalk
$ 22.91
LF
1,000
$ 22,910.00
608.03
Driveover Curb and Gutter - No Sidewalk
$ 17.58
LF
125
$ 2,19Z50
Page I of 3
SECTION 00330 CITY OF FORT COLLINS
BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO.5911 -2007 RENEWAL
ITEM
NO
DESCRIPTION
2007 UNIT
PRICE
UNIT
ESTIMATED
QUANTITY
TOTAL COST
608.04
Driveover Curb, Gutter and 6" Drive Approach
$ 24.51
LF
200
$ 4,902.00
608.05
Vertical Curb, Gutter and 4" Sidewalk
$ 22.70
LF
300
$ 6,810.00
608.06
Vertical Curb, Gutter and 6" Sidewalk
$ 25.15
LF
100
$ 2,515.00
608.07
Vertical Curb and Gutter - No Sidewalk
$ 18.64
LF
500
$ 9,320.00
608.08
Vertical Curb, Gutter and Drive Approach
$ 25.84
LF
150
$ 3,876.00
608.09
Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk
$ 19.44
LF
75
$ 1,458.00
608.10
Out Fall Curb & Gutter
$ 17.68
LF
100
$ 1,768.00
608,11
Hollywood Curb, Gutter and 4" Sidewalk
$ 17.05
LF
250
$ 4,262.50
608.12
Hollywood Curb, Gutter and 6" Sidewalk
$ 18.12
LF
250
$ 4,530.00
608.13
Hollywood Curb and Gutter- No Sidewalk
$ 14.65
LF
75
$ 1,098.75
608.14
Hollywood Curb, Gutter and Drive Approach
$ 18.64
LF
150
$ 2,796.00
608.15
Highback Curb and Gutter - No Sidewalk
$ 26.64
LF
500
$ t 3,320.00
608.16
Highback Curb, Gutter and Drive Approach
$ 28.98
LF
150
$ 4,347.00
608.17
Barrier Curb - 6" x I8"
$ 21.31
LF
150
$ 3,196.50
608.18
Barrier Curb - Key Way Style
$ 24.83
LF
150
$ 3,724.50
609.19
Barrier Curb - Epoxy
$ 19.71
LF
ISO
$ 2,956.50
608.20
Mountable Curb -12"x18"
$ 22.37
IF
150
$ 3,355.50
608.21
Mountable Curb - Key Way Style
$ 26.00
LF
150
$ 3,900,00
608.22
Mountable Curb - Epoxy
$ 23.65
LF
150
$ 3,547.50
608.23
Pedestrian Access Ramp, Driveover Curb
$ 33.57
LF
ISO
$ 5,035.50
608.24
Pedestrian Access Ramp, Vertical Curb
$ 32.50
LF
100
$ 3,250.00
608.25
Pedestrian Access Ramp, Hollywood Curb
$ 26.42
LF
I50
$ 3,963.00
608.26
Pedestrian Access Ramp, Highback Curb
$ 6.50
SF
375
$ 2,437.50
609.27
Truncated Dome Panel
$ 42.70
SF
IN
$ 4,270.00
60&28
Apron-8"
$ 5.86
SF
500
$ 2,930.00
608.29
Crosspan-8"
$ 5.01
SF
750
$ 3,757.50
608.30
Valley Pan -6"Depth
$ 6.66
SF
350
$ 2,331.00
608.31
Flatwork-4"
$ 2.97
SF
4,000
$ 11,480.00
608,32
Flatwork-6"
$ 3.46
SF
1,500
$ 5,190.00
608.33
Replace Flatwork - I" Additional Depth
$ 0.57
SF
250
$ 142.50
608.34
Concrete Pavement 8" (Joints Sealed)
$ 4.99
SF
1,500
$ 7,485.00
60835
Alley Approach - 8"
$ 5.34
LF
100
$ 534.00
609.36
Enhanced Crosswalk - 10" Tile Red
$ 10.65
SF
150
$ 1,597.50
608.37
Enhanced Crosswalk- 10" San Diego Buff
$ 10.06
SF
150
$ 1,509.00
608.38
Enhanced Crosswalk - 10" Brick Red. Stamped
$ 12.67
SF
150
$ 1,900,50
608.39
Colored Trail with Fiberrnesh -5" Yosemite Brown
$ 4.25
SF
500
$ 2,125.00
608.40
Mow Strip - 4" x 12"
$ 10.01
LF
500
$ 5,005.00
608.41
Splashblock - 4" Exposed Aggregate
$ 5.86
SF
500
$ 2,930.00
608.42
Splashblock - 4" San Diego Buff
$ 6.18
SF
500
$ 3,090.00
608.43
Median Cover - 4" San Diego Buff
$ 6. N
SF
500
$ 3.090.00
60SA4
Fibennesh - Added to Any Item, Additional Charge
S 5.26
IAVCY
100
$ 526.00
608,45
24 Hour High Early Concrete - Added to Any Item, Additional
Charge
$ 17.54
CY
50
$ 877.00
608.46
Stamp Pattern - Added to Any Item. Additional Charge
$ 234
SF
150
$ 351.00
608.47
6" Concrete Bollard
$ 82,63
EA
5
$ 413.15
608.48
8" Concrete Bollard
$ 99.15
EA
5
$ 495.75
608.49
Flowable Fill
$ 64.25
CY
25
$ 1,606.25
608.50
Non -reinforced Concrete Wall-8"
$ 12,78
SFF
500
$ 6390.00
608.51
Non -reinforced Concrete Tooter-8"
S 13,84
SF
225
$ 3,114.00
608.52
Concrete Staining/Sealing
$ 2.83
SF
150
$ 424,50
608.53
Expansion and Sealing
$ 4.20
LF
250
$ 1,050.00
608.54
.loint Sealant
$ 2.35
LF
100
$ 235,00
Page 2 rf 3
SECTION 00330
BID SCHEDULE
CITY OF FORT COLLINS
MISCELLANEOUS CONCRETE PROJECT
BID NO.5911 - 2007 RENEWAL
ITEM
2007 UNIT
ESTIMATED
NO
DESCRIPTION
PRICE
UNIT
QUANTITY
TOTAL COST
608.55
Class D Concrete
IS 104.80
1 Cy
20
$ 2,096.00
626.01 Mobilization- Invoices Under $500 $ 283.40 1 Lump Sum 1 25 1 $ 7,085.00
630.01
"NO PARKING" Sign With Stand
$ 1.50
Per Day Per Each
375
$ 562.50
630.02
Vertical Panel Without Light
$ 0.87
Per Day Per Each
50
$ 43.50
630.03
Chaimelizing Barrels
$ 0.77
Per Day Per Each
50
$ 38.50
630.04
Type I Barricade Without Light
$ 0.77
Per Day Per Each
750
$ 577.50
630.05
Type 11 Barricade Without Light
$ 0.77
Per Day Per Each
20
$ 15.40
630.06
Type III Barricade Without Light
$ 3.05
Per Day Per Each
20
$ 61.00
630.07
Size A Sign With Stand
$ 1.45
Per Day Per Each
225
$ 326.25
630.08
Size B Sign With Stand
$ 1.60
Per Day Per Each
20
$ 32.00
630.09
Size A Specialty Sign - Cost of Manufacturing
$ 78.00
Each
2
$ 156.00
630.10
Size B Specialty Sign - Cost of Manufacturing
$ 78.00
Each
2
$ 156.00
630.11
Cone With Reflective Strip
$ 0.62
Per Day Per Each
375
$ 232.50
630.12
Safety Fence
$ 5.10
Per Day Per Roll
20
$ 102.00
630.13
Light
$ 0.51
Per Day Per Each
20
$ 10.20
630.14
Advance Wanting Flashing - or Sequencing Arrow Panel
$ 71.00
Per Unit Per Day
5
$ 355.00
630.15
Variable Message Board
$ 129.50
Per Unit Per Day
10
$ 1,285.00
630.16
Traffic Control Supervisor
$ 303.65
Per Day
25
$ 7,591.25
630.17
Traffic Control Supervisor
$ 31.37
Per Hour
100
$ 3,137.00
630.18
Flagging
$ 19.23
Per Hour
150
$ 2,884.50
FORCE ACCOUNT LABOR RATES
*Materials will carry a 10% markup from the original invoice for costs $500 and below, and an 8% markup for invoices greater than $500
*Attach hourly Equipment/Operator rates to be used for Force Account work
FAI
Laborer
$ 22.32
Hour
15
$
334.80
FA2
Foreman
S 37.20
Hour
15
$
558.00
FA3
Finisher
$ 30.82
Hour
15
$
462.30
FA4
Form Setter
$ 29.23
Hour
15
$
438.45
TOTAL COST $ 360,567.25
Three Hundred Sixty Thousand, Five Hundred Sixty Seven Dollars and
Signed
Company Express Concrete tnc.
Check One:
Individual Doing Business in Company Name
X Corporation
Partnership
Address
Phone/Fax
Twenty Five Cents.
5305 S. Ziegler Road
Fort Collins, CO 80528
970.225.1287 970.229.0846
Page 3 of3
RmtTlOY 00]y
uneuuLe
OF Pti0.TCOL3.M5
!.11SCeLL.W EO118.1w..III PRNeCT
""
.o11n-1.In1
f
il
J
��
.IIn
- �
IT
1
r
,L
J
F
17
t�'a 5 tAia,m
no
a i i 3 i iw
y y i. 1 _ate i
f
f,11
—
r
�
fi
�
ow 1,,--1
�
I Ill no
mom
ON
SV.CTIUN CC]]f
P1p N11HO1N.0
fIT1'UF rONJ'rO1.LNY
M1 SCeL1.,WHOtiHCONCRHTH YPaJNri
B0 Va.t911 SPo'I MNNeWN.
IWfIMR
[MMAnP
M
YiW lrtrtw
L.6�MMMtl
MnJ
dery 11
IpM IMIt
HBf tOTN.
LIEMN
ORM'RPt1ON
1RIr[
rMR
lL1MR1'2
toTLL C042
m4%rtrt•
Il%
wrtrt lAx
rPN'[
XYnw
wxb
t
5
1
W f
0
3
bs
1.
W P-1
F11A..L1
v ona% Nccwlm L.iHOP Pnns
•M.I.n.N w..m • 1 m ww.v n.., Ir •JrdJ d.w. d. M. Pvof ..n rw., wl � N%..,y x. d.J.n P,.J.. �P� aw
a�.H mnro dl�m,n+ww.n, wn 1. n ...n m. rw. arto,tl ..n
la�vv
S
t
i
.4W
J)xC)
ISv
f
TOt.LLrnFr > SMAlF94 S .y0.41.M .11%
SECTION MOM CHI YOF FOR I'COLLI NS
BIDSCHEDVIR NISCELLVSKOOS CONCRETE PRO
BID NO. 5911- IBD] RENEWAL
I W3.011Fimwlmn.(ia il-IMn50C1 15 62001 CY 1 150 15 9d0.1ml IS OmIS I'm 1 IS 62761S 9A14.001 1.D .1
fi1.02
E.D--G.r 0-501Y
S 5500
CY
1511
IS SAIDDO
1
S 'Im
S 0.61
5 56b.
5 9102.00
1,21%
Xf\OS
F,xavalun Wa16'OAY
S 111J
CV
Ifq
S Lill)D
S 001
S O.l?,
S 1151
S I.IS100
l:t;'.
2111.04
E.vavallw-New DA,
S 1CO.W
EA
5
S 3.001,00
5 045
S 4.42
5 414.97
S 2024.35
1.M..
'O1.D5
&mtm'-L[a Oun lUl Tan
S 31.00
TON
TS
5 't_5,011
S 0.01
5 0,34
S Jill
S 3152.75
1.19':
201.06
Bamw-Il 10DTon
f M,]5
'TN
15
S 200fi?5
S 0.03
S O.IO
5 29.ON
5 2011.00
123%
21091
ReM DM1:k Paxir
S '!ll
%V
18S
S 1.A2615
5 D0[
5 I
S Ili
5 1_444AU Ilp%
210112
m]u,Dmw lc
f 12i00
LS
10
S 1.2511.IXI
S 0.14
I IlR
5 12652
S 1.26521 I.a356
'_I003
Adfua Vulv<Box
S IS oD
EA
ID
S I.I511.00
S D.IJ
5 1.27
5 116.
S 1.164.P1
3W.01 Apgtegalc Bare Cawxe 5 25.111 TON I511 5 l.]6500 S I.J4 S V.D3 f 1.4] f 1.Y]0.05 5.45}b
401.DI Trmlxmlry Ary#oltPo ltir.5 5 N540 11)N Iql 1 N344.W S 455 E 010 5 MI.pY f 9.OIp ]0 5.44%
W201
R-1111gyleN
f 1)41
ID
SfA
3 20SI10
S 0W
F 0,4]
F P5.00
14,1i1^,:
fiD2 U2
ReiWbniry VlxlEplxy CaalW
5 D.14
LB
5W
5 4q,OD
5 013
S DO
S 4N5,g1
11 U'.
60401
Rnonxlttmtlnkllbk-Calchib,"I(MR)
5 1.028.W
kA
5
F 5.1411(41
S 54I6
5 1.14
S 11.16
5 30.94
$ L1MM
5 5b105,1
914,
604,02
Ilm-ty,I) ak-A 111olulFwt OlaniMP4R)
S {69 fi+
LF
ID
5 1.6`M,211
5 `JIA
S 011)
S 131
S SSO
5 INTNI
S I.m,,M
954•F
fiO4.01
R--tiro f'nN lrbt Dnk 4'(1Woing(MR,
5 ID"2➢
L5
S NAR1DO
S Do 16
S I89
S IN.)4
5 SO.N9
5 I.%SN ON
5 'I J01X
9S4":
604114
R-mlDy,l(urblolq Dtxi tW111tio Il-IOµlulWE&R)
S 169l,l
LF
10
$ 1.6. JI
S 'l 111
S DID
S 187
S 5.119
S .181
S IXS9 09
1)11%
W4.05
Atu 1*1
S 1.02Rg1
EN
5 5.I411,DID
-1 54.76
S 1,14
$ 11.36
$ 1044
S I_I26.I1
S 5.631131
9.54%
604Cfi
'I'pq Rblky-5'0'..lg
S I.]4'1,fi0
IA
5
F x.'I1 N.IIU
E 91.IU
3 195
S1911
S 51_43
f 1.91418
3 15II91
9.54'sa
604.07
TY 9lnkt- AJJltwml I ... IOuninp
Y 2?616
LF
5 Ll I()SD
$ 1)25
S ]50
N 6,99
$ 31 ,61)
S 1,171.47
4.12..
