Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 29804Change Order Form Engineering Department PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure PROJECT NUMBER: 30521700.6 (Bid No. 5998) CONTRACTOR: J2 Contractors (PO No. 6607396) CHANGE ORDER NUMBER: 6 n preparing change or ers s ow 1 o eras separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 182. See attached sheet for detail 3. The contract cost will Increase by $ 4,912.91 4. There will be no change in contract time. ORIGINAL CONTRACT COST $999,996.50 TOTAL APPROVED CHANGE ORDERS ($5,811.80) TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $4.912,91 TOTAL % OF THIS CHANGE ORDER 0.49•!0 TOTAL C.O. % OF ORIGINAL CONTRACT -0.09% ADJUSTED CONTRACT COST $999,097.61 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Represe ativ 8 REVIEWED BY: DATE: (Engineer) ACCEPTED BY: PATE: O (Project Manager - Engineering) ACCEPTED BY: DATE: D (Prof Hager- atural Resources) ACCEPTED BY: ,/ p DATE: ( ager- tormwater) ACCEPTED BY: _ Ct'Q) U )AI,J 6 DATE: 4-1 U ' O 7 ' 1f'(epartment Head) APPROVED BY: DATE: (Purchasing Agent over $30,000) cc: conlMd" $1,637.64 Engineering Purchasing $1,637.64 Nalumi Resources Projecl File $1,637.63 Stwmwaler Engineering Department • 281 North College Avenue - P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Engineering Department 281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 City of of Fort Tel: (970) 221-6605 • Fax: (970) 221-6378 Change Order Project: LPATH Berm Erosion Protection Measure Contract / Bid No.: 5998 Contractor: J-2 Contracting Company CHANGE ORDER NO.: 6 DESCRIPTION: 1. Reason for Change: Disposal of trash uncovered during construction 2. Description of Change: Item Item Description Unit Unit Price $ Adjust Quanti Adjust Amount $ Current Quantity New Quantity 26 iRemovalofTrash I LS 4,912.91 1 4,912.91 0 1 Total Adjustment 4,912.91 3. Change in Contract Cost: $4,912.91 4. Change in Contract Time: No Change Order Form City of Fort Collins Engineering Department PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure, PROJECT NUMBER: 30521700.6 (Bid No. 5998) CONTRACTOR: J2 Contractors (PO No. 6607396) CHANGE ORDER NUMBER: 7 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time, 1 Q. See attached sheet for detail 3. The contract cost will increase by $ 1.074.77 4. There will be no change in contract time. ORIGINAL CONTRACT COST $999,996.50 TOTAL APPROVED CHANGE ORDERS ($5,811.80) TOTAL PENDING CHANGE ORDERS $4,912.91 TOTAL THIS CHANGE ORDER $1,074.77 TOTAL % OF THIS CHANGE ORDER 0.11% TOTAL C.O. °k OF ORIGINAL CONTRACT 0.02% ADJUSTED CONTRACT COST $1,000,172.38 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ACCEPTED BY: DATE: 7/6 / -0 )ATE: DATE: d ACCEPTED BY: DATE:i/ (Project anager Natur F sources) ACCEPTED BY: DATE: (Prof alter Stormwater) ACCEPTED BY: DATE: 11-1 o 'U Department Head) APPROVED BY: DATE: (Purchasing Agent over $30,000) W. Contractor $358.25 Engineering Purchasing $358.26 Natural Resources Project Fee $358.26 Stormwater Engineering Department - 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-OSSO - (990) 221-6605 Engineering Department 281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 cis ara� Tel: (970) 221-6605 • Fax: (970) 221-6378 Change Order Project: LPATH Berm Erosion Protection Measure Contract / Bid No.: 5998 Contractor: J-2 Contracting Company CHANGE ORDER NO.: 7 DESCRIPTION: 1. Reason for Change: Additional dewatering time needed to account for concrete rubble quantity overrun, and change of construction material and schedule. (Total 4.5 days) 2. Description of Change: Add additional amount to Lump Sum Item 23 Construction Dewatering South Spill Location 3. Change in Contract Cost: $1,074.77 4. Change in Contract Time: No a Change Order Form City of Fort t: ollins Engineering Department PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure PROJECT NUMBER: 30521700.6 (Bid No. 5998) 'CONTRACTOR: J2 Contractors (PO No. 6607396) CHANGE ORDER NUMBER: 8 n preparing change orders show in order as separate numbered paragraphs the o owing: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will decrease by $ (10,328.91) 4. There will be no change in contract time. ORIGINAL CONTRACT COST $999,996.50 TOTAL APPROVED CHANGE ORDERS ($5,811.80) TOTAL PENDING CHANGE ORDERS $5,987.68 TOTAL THIS CHANGE ORDER ($10,328.91) TOTAL % OF THIS CHANGE ORDER -1.03% TOTAL C.O. % OF ORIGINAL CONTRACT -1.02% ADJUSTED CONTRACT COST $989,843.47 (Assuming all change orders approved) ACCEPTED BY:, REVIEWED BY: DATE: // /" ATE: (t/0 ACCEPTED BY: -f�Q11�( DATE: `f O (Project Manager - Engineering) Vt7 ACCEPTED BY: DATE: (Projec(anager- Natural esources) QQ ACCEPTED BY: DATE: (Proje e - Stor ater) ACCEPTED BY: DATE: `I - /U U' (Department Head) APPROVED BY: (Purchasing Agent over $30,000) cc: Contractor ($3,442.97) Engineering Purchasing ($3,442.97) Nalural Resources Project File ($3,442.97) Stormwater DATE: Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Engineering Department 281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 a�vof� Tel: (970) 221-6605 • Fax: (970) 221-6378 Change Order Project: LPATH Berm Erosion Protection Measure Contract / Bid No.: 5998 Contractor: J-2 Contracting Company CHANGE ORDER NO.: 8 DESCRIPTION: 1. Reason for Change: Update items quantity that have been finalized. 2. Description of Change: Item Item Description Unit Unit Price Adjust Adjust Current New 7 Silt Fence $ QuantityAmount $ QuantityQuantity 8 Straw Bale — Sediment and Erosion Control Structure LF EA 1.20 15.90 722 8 866.40 3845 3,123 9 Unclassified Excavation at Borrow Site CY 0.95 828.00 127.20 786.60 8 10430 0 11,258 10 Muck Excavation CY 20.10 200.00 4,020.00 200 0 11 Native Soil (Over Revetment Mat Only)CY 7.10 228.46 1,622.07 1040 1,268.46 13 Embankment of Borrow Material at both spills including Haul CY 1.60 828.00 1,324.80 9070 9,898 14 Concrete Sill (Complete In Place) CY 203.40 1.14 231.88 170 168.86 15 Concrete Block Revetment Mat - North Spill SF 14.10 307) 27453 27,146 16 Concrete Block Revetment Mat - South Spill SF 12.05 28 ___Ii.328.702 337.40 28640 28,668 21 Ground Pre aration for Seeding AC 352.80 2 705.60 9 7 22 Topsoil (Delivery and Stockpile only - No Installation) CY 20.60 200 4,120.00 200 0 Total Adjustment 3. Change in Contract Cost: ($10,328.91) 4. Change in Contract Time: No