HomeMy WebLinkAbout150670 STANTEC INC - CONTRACT - CONTRACT - 30019 HARMONY ZIEGLER ROUNDABOUTPROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred
to as the "City" and Stantec Consulting, Inc., hereinafter referred to as "Professional".
W ITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance with
the scope of services attached hereto as Exhibit "A", consisting of seven (7) pages, and
incorporated herein by this reference.
2. Contract Period. This Agreement shall commence upon signing, and shall continue
in full force and effect until June 30, 2007, unless sooner terminated as herein provided
3. Early Termination by City. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the
termination date contained in said notice unless otherwise agreed in writing by the parties.
All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent
to the following addresses:
Professional:
City:
With Copy to:
Stantec Consulting, Inc.
City of Fort Collins
City of Fort Collins, Purchasing
Attn: Jim Allen-Morely
Attn: Matt Baker
PO Box 580
209 S. Meldrum
281 N. College Ave.
Fort Collins, CO 80522
Fort Collins, CO 80521
Fort Collins, CO 80524
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination, subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole right
and remedy for such termination.
Standard Professional Services Agreement- rev 09/01 /06
1
corrections discussed. No full review cycle is anticipated
SURVEYING
Surveying will include the preparation of easement documents necessary for the
acquisition of Right of Way and Construction Easements. Field survey is
anticipated for utility locations and 500 feet to the east of the present Harmony
design.
Topographic Survey
Complete additional survey to confirm cross slopes east of Ziegler on Harmony
Road.
Complete a topographic survey for 500 feet east of the end of the current design
on Harmony Road.
Utility locations and pot hole surveying are anticipated. Stantec has budgeted
hrs for both Ziegler and Harmony Road
Easements
Prepare legal descriptions and easements. 12 easement descriptions anticipated for
Both Ziegler and Harmony Road.
Final Drawing Production
This accounts for the final collation and review of the plans.
Project Management and QA and QC.
Jeff Temple of our Transportation Group has been brought in to QA our plans. And we
have accounted for 3 days of Project Management
Landscape Design
BHA will be hired as a subconsultant and complete the landscape design for the
medians of Harmony and Ziegler. It is assumed that this will be only minor changes to
what is submitted now.
Irrigation Design
Hines irrigation will complete the irrigation design for the medians as currently
configured. This will complete 3 submittals for approval.
Standard Professional Services Agreement- rev 09101106
11
ADDITIONAL SERVICES
All services not listed under "Basic Services" are considered Additional Services. The
compensation for these services will be in addition to that for "Basic Services" and will be
negotiated when requested.
1. Negotiating for or obtaining off -site easements.
2. Construction Staking.
3. Engineering services incident to project scope changes beyond Stantec's control.
4. Services in connection with submitting for, or obtaining, any building permits or satisfying
other governmental regulations: work due to change in governmental regulations instituted
after the date of this contract.
5. Investigating existing conditions or facilities, or making measured drawings thereof, or
verifying the accuracy of information furnished by others, or providing field surveys, except
as identified under "Basic Services".
6. Preparing documents for alternate bids or out of sequence services except as noted under
basic services.
7. Making revisions to drawings or the documents when such revisions are inconsistent with
prior approvals or instructions.
8. Providing consultation and professional services in connection with evaluation or
replacement of any work damaged during construction.
9. Services made necessary by contractor's default or by defects in the work of the contractor.
10. Services modifying work performed by Stantec Inc. to bring the construction cost within any
limitation imposed by the Client except as noted in "Basic Services.
11. Providing services for any off site improvements not listed under "Scope".
12. Providing services in connection with future facilities, systems or equipment, which are not
intended to be constructed as part of this project.
13. City of Fort Collins Standards variance requests if necessary.
14. Construction Cost Estimates or Quantities
15. Pot Holing Information.
COMPENSATION
The fees below are based are based on a time and materials basis with estimates
shown below. Expenses will be charged in addition to the amounts shown below at cost
plus 10%.
Final Design For Harmony Road And Ziegler Road Excluding The Horsetooth And
Ziegler Roundabout
Meetings
Meetings........................................................................................... $2,160
Subtotal $2,160
Standard Professional Services Agreement- rev 09/01/06
12
Revised Drafting for City of Fort Collins
Revised Drafting............................................................................... $7,926
Subtotal $7,926
Final Design
HarmonyRoad...............................................................................