6114.tIX
CtmF.t '.nTYW IS Cvahltk F tw.4c0e&AdjuewMeCwh
Bt Ilvrl loNun lnttm k. tll,lll INoiwluvtll
S 1EXI NI
FA
5
7,11l I'll
S 794I
S I
S 16,4]
S 4.4,72
51.63'96
S N.IM1411
11145:.
60411)
CUIKtAe Sgn.N t'III
S 355.00
4A
5
ts I.))5.00
S Ix91
5 1141)
S 1J2
5 178 23
f I,N91.I1
HW.10
61<Iul Sgjlk Cohen-T()Ixll,q, 5N-Vlnle
E 11IL(XI
RA
III
5 11,75110
S 1295
S N43
S 1,26741
S I'_.fi14.14
9.l%
Loy 11
MMitlt.u11t S4tlmekwt SR.'Natc
5 Ill'
11
ID
S I.Ql4DD
% IA4
5 fi9
S I1153
S 1.115-31
1`l7l,
W8601
Dn'tuvc Cul Gm1a 34" Skkwolk
S 1915
Li
LAW
S 1`J150.PD
S 1.01
S 1,
F (121
5 10661
S 20,611_00
6.5_9:
60801
Dthww CuM(iDw&6"Svkwulk
5 2150
LP
I'000
S 1131N)W
S 1.15
% 1)L2
S 024
S 2U'1
S 21 PIS OD
6.51%
NJR.03
Dn'nnvm Curl,l GWler-NOSNwulk
S J650
LF
125
$ 2.OM1'.SO
% (IS
S I)D2
5 O.IN
S 1759
S '_.ID 50
655:
(0A90
13eiv.ova CuM Gunu aM 6"1>mv .Nl6nwefi
S 21.1
LF
y'D
5 4,611I-W
S 111
5 11113
S OLS
S 1411
$ 4591,00
R54°;,
,,1115
Val-1 CUN. GIIIn+aN V S,&-A
% 21-I0
11
I'll
Y 61-11.00
S I.11
b 002
% 0.11
S L'I)
S 6.XIIX 50
`-.,
601116
l'mialI KBolin aM 6"SO-11,
5 21611
1F
100
S ;.16111111
S 1.16
5 11.01
S 1116
$ 2511
5 2314]0
656'..
ws 11]
Nmrtal ('Ob iW Gulley -Nu 1.&e Ilk
1150
Ill
$011
S 1.151111
5 1191
% 0.01
5 (1. 01
S IN,"
S 9J211D)
1111.
6UX(IN
Venial I llK GtOtrad Dnve Aglnme4
5 24.'5
11
ND
% I63710
1 129
S 1103
S 1).2]
S 15. 14
5 11161D
656%
ft1R_p)
Y\Tv.�l ('mF.tiutux uN 6'. Am -,,-NOS' Ay
S 11A_'S
"I
Is
S I.11I
5 09I
% 002
5 t120
S "I,
F 1,159.
60NIll
Uu11111 CUNS olll-
S MW
It
I'll
Y II.6D00
% '181
5 0.02
S (1 11
S I'Gy
$ 1,761 Ill
fi51":
60P 11
lulywtW Cnl4 Gutlm aM C Sidewalk
S IG011
LF
III
% 41.111111
5 0X5
S D.02
5 II.IN
; 17.05
5 4212511
6.5fi""
60N. 1'_
11u11,-d CIA, Guth vJ 6-SA-11
S IIIXI
11
IS,
S 4.2511.00
S 091
S 0,02
$ (119
S I8.12
S 43'01111
E.19":
6DN.11
IL II avl Curbarcl Ou(m-Nu Sidewalk
1175
IF
'l5
S Im125
S 11 '1
3 O,O'
S I11
% 1465
5 I.09%]5
6UN_14
Il Alymud1 KQ. uW DAm Ay{a {t
S I151)
Id
00
S 2425Nt
5 091
S 0112
S (IN
S 11 "1
% 2]961p
11.1
60X, 15
IliglDwek Cueb aN Gult -NO Ilcl k
S 211q
Ik
SOD
% 12 SW,w
5 I"
S 0,01
S 1)11
5 1164
% I1.121I'll
25I":.
MIN11Il
g?Atek Cully G.D, o.. Ill,. TDlmttll
3
LI
13D
S -4.l1l, rl
5 Iy5
S I01
5 O.IU
; 3R.9R
S '30
654",.
WSI]
Bathe+Cody-6"x IV
E 20,1X1
I,F
150
S 3!10000
S I,I?
II.D2
J 0_'
S 2111
5 1.195.]5
60A.IN
Dwrv_i ( -ntll-Key Wy51y4
S 2130
II'
ISO
F 3, I95W
$ 124
S D.01
$ 1) 11
% 24 X1
S 1]1465
11 11,
6aX.19
Bmnernn ,ill,"Y
S 1R10
LF
1511
s 1]r 1a
5 Ds9
s DD2
s 112D
S I9o1
5 1,956ID
6.54•:
60A.20
6t1v21
Nwnnnbk C.". 1'. w
lltrvnnlliceam. Et, w%sNk
5 21n0
% 14N1
IJ'
IN)
a U"'I",
% 1.12
s 002
6 OD
5 2117
s 155_I,
d52•.:.
u'
IID
5 unnw
5 1.11
% D.11
5 1111
% zn,D(,
5 lanJw
60 .22
AI EI b-Kpinr
% 21?0
I
Ull
I 1LOIID
N I,IN
S II112
X Di1
1 YI, 65
F 1,54111
-
60121
k k pyc-,R., I.-..
t'.. Coll,
$ lI.1'I
1_1
151)
{. 1]2111
S 111
% 004
5 O15
$ -\3.1]
S SDi52D
.IF 24
P d A- Rainy l Ll I Call
lllkldll
% 1d50
24ND
I
1111,
3J15DI110
s 1 E1
$ 11"1
$ 1114
5 1_',511
E l'49.SD
6.54"0
60R3
I.1'
I50
b 1,121. Ill
$ I.1'
5 11 it
1 DDI
5 DI)I
5 11 1?
e 11,.42
6L1
S 195
.1126
1"duTun 1y'.cra Pl,", l',WrIyi Cmb
5 111
[I'
t]5
S _TIi.50
5 1111
5 650
5 2.41i 41
ID, 11
lrudvlad U.mx Vurcl
S RI X1
,SIB
IW
1 4,111111110
6 2,10
S 42.711
S 4.2711Ill
(i0X._x
Alnun-1."'
1 5.50
11
SP)
% '.."I'll
S 1129
S 001
1 D,116
$ _1.16
S 2.911k1b
CID, 11
4711
On
S 1
b 0DI
5 005
60910
a0 *31
"II Imt-6"Uµt16
M41tv.xk-4"
11.,- D.
Y 6.21
SI'
150
S 2.I17.S1
$ 011
§ 001
$ 001
S 666
E 121,U0
S iD
S1
6Mt1
$ It x00lut
1"1110
U.10
% 1111
]
F ON
S
1 II iµUM
w
6UN.1'
Ii
.S1
ISW
'<D
)
11114
e 1.41
S 5.19D Ill
1146".,
6PX1J
1<IL 1.1,111A I -Add tlallluylh
Y I1,Ct
tl:
F Il'cD
$ ODt
5
6 DDI
5 1) 11
s luuD
91p•,.
"'I'
I1-1n Fnrne N^a.lnb salmi
ADe5AI4a0� 1"
5 uN
SL
150
1 1.12DOD
s le5
% Dz]
% 11 Ill
$ (I'll
ua5
$ 499
S ]aNSDD
6!�'A
61111
-;-1
S vw
11
I'll
% Sau1
g Doe
ss4
5 514PD
6Xw:.
