HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2972503/28/2007 WED 14:09 FAX 970 221 6586 CITY OF FT COLLINS CLRS 1@001/002 PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: CHANGE ORDER NO.2 Community Parks Sidewalks Construction Concepts Inc 6819 Error in bid total 1. Reason for change: The unit prices for the estimated contract quantities results in a larger Original Contract Cost amount than what was entered for the Purchase Omer 2. Description of Change: The actual Contract Cost needs to be increased by $ 37.76 3. Change in Contract Cost: $ ( 37.76 4. Change in Contract Time: 0 calendar days TOTAL APPROVED CHANGE ORDER $$ - TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $ 37.76 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0,01% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 0.01 % ADJUSTED CONTRACT COST $ 20,,40 6 (Assuming all change orders approved) ACCEPTED Contractor's ACCEPTED Project Mang REVIEWED Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 CC: City Clerk Architect Contractor Englneer Project File Puroha$ing DATE: CS DATE: 3 Z2.1 DATE: DATE: DATE: 03/28/2007 WED 14:09 FAX 970 221 6586 CITY OF FT COLLINS CLRS Q 002/002 Project: Gommuni 'Pa Sidewalks" Contmotor: Construction Concepts Inc. Bid No. 6019 4atm 301=07 pecJ I Item Description Contract Unit CONTRACT CONTRACT 1 Number Quand UnR Pric TOTAL I 1 Imobilizaillon 1 1 LS Is 2,347.00 1 S 2,347.00 Traffic control 1 j LS L3 2,61 .00 $ 2,514,001 CITY PARK 3 Remove curb and gutter 1 50 1 LF I S 1.7615 388.00 4 Remove cone. wak"Ee I g0 I SF 1 S 5.1 $ 307.20 5 UnGaa915ed lion 45 CY $ 10.76 S 484.20 6 5" Concrete fla5vorlt 516 F S 4.88 S 16 ,110 7 ADA PPdahian ram 3 a $ 966.81 S 2.900.49 6 Sod acement F S 0. 1 S 1 g84.2 E MARTINEZ Pre I 9 1 Remove cab and autter 1 S 20.15 S 322.40 10 Undaufflea Emaivation 1 116 1 CY I S 10,7719 124 ,3 11 4" 1 3 32.64 S 97.02 12 S"Cte r cre M 420 S 4.2618 27 340.20 13 ADA Pedstrlan ram o 1 I to 13 9117.00 1 $ 967.00 14 adnaplooement i 4280 I 5F 1 3 0.69 16 2083. 20, E O PARK ' . ~ 15 Remove curb and utter 40 $ 840 S 322.40 16 Remove and ralocata axiftrXltlibee tee 2 S 59&84 111 1 191.65 t UnGa redFaucavultion 130 10.77 1, 0.10 16 4' i ' skahre 4 f 3 ,30s 125-20- 19 5" Corkxeta flaavork 7122 4.1 2 ,413 20 ADA Pew bian mmDs 2 9A 21 Sod re atxment 4715 $F S 9 3 53-3 1 22 Remove curb and gutter 48 LF S 6.88 3 .24 Remove Wan tree 1 a 178.0 $ 176,00 24 Uncassifled Excavation 232 CY S 10.75 3 2.404.001 25 *'Irdoatlon sleeve 3 Ea S 32.09 8 o-07 2 5" Cor�rete 6a 1 900 SF 4.17 53 7 .00 2 IM ram 2 Ea 3 966.91 1,933.82 2 t 1160D SF 0.58 .84 , RQLlANO M P N0i LOT, PED.,BRMGE3117EVRALK. 2 Remove aMtlnd walk 1620 SF 5 1A8 5 222365.20 30, Re. a ans rt exts 3 ' brtd to s a yard 1 LS S 622. 8,00 31 Remove exls6n Curb and WNW 90 LF S 6.20 $ 556.00 32 Earlhwork - ExCavation 150 $ 8.87 S 1 030,501 33 import hankment .I.P. 1592 CY 12.0 20,530.801 34 Ped.Brid Abutm ntwlH ix 'era Lem 2 Ea S .623. 11647.84 35 nun ens n 1 Ea $ 1439.00 S 1,439.00 36 8" PVC Culvert 172 LF S 14. $ 2 552A6 37 Culvert Headwall 2 Ea IS 1750. 5 3,5 0.76 36 Concrete channel and sidewalk culvart - 2' wide 2 Ea 13 2.237.44 $ 4,474.88 39 4' Pan and cons 350 SF 13 2-00 S 2A65.00 40 AQA Pedstrian ram 5 Ea $ 966.91 S 41034.55 41 Curb and utter w/ 1' n T50 LF S 13.23 $ 9.922.50 42 5- COnu ete flalwork 63r4 S S 4. 2 S 26,6 .88 43 6" Concrete flatwork - p2d 20' x 24' 450 SF S 5.30 S z 544.00 44 8" COM816 Pavement - Parking Lot 13500 $ 3.80 S 51.300.00 45 As halt Patching 600 SF S 6.98 $ 4,188.00 40 ITOPWI - 4" all nonpayed Prima 242 CY $ 17.46 S 4,225.321 47 1 S064 mnd mulch 21395 S $ D.OB $ 7,711.80 1 48 Slri in 1 LS S 282,60 2.0 ORIGINAL CONTRACT TOTAL Page 1 of 1