$28,544
Ziegler Road...................................................:...............................
$13,176
Subtotal $41,720
Survey
Topographic Survey.........................................................................
$2,438
Utility location survey......................................................................
$3,118
Easements (12 descriptions)............................................................
$6,000
Subtotal $11,556
Project Management
QA/QC.............................................................................................
$3,312
Project Management........................................................................
$3,312
Subtotal $6,624
Engineering and Survey Total .....................................................
$69,986
Landscape Design.........................................................................
$5,000
Irrigation System Design...............................................................
$9,750
Total...............................................................................................
$84,736
Note: Invoicing and the tracking of labor time against budgets will be at the major task level
only (i.e. Preliminary Engineering, Final Engineering and Surveying). The sub -budgets listed
above are for fee estimation purposes only.
RESPONSIBILITIES OF THE CLIENT
• Provide Title Policy for proposed easements.
• Provide all criteria and full information as to the requirements for the Project.
• Furnish all soil, subsurface, environmental tests, traffic reports, planning services and
reports required by Stantec Inc. (except where such are included in "Basic Services".)
• Furnish all field surveys of boundaries, topography, and locations (except where such
are included in "Basic Services).
• Designate a person to act as representative with respect to professional and contractual
services of Stantec.
• Give prompt notice to Stantec of any development that affects the scope and/or timing of
Stantec's services.
• Pay all submittal and filing fees as required for the project.
Standard Professional Services Agreement- rev 09/01/06
13
SUMMARY
Stantec is pleased to present this proposal to the City of Fort Collins. This project has
been done by Stantec up to this point and would be able to use its knowledge of the
project and its resources to the City of Fort Collins advantage.
Execution of Stantec's standard contract or other acceptable form of contract is required
prior to commencing work on the project.
Sincerely,
Jim Allen -Morley, P.E.
Stantec Consulting, Inc.
Associate
Standard Professional Services Agreement- rev 09/01/06
14
EXHIBIT B
STANTEC RATE TABLE
_.._ .....__.__...._.._ ._...._. ENGINEERING GROUP
Stantec
2007 SCHEDULE OF HOURLY RATES AND DISBURSEMENTS
Staff Member Title
Administrative
Senior Administrative
Staff Designer / CAD Technician
Designer / CAD Technician
Senior Designer / CAD Technician
Design Engineer
Project Engineer
Senior Engineer
Project Manager
Billing Level Descriptions
Rate Table
Administrative Support
Levels 14
$43-$61
Levels 5-6
$67-$74
Technical Services
Levels 4-5
$61-$67
Levels 6-7
$74-$80
Levels 8-10
$87-$104
Professional Services
Levels 6-7
$74-$80
Levels 8-9
$87-$95
Levels 10-11
$104-$114
Levels 11-13
$114-$138
Sr. Project Manager / Principal Levels 12-16 $126-$171
Proiect Expenses
This charge will be 8% of fees invoiced, unless otherwise indicated in Contract, and will include:
Internal incidental printing -related expenses including all output from printers, prints, photocopies, plots, film, vellum,
plastic covers, spines, dividers, and map pockets.
Communications expenses including faxes, office and mobile phones, calling card expenses, pagers, and other
wireless communications.
Office related expenses including postage, courier, supplies and equipment expenses.
Computer maintenance expenses and supplies, and use of common software such as AutoCad, Word, Excel and
PowerPoint.
Local mileage charges incurred by staff in carrying out projects.
Maintenance of archives, both electronic and hardcopy, including space and handling.
Required submittal prints plus one copy for client.
Sub Consultants and Disbursements
At cost + 15%
Sub Consultants' invoices for supplies and services.
Printing, plotting and production of final reports, drawings, specifications, tender documents and other like items for
delivery or use by others external to Stantec and client, supported by separate invoices from externalloutsourced
printing services.
Out-of-town charges incurred by staff for meals, travel and/or accommodation in connection with a project.
Page 1 of 1 Initials
Project: Final Design of Harmony and
Ziegler Road for City of Fort Collins
3/1412007
Final Desgn(PDP/FCP)
#
Shts
Pry.