16
Il hi ewl C�..n A 1D^laeRed
5 ID.OD
4
1NI
s 1111 (15
D-1
5 DDI
s nu
% m65
s 15v;5u
e+nr.
I'll 11
AI NtS
(oX 19
I x'ed ('nlaluulk-I.'S C."q 13nR
l.h vlllaowa&-It B A%o, $Ino10e'J
I- d Imil-E llhn M1 1'.1x'milc l3nnrn
S 9J5
51
ISIt
% 1411ep
b 11X�N1
% D_VI
$ D61
5 oDl
i Dln
S Io,Ofi
% 1,1091111
646":
3 II.M
5 411U
Sl
SF
110
5 Pnl
F1rv1:
% 1'6]
t 1`AlO ll
h:IT.
_1oDI1D5
116
611A.4o I61me 111ia�4'n1" Y '1401 11 n0 % 4lnDDl1 S 11JI
SECTION (BUFF
RIONCIIF.OULE
CITY (IF FORT COLLINS
MISCULANEOUN CONCRETE PRNECT
RID NO. 5911-SAY? RF.NEWN,
ITEH
NO
DF&C'RIPIION
LTOT PRICE
UNtt
ESTIMATED
UANTITT
TOTAL COST(15%)
C-.N lavnw
F-11-
O%)
I.xh-KmmlW
IwwO.4%)
NlwNII awe0
16%)
WUNIT
PRICE
WTOM
COST
%l.em.e
IN 41
SpIzIllb"-T- V E.apwl Aggrtyllu
S 550
SF
Soo
$ 3.750.01)
S 0T1
S 0.01
S O,IM
S 3N6
S 2930.M
R55•N..
NIN.42
SplvfiM1h t-C So DD,,, Buff
$ 5,10
Sf
500
5 I.90OW
S 11-11
S II.01
S DAN
1 FIN
$ 1.090ANI
615.
60843
MWion Cora-V Sw Diego ONI
S 511
5)'
5Do
S "i NLW
$ 0_11
1 0,01
S (IM
1 61g
S 3J19O.Ib
655%.
ON 44
Iihmmcr4- AJdotl SUy ISN. AldlIvvml ChNS,
S 1SI
LU!(Y
DO
$ 3]000
S Dow
S 126
S 526,01)
IJ5%
NJ641
$e nno high FIFE CUD¢a-ntldul w.4n I, l&h mil
C
S 16.65
(A-
50
S g1251I
S 0IN
S 1].54
S C7NO
335%
60NA6
Summp PAFiIN 'uxktlw Any ikm AdNtxNOl Ching,
$ 2.20
IF
150
5 11(I,00
5 11.12
f
S 002
S IN
S 15051
614%
NIV 47
6-Crue1e FUIWN
5 77,55
EA
5
S 19]_95
S 4.12
F 009
S O96
5 1261
S 411.IR
6551.
ND 48
1'lo-IN ryIIIII
S 91,116
FA
I
5 465.10
S 4_IN
$ 0111
S 1.01
5 11)15
5 49594
6.54%
MR,II
FbwuMel'01
1 M1I.110
1'Y
3
5 1315W
S 1.25
$ R4, 25
5 I.w25
511;0
WS`iD
NOFM,N,,xltl ClTITC W411-I.
S IS.W
111
500
5 "ON) NO
$ 064
S DOI
5 0,11
5 I219
S 6JWPo
65P.
60N.51
NomrehJal Cwcrcle Funet-N'
Y Iilp
IF
225
2925.00
5 069
% 0.01
S U.14
f Il.N4
3 1.114.5/
fi4N•/.
601,52
Cl ,.SFFNIN SVlhng
S S,NO
IF
I50
S 420oo
1 001
S _'.S1
4 43450
I11]%
611N,S1
lI,.N,.D w Swfi.,
5 4.1'
I.F
250
5 1111250
S P.OS
f 4.Y1
E I.OSILIYJ
131N.
NIS14
loim S.M.
t 215
11
100
S 21500
5 2J5
5 2l}110
OpP/.
6ONS5
(W., 11 C.
1 9950
CY'
20
F I.,FODO
S St0
I W4.811
S 2,0M,V2
513%
R25Af bh•Mlbwnn Im+�xaDUINa SSW S IF*N) IO,N, Swn 3 S '(.WO.WI W I 9.O15.W L_I%
71OOl
W)FARKING'Sign Wilh SUM
S. ISF
Pv Duy Px F.Duh
175
S 5(250
110.02
Valkul P.1 WOhwI LON,
5 007
Part IN, Pa Fuh
50
5 4i.50
D.00%
6JOA1
Chw JuS, Ovlck
S 091
Pv Duy Pa F.h
50
S 11.9)
0.OW.
RM,NF
Type I &m`cxh IN. I"N
S U 9]
Pa Dry Pa f-k
1511
5 S71.50
0 wY
INIO5
lyp' II D,urv.'xb WiIMOI LigN
1 O]l
Pa D. Pa L-h
10
5 1541)
OPEN
6I0.IM
Ty11e OFAi r.'l Wi0xml l.igM1l
S 105
Ell Doy Pa Emh
SII
5 61.00
O.OW.
RJII.O'I
Sm:ASgn W d, SW'M
5 11
Pa Day Lch
3b
S 126.25
0-OF
6,10.01:
Six U Sign Wuh Slaty
1 1611
Pv Dry Pa F.a'h
2D
S 1200
0WK
R1U,09
Six AClvhahy EYn-Caw o(Mmmf Txnp
S ]%W
F-,
S 1,w
1W-4
VOAO
Sirv:RSD-W],SN' ('MI Mwu6INIFS
S 18.011
FyA
1
S 156DO
0.
610.11
Cmc WIN Reilm iw SNIP
1 0.63
Pn Dry Pa FxA
III
S 21250
0.00%
63I1.12
Su4ry Punt
F 510
Pa Duy Pa Roll
N
5 1020,
O.W,.
630.11
I.igM
S IISI
Per Day Pa L4M1
20
S 10ID
oWNl
RI0.14
,Wr-mcW'xwgYWxq-rx Slalaa-.ing Nnw Pawl
5 ll lNl
Pa Urw Pa LL.ry
5
5 i55(q
O,qY/
41D.15
V'vrWM Muv'age [HwN
b 12N-W
PU Unh Pa lTy
III
1 I_"RS.W
DUO%,
6IO.Ifi
ie1DY'COnU.l Supaviaer
f 111p1N1
Pn Duy
25
5 )SOJ.gI
S O.11
S 3.12
101,65
$MY
S ]S91.I1
122%
61111]
Tank C.gn,l tioµ+virert
F 11.110
Pa llulm
IDO
I 1. woo
S DOl
I OFF
1137
5 l.11].00
I.II•%,
RIILIR
FLgging
5 19.00
Pa dour
IN
S 2,g50 DO
5 1102
S 031
IHD
S 18F4%
121%
FORCE ACCOUNT LABOR RAFg:S
`Nxrtr4Y wgl I, a WA wvkap IN. Sm or.Rw bvolw Sor erne FSIEI xoe 6eFw, vptl IN 8%oxhup Iw bvWa grub IS- SSpI
`S.1-1, 9.9Npool)ppmna-im. IN 1Ued Ior F-Am-,-A
PAI
I�6rcur
5 11.59
Ilwr
IS
5 121.85
S 0'11
S 2212
S 134.86
1.40.11
I.1E
Femnuln
$ 15.99
Ilum
IS
5-5.19.]0
S II)
1 l710
S 55505
340%
I:ll
IuuUxv
S 29 I
hour
IS
I S 441.15
S I.Pt
S NI2
S 462l5
1CM:
F\4
Donn \ulla
1 ]N']
IlolD
15
1 424.01
F 0.96
F 1921
S 4,1g.47
1,40%
TOT N.COST 1 141E89195 1 156,M4-'N 4,61%
2. Terminate the subcontract with the subcontractor if within three days of receiving the
notice required pursuant to this section the subcontractor does not cease employing
or contracting with the illegal alien; except that Contractor shall not terminate the
contract with the subcontractor if during such three days the subcontractor provides
information to establish that the subcontractor has not knowingly employed or
contracted with an illegal alien.
Contractor shall comply with any reasonable request by the Colorado Department of
Labor and Employment (the "Department") made in the course of an investigation that the
Department undertakes or is undertaking pursuant to the authority established in
Subsection 8-17.5-102 (5), C.R.S.
G. If Contractor violates any provision of this Agreement pertaining to the duties imposed by
Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement
is so terminated, Contractor shall be liable for actual and consequential damages to the
City arising out of Contractor's violation of Subsection 8-17.5-102, C.R.S.
H. The City will notify the Office of the Secretary of State if Contractor violates this provision
of this Agreement and the City terminates the Agreement for such breach.
The term will be extended for one (1) additional year, May 1, 2007 through April 30, 2008.
If the renewal is acceptable to your firm, please sign this letter in the space provided and return it
to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO 85022, within the
next fifteen days.
If this extension is not agreeable with your firm, we ask that you send us a written notice stating that
you do not wish to renew the contract and state the reason for non -renewal.
Please contact John D. Stephen CPPO, CPPB, Senior Buyer, at (970) 221-6777 if you have
questions.
Sincerely, '
m B. O'Neill II, CPPO, FNIGP
i ctor o urchasing and Risk Management
fJ'7�
Signat e �/ Date
(Please indicate your desire to renew 5911 by signing this letter and returning it to Purchasing
Division within the next fifteen days.)
ENCL: 2007 Bid Schedule
JBO:cj
CITY OF FORT COLLINS
BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO.5911 - 2007 RENEWAL
17Jity!
DISC, `l'tiPTiC'YN
200 j`f3N1i
PWI
UNIT
ESi(9T �BD
UAN=1' `I"Y
'T45TAi. O '!'
202.01
Sawcut Concrete/Asphalt < 4"
$ 2.19
LF
25
$ 54.75
202.02
Sawcut Concrete/Asphalt 4":5 6"
$ 2.72
LF
25
S 68.00
202.03
Sawcut Conerete/Aspholt 6" S 8"
$ 3.40
LF
25
$ 85.00
202.04
Sawcut Concrete/Aspbalt 8" <_ 10"
$ 4.71
LF
25
$ 117.75
202.05
ISawcut - Additional l"Depth
$ 0.79
LF
25
$ 19.75
202.06
Remove Concrete Sidewalk
$ 2.36
SF
1500
$ 3,540.00
202.07
Remove Concrete Curb and Gutter
$ 3.56
LF
250
$ 890.00
202.08
Remove Monolithic Curb, Gutter & Sidewalk
$ 2.41
SF
250
$ 602.50
202.09
Remove Concrete Driveway/Apron/Cmsspan
$ 2.56
SF
750
$ 1,920.00
202.10
Remove Concrete Pavement - 10"
$ 3.97
SF
500
$ 1,985.00
202.11
Remove Concrete Pavement - Additional 1" Depth
$ 0.41
SF
50
$ 20.50
202.12
Remove Asphalt - 6"
$ 2.19
SF
250
$ 547.50
202.13
Remove Asphalt -Additional l"Depth
$ 0.41
SF
50
$ 20.50
202.14
Remove Inlet
$ 549.45
EA
5
$ 2,747.25
202AS
Remove and Haul Driveway Fillets
S 52,33
EA
5
S 261.65
202.16
Remove Flagstone
$ 2.98
SF
100
$ 298.00
203.01
Excavation - General Less Than 50 CY
$ 62.76
CY
150
$ 9,414.00
203.02
Excavation- General Over 50 CY
$ 56,68
CY
150
S 8,502.00
203.03
Excavation - Walls Only
$ 11.51
CY
100
$ 1,151.00
203.04
Excavation -New Inlet
$ 404.87
EA
5
$ 2,024.35
203.05
Borrow- Less than 100 Ton
$ 31.37
TON
75
S 2,352.75
203.06
Borrow - Over 100 Ton
$ 27.08
TON
75
$ 2,031.00
M0.01
Reset Brick Pavers
S 7.91
1 SF
185
$ 1,444.95
210.02
lAdjustMarthole
$ 126.52
1 EA
10
$ 1,265.20
210.03
lAdjustValveBox
$ 116.40
1 EA
10
1 $ 1,164.00
304.01 Aggregate Base Course $ 26.47 TON 150 $ 3,970,50
403.01 Temporary Asphalt Patching $ 90.09 1 TON 1 100 $ 9,009.00
602.01
lReinforcingSteel
$ 0.47
1 LB
1 500
$ 235.00
602.02
lReinforcing Steel -Epoxy Coated
$ 0.97
1 LB
1 500
$ 485.00
604.01
Reconstruct Inlet Deck - Catch Basin (R&R)
$ 1,126.11
EA
5
$ 5,630.55
604.02
Reconstruct Inlet Deck - Additional Foot Opening (R&R)
$ 185.81
LF
10
$ 1,858.10
604.03
Reconstruct Curb Inlet Deck - 4' Opening (R&R)
$ 1,858.08
EA
5
$ 9,290.40
604.04
Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R)
$ N5.81
LF
10
$ 1,859.10
604.05
Area Inlet
S 1,126.11
EA
5
$ 5,630.55
604.06
Type R Inlet - 5' Opening - - -
$ 1,914.38
EA
5
$ 9,571.90
604.07
Type R Inlet - Additional Foot Opening
$ 235.69
LF
5
$ 1,178.45
604.08
Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb
Bormet (East Jordan Ironworks 7030 or Equivalent)
$ 1,632.86
EA
5
$ 8,164.30
604,09
Concrete Sidewalk Culvert
$ 378.23
EA
5
$ 1,891.15
604.10
Metal Sidewalk. Culvert - T Opening, 5/8" plate
$ 1,267,41
EA
!0
$ 12,674.10
604.11
Additional Square Foot 5/8" Plate
$ 111.53
SF
10
$ 1,115.30
608.01
Driveover Curb, Gutter & 4" Sidewalk
$ 20.61
LF
1,000
S 20,610.00
608.02
Driveover Curb, Gutter & 6" Sidewalk
I S 22.91
LF
1,000
$ 22,910.00
608.03
Driveover Curb and Gutter -No Sidewalk
$ 17.58
1 LF
125
Is 2,197.50
Page 1 of 3
CITY OF FORT COLLINS
BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT
BID NO.5911 - 2007 RENEWAL
ITEM
NO
DE$CRI1rIION
IIII1 itNIr
PRCCE
UNIT
Rc�nmEn
TOTAL COST
608.04
Driveover Curb, Gutter and 6" Drive Approach
$ 24.51
LF
200
$ 4,902.00
608.05
Vertical Curb,'Gutter and 4" Sidewalk
$ 22.70
LF
300
$ 6,810.00
608.06
Vertical Curb, Gutter and 6" Sidewalk
$ 25.15
LF
100
$ 2,515.00
608.07
Vertical Curb and Gutter- No Sidewalk
$ 18.64
LF
500
$ 9,320.00
