HomeMy WebLinkAboutBID - 6029 DRAKE ZIEGLER IMPROVEMENT PROJECT PHASE IISPECIFICATIONS AND CONTRACT DOCUMENTS FOR Drake Zeigler Improvement Project - Phase 2 BID NO.6029 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS February 28, 2007 - 3:00 P.M. (OUR CLOCK) SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub -bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 12/03 Section 00100 Page 1 OWNER referred to in paragraph 14.5. ENGINEER may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or tests, nullify any such payment previously recommended, to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: 14.7.1. the Work is defective, or completed Work has been damaged requiring correction or replacement, 14.7.2. the Contract Price has been reduced by Written Amendment or Change Order, 14.7.3. OWNER has been required to correct defective Work or complete Work in accordance with paragraph 13.14, or 14.7.4. ENGINEER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 15.2.1 through 15.2.4 inclusive. OWNER may refuse to make payment of the full amours recommended by ENGINEER because: 14.7.5. claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the Work, 14.7.6. Liens have been filed in connection with the Work, except where CONTRACTOR has delivered a specific Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens, 14.7.7. there are other items entitling OWNER to a set- off against the amount recommended, or 14.7.8. OWNER has actual knowledge of the occurrence of any of the events enumerated in paragraphs 14.7.1 through 14.7.3 or paragraphs 15.2.1 through 15.2.4 inclusive, but OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR the amount so withheld, or any adjustment thereto agreed to by OWNER and CONTRACTOR, when CONTRACTOR corrects to OWNER'S satisfaction the reasons for such action. Substantial Completion: 14.8. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Within a reasonable time thereafter, OWNER, CONTRACTOR and ENGINEER shall make an inspection of the Work to determine the status of completion. If ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefor. If ENGINEER 30 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w1 CITY OF FORT COLLINS MODIFICATIONS (REV 42000) considers the Work substantially complete, ENGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment. OWNER shall have seven days after receipt of the tentative certificate during which to make written objection to ENGINEER as to any provisions of the certificate or attached list. If, after considenig such objections, ENGINEER concludes that the Work is not substantially complete, ENGINEER will within fourteen days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing, stating the reasons therefor. If, after consideration of OWNER's objections, ENGINEER considers the Work substantially complete, ENGINEER will within said fourteen days execute and deliver to OWNER and CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) reflecting such changes from the tentative certificate as ENGINEER believes justified after consideration of any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees. Unless OWNER and CONTRACTOR agree otherwise in writing and so inform ENGINEER in writing prior to ENGINEER's issuing the definitive certificate of Substantial Completion, ENGINEER's aforesaid recommendation will be binding on OWNER and CONTRACTOR until final payment 14.9. OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion,, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list Partial Utilization: 14.10. Use by OWNER at OWNER's option of any substantially completed part of the Work, which. (i) has specifically been identified in the Contract Documents, or (u) OWNER, ENGINEER and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to Substantial Completion of ail the Work subject to the following: 14.10.1.OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. CONTRACTOR at any time may notify OWNER and ENGINEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR and ENGINEER shall make an inspectim of that part of the Work to determine its status of completion If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that pert of the Work to be substantially complete, the provisions of paragraphs 14.8 and 14.9 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 14.10.2. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of paragraph 5.15 in respect of property insurance. Final Inspection: 14.11. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER will make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or &fective. CONTRACTOR shall immediately take such measures as are necessary to complete such work or remedy such deficiencies. Final Application for Payment 14.12. After CONTRACTOR has completed all such corrections to the satisfaction of ENGINEER and delivered in accordance with the Contract Documents all maintenance and operating instructions, schedules, guarantees, Bonds, certificates or other evidence of insurance required by paragraph5.4, certificates of inspection, marked -up record documents (as provided in paragmph6.19) and other documents, CONTRACTOR may make application for final payment following the procedure for progress payments. The final Application for Payment shall be accompanied (except as previously delivered) by: (i)all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by subparagraph5.4.13, (ii) consent of the surety, if any, to final payment, and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Liens arising out of or filed in connection with the Work. In lieu of such releases or waivers of Liens and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material and equipment for which a Lien could be filed, and (u) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNER'S property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails EKDC GENERAL CONDITIONS 1910-5 (1990 Editim) W1 CITY OF FORT COLLINS MODIFICATIONS (REV 42000) to furnish such a release or receipt in full, CONTRACTOR may famish a Bond or other collateral satisfactory to OWNER to itilemnify OWNER against any Lien. Releases or waivers of liens and the consent of the sureW to finalize payment are to be submitted on forms conforming to the format of the OWNER'S standard forms bound in the Project manual. Final Payment and Acceptance: 14.13. If, on the basis of ENGINEER's observation of the Wok during construction and fatal inspection, and ENGINEER'S review of the final Application for Payment and accompanying documentation as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fiilfilled, ENGINEER. will, within ten days after receipt of the final Application for Payment, indicate in writing ENGINEER's recommendation of payment and present the Application to OWNER for payment. At the same time ENGINEER will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.15. Otherwise, ENGINEER will return the Application to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application. Thirty days after presentation to OWNER of the Application and accompanying documentation, in appropriate form and substance and with ENGINEER's recommendation and notice of acceptability, the amount recommended by ENGINEER will become due and will be paid by OWNER to CONTRACTOR subject to paragraph 17 6.2 of these General Conditions. 