M r
Prof
Proj
E
Des
Tech
Tech
Survey
Tech
Survey
Man
Survey
Sub
Consult.
Total
Labor Flrs
/ Task
Total
Computer
Hmrrask
Total
Labor Cost
/ Task
Total
Computer
Cestrrask
Total
Cost
/ Task
Subtotals
Current RatesMour
$ 138
5108
$ 85
$ 75
85
$ 65
$ 75
$ 100
$ 140
$50
$ 10
Meetings
0
0
$9
$0
0
0
$0
$0
$0
Coordination
20
20
0
$2,160
$0
$2,160
0
0
so
$0
$0
Revised Drafting for City of Fort Collins
0
0
$0
$0
0
0
$0
$0
$0
Demolition Plam
8
1 16
24
0
$2.224
S0
$2224
Plan and Profile Drawing Adjustments
50
50
0
$4.250
$0
$4.250
Paving Plan
4
12
16
0
$1,452
$0
$1,452
0
0
$0
$0
$0
Ziegler
0
0
s0
$0
$0
0
0
$0
$0
$0
0
0
$0
$0
$0
redo vertical design
8
40
48
0
$4264
so
$4,264
redo drafting
8
24
32
0
$2,904
$0
$2,904
Design private drives
4
8
12
0
$i 112
$0
$t 112
Drainage
81
1 18
1
241
0
$2224
$O
$
New Storm Sewer Profile
8
12
20
0
$1.884
$0
Dietz sewer service
1
8
9
0
$788
$0
0
0
$0
$0
Harmon Road
0
0
$0
$0
0
0
$0
$0
VE engineer
0
$0
$0
redo vertical design
8
40
48
0
$4264
S0
Drafting.
8
40
48
0
$4264
SO
0
0
$0
$0
so
Drainage
18
32
48
0
$4,448
$0
$4.448
0
0
0
$0
$0
Miso. Design
0
0
$0
$0
$0
0
0
$0
$0
$0
Under Drains
4
12
16
0
$1,452
$0
$1,452
Sleeves
12
12
0
$1,020
$0
$1.020
Horizontal Control Plans
4
4
0
$340
$0
$340
Jointing Plan revisions
8
4
12
0
$1 4
SO
$1,204
Additional Iniersec8on Design Derail
16
16
0
$1,728
$0
31,728
Phasing Plan
4
16
20
0
$1,792
$0
$1,792
Extend Design to East
18
40
56
0
$5 128
$0
$6,128
Final Production
8
24
32
0
$2,904
$0
S2.904
aa"o Ks unawaar e w cry 4 ronc .m 1 Stantec
Project: Final Design of Harmony and
Ziegler Road for City of Fort Collins
3/1412007
Final Desgn (PDP/FCPI
#
Shts
Proj.
Mgr
Proj
Eng
Pmj
En
Des
Tech
Tech
Survey
Tech
Survey
Survey
Sub,
Consult.
Total
Labor Hrs.
i Task
Total
Computer
Hrslrask
Total
Labor Cost
i Task
Total
Computer
Cosl/rask
Total
Cost
/ Task
Subtotals
Cunent Ratesll-lw
E 138
$108
$ 85
S 75
$ 85
$ 65
$ 75
$ 100
S 140
$50
$ 10
0
0
$0
$0
$0
Surrey
0
0
$0
0
$0
Addibonal Topo
16
4
20
0
$2.438
0
$2,438
Hannony LM14 Locates
8
2
10
0
$1,219
$1,21
Ziegler Utility Design
6
2
10
0
$1219
$1,219
Pot Holing krtonnation
8
8
0
$M
$0.
