Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 29898Change Order Form CiOartCoUfm &alillneering Departmaot PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure PROJECT NUMBER: 30521700.6 (Bid No. 5998) 'CONTRACTOR: J2 Contractors (P.O No. 6607396) CHANGE ORDER NUMBER: 9 n prepanng c ange orders Show In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4, Change In contract time. 1 &2. See attached sheet for detail. 3. The contract cost will Increase by $ 4,920.00 4. The contract Ume will Increase by 2 working days. ORIGINAL CONTRACT COST $899,998.50 TOTAL APPROVED CHANGE ORDERS ($10,153.03) TOTAL PENDING CHANGE ORDERS $0.00. TOTAL THIS CHANGE ORDER $4,920.00 TOTAL % OF THIS CHANGE ORDER 0.49% TOTAL C.O. % OF ORIGINAL CONTRACT -0.52% ADJUSTED CONTRACT COST $994,763:47 (Assuming all change orders approved) ACCEPTED BY: 171 DATE: 0 • REVIEWED BY: clots Represen DATE: T 16 6 i (Engineer) ACCEPTED BY: DATE: (Project Manager-- E ering) ACCEPTED BY: ,KenO4 ktl 0,� Vi t�A Q DATE: V 0 (Project Manager - Natural Res urces) ACCEPTED BY: �r DATE: (Project Manager - Stormwater) ACCEPTED BY: Chi1atLL DATE: 4 -11-0 7 (Depar(ment Head) APPROVED BY: cc Coneador PurdWep Pmje d Fie (Purchasing Agent over MAW) $0.00 EnvkmwN i4,9=00 Newel Reeoi = $0.00 stormwaW DATE: Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0680 • (970) 221-6605 Engineering Department 281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 act o Tel: (970) 221-6605 - Fax: (970) 221-6378 Change Order Project LPATH Berm Erosion Protection Measure Contract! Bid No.: 5998 Contractor. J-2 Contracting Company CHANGE ORDER NO.: 9 (Natural Resources Only) DESCRIPTION: 1. Reason for Change: Additional work requested by Natural Resources 2. Description of Change: Item Item Description Unit Unit PrIcel Adjust Adjust Current New 3 Quantity Amount $ Quanti Qt 27 Resurface North Parkin Lot LS 4,920.00 1 4,920.00 0 1 Total Adjustment 4,920.00 3. Change in Contract Cost $4,920.00 4. Change in Contract Time: 2 working days CHANGE IN WORK REQUEST (CWR) "7' -RECYCLED ASPHALT PARKING LOT AND TOPSOIL SPREADING Initiation Date: 3/4/2007 Project: LPATH Berm Erosion Protection Measures Owner: City of Fort Collins - Engineering To: J-2 Contracting Co. Requested by: Jin Wang Authorized by: An Wang Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date. Descriptlon of Proposed Changes Amount 1) Furnish all material, equipment, and labor to install 3" depth of Recycled Asphalt in the North Riverbend Ponds Parking Lot (Approximately 8200 Sq. Ft.). Parking lot to be wheel -rolled with Cat 430 TLB after 3" lift is placed. $ 4,920.00 2) Furnish all material, equipment, and labor to spread and amend high-grade compost into disturbed areas at a rate of 2 Cubic Yards/1000 Square Feet (approx. 350 CY total). Areas for soil amendment to be identified by City of Fort Collins Representative. Price per acre = $1950 . Estimated number of acres = 4. Total number of amended acres to be calculated for payment using City of Fort Collins Survey Crew. $ 7 800.00 CWR TOTAL ($) $12,720.00 J-2 Contracting Co. , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be by 5 Days. No change in Contract Sum (Initial if no change) ADD to the Contract Sum $ 12,720.00 DEDUCT from the Contract Sum $ 0.00 This information shall be valid for thirty (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATURE DATE: CO"IM"Or shall Main one (1) ropy and renvn ORIGINAL ro Owner APPROVED BY OWNER: DATE: Accepted change in work request will be included in a future formal change order. DO NOT billfor this change until a formal change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor.