HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 29952Change Order Form City of Fork Collins Engineering Department PROJECT TITLE: Drake/Ziegler Improvements Project - Phase 11 PROJECT NUMBER: 30523280.6 (Bid #6029) CONTRACTOR: Gerrard Excavation (PO #7701943) CHANGE ORDER NUMBER: 1 n nrwnwrmn r wnnw Arriam n nw in eiwr ww swnwrw w nijrnhprpcf nwrwnrwn a thA o nw nw 1. Reason for change. ' 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 28,267.86 4. There will be no change in contract time. ORIGINAL CONTRACT COST $1,447,739.65 TOTAL -APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $28,267.86 TOTAL % OF THIS CHANGE ORDER 1.95% TOTAL C.O. % OF ORIGINAL CONTRACT 1.95% ADJUSTED CONTRACT COST $1,476,007.01 (Assuming all change orders approved) ACCEPTED BY:1,, DATE: CC6nnttractor's Re rrsentative) , REVIEWED BY: ! t"11— � '� LJ DATE: ` Z e,;i _ (Project Engineer) ACCEPTED BY:, ACCEPTED BY: APPROVED BY: cc: Contractor Purchasing Project File Engineering) Head - Engineering) (Purchasing f gent over $30,000) DATE:' DATE: 1-1 - a L C1 DATE: Engineering Department • 281 North College Avenue • P.O. Rox 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Gerrard Excavating CHANGE ORDER NO.1 DrakeWagler Improvement Project - Phase 2 -SUMMARY OF WORK See attached submittal Item Quantity Unit E r Unit Total 1 Rubbelized Concrete for Sub -Grade Stablizatlon 1523.89 TON $ 13.35 $ 20,341.28 2 FlowtUf at Siphon Structure 84 CY $ 58,90 $ 3,759.60 3 8" ADS N-12 Subdrein Extension 30 LF $ 18.95 $ 588.60 4 Recycled Asphalt Base 312.98 TON $ 9.90 $ 3,098.50 5 Jersey Barriers 14 EA S 35.00 $ 490.00 TOTAL $ 28 287.86 REASON FOR CHANGE 1 Placed Rubbel-fzed concrete to Improve poor subgrade at various locations. 2 Placed FWU at Siphon structure for concrete cut-off walls. - used same price as Bid for "Structure Backfill Flowllll QBox Culvert' 3 Extended 8" Clay The pipe with Plastic ADS pipe to get the pipe and out of subgrade 4 Recycled Asphalt for Temp. Road and Tum-a-round at Perecheron 5 Jersey Barrier for Box Culvert Excavation WHEN POSTED Posted to Pay Estimate NoA