$fi80
Easements
64
12
761
64
$6,000
$6,0
0
0
$0
$0
0
0
$0
$0
$0
0
0
$0
$0
$0
0
0
$o
$
i
OA / OC Jeff Temple
24
24
0
$3,312
$3,312
Project Management Jim Allen -Morley
24
24
0
$3,312
$3,312
0
0
$0
0
$0
0
0
$0
$0
$0
0
0
$0
$0
$0
0
0
$0
$0
$0
0
0
SO
$0
$0
0
0
$0
$0
$0
Total Hours
48
157
0
0
418
0
64
12
32
8
739
$0
Total Labor Cost
$6.624
576,956
$0
SD
$35,530
$0
$4,800
$1200
$4,480
$396
$69,986
$0
$69,986
Bayer^Me ammaee lar anal a Can M FMC .sa 2 Slant"
Hourly Rates
BHA Design Incorporated
Labor fees for BHA Design are based on the following hourly rates:
PROFESSIONAL
HOURLY RATE
Principal
$ 102 — 150
M
Associate
$ 87 — 105
Landscape Architect
$ 67 — 98
Administrative
$ 55 — 75
Hourly Rates Page 15
NINES
irrigation
Consultants
Staff Position Hourly Rate
Principal $ 110
Civil Engineer P.E. $ 1 10
Senior Designer/Engineer $ 85
Irrigation Designer/Engineer $ 75
Administrative Management $ 55
Computer Drafting $ 55
Engineering & Design Support $ 45
Reimbursable Expenses:
2007 Fee Schedule
• Mileage cost is $0.50 per mile
• Drawing plots $3.00 - $12.00 per 24" x 36" drawing depending on quantity
needed
• Overnight and express mail at a rate of 1.4 of cost
• Sub -consultants if needed at a rate of 1.4 of cost
• No charge for telephone, faxes, or copies of paper documents.
Fee adjustments:
• Fee adjustments for changes in scope or other additional services requested
are proposed in writing and must be approved prior to commencement of
work.
w ,Hineslmgotion.com Colorado Office 970-282-1800 Arizona Office 602-240-9800
ACORD. CERTIFICATE OF LIABILITY INSURANCE 1 °05/0212o 1
PRODUCER Serial # 21 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
AON REED STENHOUSE INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
AON RISK SERVICES, INC. OF MINNESOTA ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
900 - 10025 - 102A AVENUE, EDMONTON, AB T5J OY2
TEL: (780) 423-9801 FAX: (780) 423-9876 INSURERS AFFORDING COVERAGE
INSURED STANTEC CONSULTING INC. INSURERA: ZURICH AMERICAN INSURANCE COMPANY
209 SOUTH MELDRUM STREET INSURERS: HARTFORD CASUALTY INSURANCE COMPANY
FORT COLLINS, CO 80521-2603 INSURERc ZURICH AMERICAN INSURANCE COMPANY
INSURERD: TWIN CITY FIRE INSURANCE COMPANY
LLOYD'S OF LONDON
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
IN
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
POLICY EXPIRATION
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE
$ 1,000,000
FIRE DAMAGE (Any me fire)
$ 1,000,000
A
X COMMERCIAL GENERAL LIABILITY
GLO 3373919-04
05/01/07
05101 /08
CLAIMS MADE FRJ OCCUR
MED EXP (Any one person)
$ 10,000
X CONTRACTUAVCROSSLIABILITY
PERSONAL $ADVINJURY
$ 1,000,000
X
PROTCCi& CONTRACTORS
XCU COVER INCLUDED
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
$ 1,000,000
POLICY X PRO- LOC
B
AUTOMOBILE
X
LIABILITY
ANYAUTO
41 UEN TZ 9623
11/01/06
11/01/07
COMBINED SINGLE LIMIT
(Ea accident)
$ 1,000,000
BODILY INJURY
(Per person)
$
ALL OWNED AUTOS
SCHEDULED AUTOS
BODILY INJURY
(Per accident)
$
HIRED AUTOS
NON -OWNED AUTOS
PROPERTYDAMAGE
(Par accident)
$
GARAGE LIABILITY
AUTO ONLY - EA ACCIDENT
$ NOT
OTHERTHAN EAACC
$ APPLICABLE
ANY AUTO
$
AUTO ONLY: AGG
EXCESS LIABILITY
EACH OCCURRENCE
$ 5,000,000
C
X OCCUR EJ CLAIMS MADE
8831307
05/01/07
05/01/08
AGGREGATE
$ 6,000,000
EXCESS GENERAL, AUTO AND
$
DEDUCTIBLE
X RETENTION $ 10,000
EMPLOYERS LIABILITY
(FOLLOW FORM)
$
a
D
WORKERS COMPENSATION AND
EMPLOYERS'LIABILITY
41 WB PL7271
11/01/06
11/01/07
X TWORYLIMRS TRH
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
S 1,000,000
E.L. DISEASE -POLICY LIMB
I $ 1,000,000
E
OTHER
QK0602009
08/01/06
08/01/07
CLAIM AND AGGREGATE LIMIT $2,000,000
PROFESSIONAL LIABILITY
INCLUSIVE OF COSTS
INCLUDING ENVIRONMENTAL
NO RETROACTIVE DATE
CLAIMS MADE BASIS
DESCRIPTION OF OPERATONSILOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS
STANTEC PROJECT # 1870. RE: FRONT RANGE VILLAGE - OFF SITE ROAD IMPR HARMONY RD & ZIEGLER RD. CERTIFICATE
HOLDER IS INCLUDED AS AN ADDITIONAL INSURED BUT ONLY ARISING OUT OF THE OPERATIONS OF THE NAMED INSURED.