608.08
Vertical Curb, Gutter and Drive Approach
$ 25.84
LF
150 1
$ 3,876.00
608.09
Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk
$ 19.44
LF
75 Is
1,458.00
608.10
Out Fall Curb & Gutter
$ 17.68
LF
100
$ 1,768.00
608.11
Hollywood Curb, Gutter and 4" Sidewalk
$ 17.05
LF
250
$ 4,262.50
608.12
Hollywood Curb, Gutter and 6" Sidewalk
$ 18.12
LF
250
$ 4,530.00
608.13
Hollywood Curb and Gutter- No Sidewalk
$ 14.65
LF
75
$ 1,098.75
608.14
Hollywood Curb, Gutter and Drive Approach
$ 18.64
LF
150
$ 2,796.00
608.15
Highback Curb and Gutter - No Sidewalk
$ 26.64
LF
500
$ 13,320.00
608.16
Highback Curb, Gutter and Drive Approach
$ 28.98
LF
150 Is
4,347.00
608.17
Barrier Curb - 6" x 18"
$ 21.31
LF
150
$ 3,196.50
608.18
Barrier Curb - Key Way Style
$ 24.83
IF
150
$ 3,724.50
608.19
Barrier Curb - Epoxy
$ 19.71
LF
ISO
$ 2,956.50
608.20
Mountable Curb - 12" x 18"
$ 22.37
LF
150
$ 3,355.50
608.21
Mountable Curb - Key Way Style
$ 26.00
LF
150
$ 3,900.00
608.22
Mountable Curb - Epoxy
$ 23.65
IF
I50
$ 3,547.50
608.23
Pedestrian Access Ramp, Driveover Curb
$ 33.57
IF
150
$ 5,035.50
60K24
Pedestrian Access Ramp, Vertical Curb
$ 32.50
LF
100
$ 3,250.00
60&25
Pedestrian Access Ramp, Hollywood Curb
$ 26.42
LF
ISO
$ 3,963.00
608.26
Pedestrian Access Ramp, Highback Curb
$ 6.50
SF
375
$ 2,437.50
608.27
Truncated Dome Panel
$ 42.70
SF
100
S 4,270.00
608.28
Apron -8"
$ 5.86
SF
500
$ 2,930.00
608.29
Crosspan-8"
$ 5.01
SF
750
$ 3,757.50
608.30
Valley Pan - 6" Depth
$ 6.66
SF
350
$ 2,331.00
608.31
Flatwork-4"
$ 2.87
SF
4,000
$ 11,480.00
608.32
Flatwork-6"
$ 3.46
SF
1,500
$ 5,190.00
608,33
Replace Flatwork - I" Additional Depth
$ 0.57
SF
250
$ 142.50
608.34
Concrete Pavement 8" (Joints Scaled)
$ 4.99
SF
1,500
$ 7,485.00
608.35
Alley Approach - 8"
$ 5.34
LF
l00
$ 534.00
608.36
Enhanced Crosswalk - 10" Tile Red
$ 10.65
SF
150
$ 1,597.50
608.37
Enhanced Crosswalk - 10" San Diego Buff
$ 10.06
SF
ISO
$ 1,509.00
608.38
Enhanced Crosswalk - 10" Brick Red, Stamped
$ 12.67
SF
150
Is 1,900.50
608.39
Colored Trail with Fibermesh - 5" Yosemite Brown
$ 4.25
SF
500
$ 2,125.00
608.40
Mow Strip - 4" x 12"
$ 10.01
IF
500
$ 5,005.00
608.41
Splashblock - 4" Exposed Aggregate
$ 5.86
SF
500
$ 2,930.00
608.42
Splashblock - 4" San Diego Buff
$ 6.18
SF
500
$ 3,090,00
608.43
Median Cover - 4" San Diego Buff
$ 6.18
SF
500
$ 3,090.00
608.44
Fibermesh - Added to Any Item, Additional Charge
$ 5.26
LB/CY
100
$ 526.00
608.45
24 Hour High Early Concrete - Added to Any Item, Additional
Charge
$ 17.54
CY
50
$ 877.00
609.46
Stamp Pattern - Added to Any Item, Additional Charge
$ 2.34
SF
150
$ 351.00
609.47
6" Concrete Bollard
$ 92.63
EA
5
$ 413.15
608.48
8" Concrete Bollard
$ 99.15
EA
5
$ 495.75
609.49
Flowable Fill
$ 64.25
CY
25
$ 1,606.25
609.50
Non -reinforced Concrete Wall - 8"
$ 12.79
SFF
500
$ 6,390.00
608.51
Non -reinforced Concrete Foot" - 8"
$ 13.94
SF
225
$ 3, 114.00
608.52
Concrete Staming6ealing
$ 2.83
SF
ISO
$ 424.50
608.53
Expansion and Sealing
$ 4.20
LF
2SO
$ 1,050.00
608.54
Joint Sealant
$ 2.35
LF
100
$ 235.00
Page 2 of 3
BIDSCHEDULE
CITY OF FORT COLLINS
MISCELLANEOUS CONCRETE PROJECT
BID NO. 5911 - 2007 RENEWAL
iT%M
DESCRIPTION
2i1o9t3N it
..
Esmmr r�TE»
,.
TOTALCO$T
1VQ
PRICEUNIT
UAN"PITY
608.55
jCIassDConcrcte
$ 104.80
CY
20
$ 2,096.00
626.01 Mobilization- Invoices Under $500 1 $ 283.40 j Lump Sum 1 25 1 $ 7,085.00
630.01
"NO PARKING" Sign With Stand
$ 1.50
Per Day Per Each
375
$ 562.50
630.02
Vertical Panel Without Light
$ 0.87
Per Day Per Each
50
$ 43.50
630.03
Channelizing Barrels
$ 0.77
Per Day Per Each
50
$ 39.50
630.04
Type I Barricade Without Light
$ 0.77
Per Day Per Each
750
$ 577.50
630.05.
Type II Barricade Without Light
$ 0.77
Per Day Per Each
20
$ 15,40
630.06
Type III Barricade Without Light
$ 3.05
Per Day Per Each
20
$ 61.00
630.07
Size A Sign With Stand
$ 1.45
Per Day Per Each
225
$ 326.25
630.08
Size B Sign With Stand
$ 1.60
Per Day Per Each
20
$ 32.00
630.09
Size A Specialty Sign - Cost of Manufacturing
$ 78.00
Each
2
$ 156.00
630.10
Size B Specialty Sign - Cost of Manufacturing
$ 78.00
Each
2
$ 156.00
630.11
Cone With Reflective Strip
$ 0.62
Per Day Per Each
375
$ 232.50
630.12
Safety Fence
$ 5.10
Per Day Per Roll
20
$ 102.00
630.13
Light
$ 0.51
Per Day Per Each
20
$ 10,20
630.14
Advance Warning Flashing - or Sequencing Arrow Panel
$ 71.00
Per Unit Per Day
5
$ 355.00
630.15
Variable Message Board
$ 129.50
Per Unit Per Day
10
$ 1,285.00
630.16
Traffic Control Supervisor
$ 303.65
Per Day
25
$ 7,591.25
630.17
Traffic Control Supervisor
$ 31.37
Per Hour
100
$ 3,137.00
630.18
Flagging
$ 19.23
Per Hour
150
$ 2,884.50
FORCE ACCOUNT LADOR RATES
*Materials will carry a 10*/ markup from the original invoice for casts $500 apil below, and an
*Attach hourly Equipment/Operator rates to be wed for Force Accauarvork
8% markup for involves greater than $500
FAI
Laborer
$ 22.32
Hour
15
$
334.80
FA2
Foremen
$ 37.20
Hour
15
$
558.00
FA3
Finisher
$ 30.82
Hour
is
$
462.30
FA4
Form Setter
$ 29.23
Hour
15
$
438.45
TOTAL COST
Three Hundred SixtyT ousand, Five Hundred Sixty Seven
Signed �� T
Company Express Concrete Inc.
Check One:
Individual Doing Business in Company Name
X Corporation
Partnership
Dollars and Twenty Five Cents.
Address
Phone/Fax
PO Box 273209
Fort Collins, CO 80527-3209
970.225,1287 970.229.0846
Page 3 of 3
REMIT TO: Irw6w Inquties . 303657-4155
kNORTH
CLAFARGE WEST INC. Ship From: NO ROM INDIRECTS
r��� CONSTRUCTIONMATERIALSNORTHERN READYMIXDMSKIN
AMERICA 22252 NErWoRK PLACE
CHICAGO, IL 60673.1222
BILL TO
f i3l��if lli i�flf311�)i l�llii lit�l�7 �iii111�i1�i 111�l�i7 Mil
l.Fi-ilSR-12iS06-fl45? / DOOV1G f :374791174SW
EXPRESS CONCRETE INC 162
PO BOX 273209 21s
FORT COLLINS, CO 80527-3209
INVOICE
SHIP TO:
COLLEGE AND JEFFERSON FTC
EC/LL/GR
ECILLIGR, CO 8000
W MCE DATE
CUSTOMER #
CUSTOMER PO #
PROJECTfIDESCRIPTION
INVOICES
PAGE
2006112I3
6277
METRO
074701174330
111
TICKETDATE
TICKET#
QTY
OOM
ITEM#
REM DESCRIPTION
UNITNET
EXTLVE
TAX
SWFLocu r
PT�CE
PRK
CODE
tawny
Good news for those with Internet access! We now offer online
access to pgoour invoices and statements, go to www.lafarW-na.com
or call 1-866-368-9636 for information.
20LM'i1213 004176069
6.250 CY
DI IU04222 . 48 fiver mix. 86.50o 540.63 36
0751
2ODS1213 D04176069
6.250 CY
D11256 FUEL SURCHARGE 0.500 3.13
0751
20061213 004176069
6.250 EACH
D11257 CHRG:ENVIRONMENTAL FEE 1.500 9.38 36
0751
20061213 004176069
6.250 EACH
D11171 WINTER CHARGE 3.000 18.75 36
07S1
Invoice Totals
SUMMARY
6.250
011UG4222 48 hour mix
540.63
SUMMARY
6.250
D112% FUEL SURCHARGE
3.13
SUMMARY
6.250
D11257 CHRG:ENVIRONMENTAL FEE
9.38
SUMMARY
6250
D11171 WINTER CHARGE
18.75
SUBTOTAL
571.89
STATE 2.900%
16A9
COUNTY 0.800%
4.56
TOTAL IN USO
592.94
TERMS NET 30 DAYS
2o06 lwls MA6316
L 4, kii a
IJan 01- June 01
180.7
3.2 5.4
Jn101- Dec 01
181.8I
0.6 3.8
Ian 02 - June 02
184.6
1.5
2.2
July 02 - Dec. 02
185.1
0.3
1.8
San 03 - June 03
r 187.8
F 1.5 I
1.7
Jul 03 - Dec 03
185.7 1
-1.1�
0.3
Ian 04 - June 04 �,
186.5 IF
0.4
-0.7
Jul 04 - Dec 04
187.4 IF
0.5 �
0.9
San 05 - June OS
189.2 IF
1.0
F 1.4
Jul 05 - Dec 05
192.6
1.8�
2.8
Jan 06 - June 06 �
196.3
1.9
3.8
-
Jul 06 -Dec 05 -_�
199.1
�i.4
IF 3 4<
Last update 2-21-20071
http://NN.�w,w.cow-orkforee.com/Imi/'alilcpidN,r.htm 4i2412007
Energy Information Administration
Home - PVroleufn -- Gasoline and Diesel Fuel Update
Gasoline
Diesel
U.S. Gasoline and Diesel Fuel Prices, 04/23/07
U.S. Pequlm Gasofil a Priioes U.S. On -Highway Diesel Fuel Prices
3*0
250
2U0
fINl
Mag Aug Nov Feb Meg
-a--- 2W5-06 -.e,._ 2009-W
Gasoline scents Per Galion)
04/23/07 Change from
Price Weeeok Year Ago
Ag
U.S. 286.9 -0.7 . -4.5
East Coast 283.5 -0.4 -10.7
New England 282.5 $ 0.7 -9.8
Central 284.9 $ 0.5 -12.2
Atlantic
Lower Atlantic 282.7 .w -1.4 , -9.9
Midwest 277.5 -3.2 - -9.5
Gulf Coast 275.5It-
14-3-2-
-32.6
Rocky Mountain 284.4 13.4West Coast 321.8 t 20.9California 331.6 2- 24.8
Regwnal Regular Gasonne Prices
376 Cents_ Per Glo" _„ _..... F-P!...
325
275 -
225
175 .. _.
125
May.05 Nau-05 Ma9-06 Nav-06 Meg-07
-�---East Coast Midwest
_. QUO Coa.:t ---- Rockg AAoontaGn
-- vest Coast
Retail Gasoline Prices
Can -Highway Diesel Prices
A Primer on Gasoline Prices
350 Ce per Ga , _... ...... EJA ,
300
260too
im1
2W
150
100
May Aug Nov Feb Mas
' 2005-06 -+-_. 2W"7
Diesel Fuel (Cents per Galion)
04/23107 change from
Price Week Year Ago
Ago
4S. 285..1 -2.6 -2.5
ast Coast 283.7 -2.5 $. -5.1
New England 286.4 -0.7 -9.7
Central 287.7 -0.8 -10.1
tlantic
Lower Atlantic 281.7 -3.5 -g� -2.6
lidwest 283.1 -3.3 .&5- -1.6
gUlf Coast 281-5 -3.4 - -0.2
.ocicy Mountain 2:97.8 -0.3 1 , 7.5
lest Coast 295.3 -& -0.3 1 + -7.3
California 300.4 -1.1 � -9.9
Regional Diesel Fuel prices
376 Cetus per r3atbn EIA_
325 -
275 An
- n5!
225
175
t25
May-05 NOW-05 Mag-o6 Nc -06 Meg-07
-+-- East Coast I-- M-rclwest
.....�- -. Suit Coast ---- Rocky Niounta
----- vest C &n
This Week in Petroleum
Snort -`east Energy outlook
Real Petroleum Prices
Does 21A calculate diesel fuel
Glossary
Release schedule
Sign Up for Email UPd
History
Y`&.at We Pay For tr A. GaJcn Of F
(March 2007)
Retae Price. S2.55tg f
Taxes i 1 v
OistnbutnOOrl & Marketing M
Reli mng C2-
Crude
sxplanatic
Gasoline Puff
:."hat L4e Pay For 3n AGallot
(Mare. 2007)
Retail, Price $2.67:9
Taxes a;
Ddsir4bt ilea 8 "Aafketln'g MIS
S
Refining IC2
v Cade .mil S'
Fxplanatic
Diesel Fuel Purr
Ethanol, Gasoline, and Dili
Sulfur Diesel Supply tssu
Eliminating MTBE to Gas
2006
Can U.S. Supply Accomn
http://tonto,eia.doe.,ov;ooglingbl&�du/gasdiesel.asp 4/24/2007
Mag Aug Nov Feb Meg
-a--- 2W5-06 -.e,._ 2009-W
Gasoline scents Per Galion)
04/23/07 Change from
Price Weeeok Year Ago
Ag
U.S. 286.9 -0.7 . -4.5
East Coast 283.5 -0.4 -10.7
New England 282.5 $ 0.7 -9.8
Central 284.9 $ 0.5 -12.2
Atlantic
Lower Atlantic 282.7 .w -1.4 , -9.9
Midwest 277.5 -3.2 - -9.5
Gulf Coast 275.5It-
14-3-2-
-32.6
Rocky Mountain 284.4 13.4West Coast 321.8 t 20.9California 331.6 2- 24.8
Regwnal Regular Gasonne Prices
376 Cents_ Per Glo" _„ _..... F-P!...
325
275 -
225
175 .. _.
125
May.05 Nau-05 Ma9-06 Nav-06 Meg-07
-�---East Coast Midwest
_. QUO Coa.:t ---- Rockg AAoontaGn
-- vest Coast
Retail Gasoline Prices
Can -Highway Diesel Prices
A Primer on Gasoline Prices
350 Ce per Ga , _... ...... EJA ,
300
260too
im1
2W
150
100
May Aug Nov Feb Mas
' 2005-06 -+-_. 2W"7
Diesel Fuel (Cents per Galion)
04/23107 change from
Price Week Year Ago
Ago
4S. 285..1 -2.6 -2.5
ast Coast 283.7 -2.5 $. -5.1
New England 286.4 -0.7 -9.7
Central 287.7 -0.8 -10.1
tlantic
Lower Atlantic 281.7 -3.5 -g� -2.6
lidwest 283.1 -3.3 .&5- -1.6
gUlf Coast 281-5 -3.4 - -0.2
.ocicy Mountain 2:97.8 -0.3 1 , 7.5
lest Coast 295.3 -& -0.3 1 + -7.3
California 300.4 -1.1 � -9.9
Regional Diesel Fuel prices
376 Cetus per r3atbn EIA_
325 -
275 An
- n5!
225
175
t25
May-05 NOW-05 Mag-o6 Nc -06 Meg-07
-+-- East Coast I-- M-rclwest
.....�- -. Suit Coast ---- Rocky Niounta
----- vest C &n
This Week in Petroleum
Snort -`east Energy outlook
Real Petroleum Prices
Does 21A calculate diesel fuel
Glossary
Release schedule
Sign Up for Email UPd
History
Y`&.at We Pay For tr A. GaJcn Of F
(March 2007)
Retae Price. S2.55tg f
Taxes i 1 v
OistnbutnOOrl & Marketing M
Reli mng C2-
Crude
sxplanatic
Gasoline Puff
:."hat L4e Pay For 3n AGallot
(Mare. 2007)
Retail, Price $2.67:9
Taxes a;
Ddsir4bt ilea 8 "Aafketln'g MIS
S
Refining IC2
v Cade .mil S'
Fxplanatic
Diesel Fuel Purr
Ethanol, Gasoline, and Dili
Sulfur Diesel Supply tssu
Eliminating MTBE to Gas
2006
Can U.S. Supply Accomn
http://tonto,eia.doe.,ov;ooglingbl&�du/gasdiesel.asp 4/24/2007
1707 Cole Boulevard, Suite 100
Golden, Colorado 80401
'i'elephon<: (303) 985-1070
Facsimile: (303) 716-6318
To Order: 1 (888) 232-9161
To:
Address:
attention:
Quotation
Express Concrete
Spike Hoffman
Date-, March 15, 2007
Phone -
Facsimile: 970-229-0846
Mobile Phone: 970-227-3940
We arc pleased to quote the following product. required For work on the project hereinafter identified as:
No Addenda Received
&fix
PSI @ 28 Days
w/e
Stamp
Air
Description
Usage
Prim per Cubic Yard
Request
W l 48 hrs.
0.38
4
5-7
straigotCement
Exterior
$1026Ek.
Request
4000
0,45
4
5-7
With FlyaSh
Exterior
$91.50
Request
4000
0.45
4
5-7
Straight Cement
Exterior
$94.30
Request
3500
0,45
4
6-7
With Flyash
C&G Machin
$90.80
Request
3500
0.48
4
6-7
With Ffyash
class 13-strut,
$87.55
Request
1 8426130
0.42
4
5-7
With Ryash
Class P. Paving
$95.30
R UeSt
1 6550800
0.37
4
1 5-7
S . ht Cement
24 hour/ 3000
$108.50
Fiber Reinforcement
Per 1.51bs Per Cubic
Yard
ADDITIONAL CHARGE
$7.00
Non -Chloride Accelerator Per % Per Cubic Yard
ADDITIONAL CHARGE
$7.00
Extra Sack of Cement Per Cubic Yard
ADDITIONAL CHARGE
$8,00
Hydration Stabilizer Per 30 Minute Increment Per Cubic Yard
ADDITIONAL CHARGE
$3,00
L.M. Scofield Liquid Colors Per # Per Sack of Cementitious (Greens, Blues & Exotic Colors:
Cali for Price)
ADDITIONAL CHARGE
$3.50
This
NS = Not Specified
All deliveries are contingent on the availability of raw materials and drivers service hours
[finless otherwise noted- All above mixes bid with ASTM C-150 Type I/lit Cement.
All Color orders will have a minimum 2 cubic yard Mad size
on March 30, 2007 if a valid purchase order
to
has not been received.
i Price increase $5.00t cubic yard effective January i 2008 thru to June 30 2008
Normal Delivery Hours: Monday - Saturday 7:00 a.m - 5:00 p.m.
A Wnter time surcharge of+$3.00 per cubic yard will be charged front November t through March 15 of every year.
It is recommended to use a minimum of 30 minutes of hydration Stabilizer from May 1 - September 1.
Minimum bad charge of $60.00 per load on loads less than 5 cubic yards.
Unloading time of 6 minutestyd.-max. 60 minutes/full load - thereafter additional $2.00 per minute.
• Saturday Delivery Charge - Add $5.00 per cubic yard to the above unit price.
• If Project is Tax Exempt Tax Exempt Certificate must be received prior to commencement of project
• Above unit prices are based on approximate total project yardage of: 4,750 cubic yards..
Above prices do not include sales tax. Payment due on the tenth of the month following purchase, Finance charges of 1.5% will be charged on all
accounts unpaid for more than 30 days. Any Credit Extended for this project is subject to approval by Aggregate Industries WCR Credit Department.
Prices are based on the received speciricagons. Additional testing and/or undisclosed material requirements is the purchasers
responsibility. AtMe time any delivery is received at Me above referenced project customer acknowledges this quotation as binding
All terms and conditions of Kris quotation are a valid contract unless superseded by a Purchase Agreement signed by bogy parties.
Sincerely,
Dennis Mouser
Senior Safes Representative
Office,
(970) 482-9971
-ell Phone:
(970) 214-47W
Fac&mile'
(970) 482-9979
E-Ma6,
dennr&n)ouser@agghegate.con,
3/1812007Express3:08 PM