CITY OF FORT COLLINS
ATTN: JAMES B. O'NEILL II
P.O. BOX 580
FORT COLLINS CO 80522
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER ITS AGENTS OR
/iGVKN LDV 1//B!/ 0
STANTEC #2007-05-FORT COLLINS.FP5
4. Design, Project Indemnity and Insurance Responsibility. The Professional shall be
responsible for the professional quality, technical accuracy, timely completion and the coordination
of all services rendered by the Professional, including but not limited to designs, plans, reports,
specifications, and drawings and shall, without additional compensation, promptly remedy and
correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold
harmless the City, its officers and employees in accordance with Colorado law, from all damages
whatsoever claimed by third parties against the City; and for the City's costs and reasonable
attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of
the services furnished under this Agreement. The Professional shall maintain commercial general
liability insurance in the amount of $500,000 combined single limits and errors and omissions
insurance in the amount of $1,000,000.
5. Compensation. In consideration of the services to be performed pursuant to this
Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis
according to Exhibit "B" Hourly Rates consisting of five (5) pages and incorporated herein by this
reference, Sixty Nine Thousand Nine Hundred Eighty Six Dollars ($69,986) with maximum
compensation for both Professional's time and reimbursable direct costs not to exceed Eighty Four
Thousand Seven Hundred Thirty Six Dollars ($84,736). The parties acknowledge that sub-
contractors are not parties to this agreement. However, the rates listed for services to be provided
by these subcontractors shall be the rate paid by the City to the Professional for these services. If
the amount charged by these subcontractors exceed the rates listed in Exhibit "B" the excess
amount shall not be paid or owed by the City. The limitation on increases in prices set forth in
section 2 herein shall apply to all rates listed in Exhibit "B" including subcontractor rates. Monthly
partial payments based upon the Professional's billings and itemized statements of reimbursable
direct costs are permissible. The amounts of all such partial payments shall be based upon the
Professional's City -verified progress in completing the services to be performed pursuant hereto and
upon the City's approval of the Professional's reimbursable direct costs. Final payment shall be
Standard Professional Services Agreement- rev 09/01 /06
2
made following acceptance of the work by the City. Upon final payment, all designs, plans, reports,
specifications, drawings and other services rendered by the Professional shall become the sole
property of the City.
6. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
7. Project Drawings. Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing accurate
information on the project as constructed. Drawings shall be of archival, prepared on stable mylar
base material using a non -fading process to provide for long storage and high quality reproduction.
"CD" disc of the as -built drawings shall also be submitted to the owner in and AutoCAD version no
older then the established city standard.
8. Monthly Report. Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Scope of Services,
Work Schedule, and other material information. Failure to provide any required monthly report may,
at the option of the City, suspend the processing of any partial payment request.
9. Independent Contractor. The services to be performed by Professional are those of
an independent contractor and not of an employee of the City of Fort Collins. The City shall not be
responsible for withholding any portion of Professional's compensation hereunder for the payment of
FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
10. Personal Services. It is understood that the City enters into this Agreement based on
the special abilities of the Professional and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
Standard Professional Services Agreement- rev 09/01l06
3
consent of the City.
11. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's
approval or acceptance of, or payment for, any of the services shall not be construed to operate as a
waiver of any rights or benefits provided to the City under this Agreement.
12. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform according to the
terms of this agreement, such party may be declared in default.
13. Remedies. In the event a party has been declared in default, such defaulting party
shall be allowed a period often (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek
damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail
himself of any other remedy at law or equity. If the non -defaulting party commences legal or
equitable actions against the defaulting party, the defaulting party shall be liable to the
non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred
because of the default.
14. Bindinq Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers, employees,
agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal
representatives, successors and assigns of said parties.
15. Law/Severability. The laws of the State of Colorado shall govern the construction,
interpretation, execution and enforcement of this Agreement. In the event any provision of this
Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such
holding shall not invalidate or render unenforceable any other provision of this Agreement.
17. Prohibition Against Employing Illegal Aliens. This paragraph shall apply to all
Standard Professional Services Agreement- rev 09/01/06
4
Contractors whose performance of work under this Agreement does not involve the delivery of a
specific end product other than reports that are merely incidental to the performance of said work.
Pursuant to Section 8-17.5-101, C.R.S., et. seq., Contractor represents and agrees that:
A. As of the date of this Agreement:
1. Contractor does not knowingly employ or contract with an illegal alien; and
2. Contractor has participated or attempted to participate in the basic pilot
employment verification program created in Public Law 208, 104th
Congress, as amended, and expanded in Public Law 156, 108th
Congress, as amended, administered by the United States Department of
Homeland Security (the "Basic Pilot Program") in order to verify that
Contractor does not employ any illegal aliens.
B. Contractor shall not knowingly employ or contract with an illegal alien to
perform works under this Agreement or enter into a contract with a
subcontractor that fails to certify to Contractor that the subcontractor shall not
knowingly employ or contract with an illegal alien to perform work under this
Agreement.
C. Contractor shall continue to apply to participate in the Basic Pilot Program and
shall in writing verify same every three (3) calendar months thereafter, until
Contractor is accepted or the public contract for services has been completed,
whichever is earlier. The requirements of this section shall not be required or
effective if the Basic Pilot Program is discontinued.
D. Contractor is prohibited from using Basic Pilot Program procedures to
undertake pre -employment screening of job applicants while this Agreement is
being performed.
E. If Contractor obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien,
Contractor shall:
Notify such subcontractor and the City within three days that Contractor
has actual knowledge that the subcontractor is employing or contracting
with an illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor
does not cease employing or contracting with the illegal alien; except that
Contractor shall not terminate the contract with the subcontractor if during
such three days the subcontractor provides information to establish that
the subcontractor has not knowingly employed or contracted with an illegal
alien.
Contractor shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the "Department") made in the course
Standard Professional Services Agreement- rev 09/01 /06
of an investigation that the Department undertakes or is undertaking pursuant
to the authority established in Subsection 8-17.5-102 (5), C.R.S.
G. If Contractor violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this
Agreement. If this Agreement is so terminated, Contractor shall be liable for
actual and consequential damages to the City arising out of Contractor's
violation of Subsection 8-17.5-102, C.R.S.
H. The City will notify. the Office of the Secretary of State if Contractor violates this
provision of this Agreement and the City terminates the Agreement for such
breach.
Of St z
THE CITY OF FORT COLLINS, COLORADO
By: - 0 k4z..C�
T-Jarnes B. O'Neill II, CPPO, FNIGP
Direct o Purchasing & Risk Management
DATE: _S I `7 1 O 2
Stantec Consulting, Inc.
By. 12 . 4
Title: IV `QKao-�, .kcc �I cx- Ptes
CORPORATE PRESIDENT OR VICE PRESIDENT
Date: Zero
e � �
V
µ.
BQJdbba�*59IISN���"
Standard Professional Services Agreement- rev 09/01 /06
6
EXHIBIT "A"
SCOPE OF PROFESSIONAL SERVICES FOR
COMPLETION OF FRONT RANGE VILLAGE OFF -SITE ROAD IMPROVEMENTS
HARMONY ROAD AND ZIEGLER ROAD FOR THE CITY OF FORT COLLINS
MARCH 14, 2007
INTRODUCTION
Stantec Consulting Inc. is pleased to be asked to finalize the design of Harmony and Ziegler
Roads. Stantec while under a contract with Bayer Properties has nearly completed the final
design of the off -site roads excluding the roundabout at Ziegler Road and Horsetooth Road. At
this time it is our understanding that the City of Fort Collins has now agreed to take over the
finalizing of these documents and the construction of this project, and that value engineering is
now part of this project. Stantec currently has the resources and capability to expedite this
process.
The remainder of this proposal describes our understanding of the scope of work required for
the final engineering design.
DESIGN APPROACH
The design documents for this project are completed to a 95% level except for the roundabout
at Zeigler and Horsetooth Road, which is now at a preliminary level. It is our understanding that
the Harmony Road and Zeigler Road Off -site Road plans will be completed first and that the
roundabout design and construction plans will follow directly afterwards by a separate
document.
Standard Professional Services Agreement- rev 09/01/06
The design approach will be to complete value engineering coordinated in meetings with the
City of Fort Collins, their contractor of choice and Stantec. Review construction methodology
and determine where changes to the design will be cost effective. A preliminary design will be
done to check the feasibility of the design changes prior to final construction plans. The
preliminary time frame for completion of work is 4 to 6 weeks from contract signing.
GENERAL ASSUMPTIONS
As a matter of clarification, several assumptions were made in developing this proposal:
✓ The majority of the final design will stay in tact with no major changes to the presentation
of the drawings.
✓ The City of Fort Collins will do the majority of the meetings with Property owners for
easement negotiations
✓ The City of Fort Collins complete the majority of the utility conflict resolution with Stantec
providing the construction drawings
✓ The City of Fort Collins will review the demolition plans and mark them up to their
satisfaction and Stantec will review and put in the construction drawings.
✓ Drainage design will conform to the current Master Drainage Plan for the area. It is
anticipated that the majority of the storm drainage system will discharge through a new
water quality detention pond that will be constructed with Front Range Village.
✓ Any necessary geotechnical or environmental investigations or studies will be provided
by other consultants at the Client's expense and direction.
✓ Client will provide for the pot holing of utilities. Stantec will survey utiltity locates and
include this information in the drawings.
SCOPE:
VALUE ENGINEERING
Stantec will meet with the City of Fort Collins representative to review construction methodology
and review the current plans to see where costs can be saved.
PRELIMINARY VALUE ENGINEERING DESIGN
Once the design changes for value engineering are agreed, Stantec will modify the plans to a
preliminary level to see if they are feasible. It is anticipated that this could take between 1 and 2
weeks. During this time we will stay in contact with the City of Fort Collins developing the ideas
to a higher level.
FINAL DESIGN FOR HARMONY ROAD AND ZIEGLER ROAD EXCLUDING THE
HORSETOOTH AND ZIEGLER ROUNDABOUT
Once the value engineering items are approved to go to final design, Stantec will complete the
final design and drafting for these items as well as all other items including drainage.
Standard Professional Services Agreement- rev 09/01/06
Final Street Design
Complete the final design of the Harmony and Ziegler Roads including the value engineering
changes. This includes the following:
Revised Drafting requested by City of Fort Collins
Revising Stationing on Harmony and Ziegler roads
Revising Viewport Order so median profiles are on the same sheets and the lane
line profiles are on the same sheet.
Revise Jointing Plan to reflect cross walks
Revise Paving Plan Scale.
Ziegler Road Design
Value engineer vertical road design.
Redo drafting for value engineering
Finish design of private drives.
Final Drainage design
New Storm Sewer from Value Engineering
Dietz and Young Sewer Service.
Add Underdrains
Harmony Road Design
Value engineer vertical road design.
Redo drafting for value engineering
Add Under Drains
Add Sleeving
Update Horizontal Control Plan
Jointing Plan Revisions
Additional Intersection Detail
Phasing Plan
Extend Design to east
Final Storm Drainage Design
Complete the drainage design for the necessary storm sewers. See above for
listing.
Final Utility Design
Complete the demolition and utility relocation plans. See above for listing.
City Of Fort Collins Comments
Meet with appropriate individuals to discuss the above reports and drawings and
make reasonable modifications. It is anticipated that this will be done by meeting
with the City of Fort Collins reviewers on an individual basis and making the
Standard Professional Services Agreement- rev 09/01/06
10