14.14. It through no fault of CONTRACTOR, final completion of the Work is significantly delayed and if ENGINEER so confirms, OWNER shall, upon receipt of CONTRACTOR's final Application for Payment and recommendation of ENGINEER, and without terminating the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph 5.1, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by CONTRACTOR to ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. Wailer of Claims: 14.15. The making and acceptance of final payment will constitute: 14.15.].a waiver of all claims by OWNER against. CONTRACTOR, except claims arising from unsettled Liens, from defective Work appearing after 31 final inspection pursuant to paragraph 14.11, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR's continuing obligations under the Contract Documents; and 14.15.2.A waiver of all claims by CONTRACTOR against OWNER other than those previously made in writing and still unsettled. ARTICLE 15--SUSPENSION OF WORK AND TERMINATION OWNER May Suspend Work: 15.1. At any time and without cause, OWNER may suspend the Work or any portion thereof for a period of not more than ninety days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the date so fixed CONTRACTOR shall be allowed an adjustment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension if CONTRACTOR makes an approved claim therefor as provided in Articles 11 and 12. OWNER May Terminate: 15.2. Upon the occurrence of any one or more of the following events: 15.2.1. if CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph2.9 as adjusted from time to time pursuant to paragraph 6.6), 15.2.2. if CONTRACTOR disregards Laws or Regulations of any public body having jurisdiction; 15.2.3. if CONTRACTOR disregards the authority of ENGINEER; or 15.2.4. if CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Documents; OWNER may, after giving CONTRACTOR (and the surety, if any) seven days' written notice and to the extent permitted by Laws and Regulations, terminate the services of CONTRACTOR, exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTORS tools, appliances, construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid ,32 EICDC GENERAL CONDITIONS 1910-8 (1990d Etiai) w/ CITY OF FORT COLLINS MODIFICATIONS (REV V2000) CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may dean expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by OWNER arising out of or resulting from completing the Work such excess will be paid to CONTRACTOR If such claims, costs, lasses and damages exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such claims, costs, losses and damages incurred by OWNER will be reviewed by ENGINEER as to their reasonableness and when so approved by ENGINEER incorporated in a Change Order, provided that when exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed. 15.3. Where CONTRACTOR's services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR from liability. 15.4. Upon seven days' written notice to CONTRACTOR and ENGINEER, OWNER may, without cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Agreement. In such case, CONTRACTOR shall be paid (without duplication of any items): 15.4.1. for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 15.4.2. for expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 15.4.3. for all claims, costs, losses and damages incurred in settlement of terminated contracts with Subcontractors, Suppliers and others; and 15.4.4. for reasonable expenses directly attributable to termination. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination CONTRACTOR May Stop Work or Terminate., 15.5. If through no act or fault of CONTRACTOR, the Work is suspended for a period of more than ninety days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within thirty days after it is submitted or OWNER fails for thirty days to pay CONTRACTOR any sum finally determined to be due, then CONTRACTOR may, upon seven days' written notice to OWNER and ENGINEER, and provided OWNER cr ENGINEER do not remedy such suspension or failure within that time, terminate the Agreement and recover from OWNER payment on the same terms as provided in paragraph 15.4. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if ENGINEER has failed to act on an Application for Payment within thirty days after it is submitted, or OWNER has failed for thirty days to pay CONTRACTOR any sum finally determined to be due, CONTRACTOR may upon seven days' written notice to OWNER and ENGINEER stop the Work until payment of all such amounts due CONTRACTOR, including interest thereon The provisions of this paragraph 15.5 are not intended to preclude CONTRACTOR from making claim under Articles 11 and 12 for an increase in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to CONTRACTOWs stopping Work as permitted by this paragraph. ARTICLE 16—DISPUTE RESOLUTION If and to the extent that OWNER and CONTRACTOR have agreed on the method and procedure for resolving disputes between them that may arise under this Agreement, such dispute resolution method and procedure, if any, shall be as set forth in ExhibitGC-A, "Dispute Resolution Agreement", to be attached hereto and made a part hereof. If no such agreement on the method and procedure for resolving such disputes has been reached, and subject to the provisions of paragraphs 9.10, 9.11 and 9.12, OWNER and CONTRACTOR may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any dispute. ARTICLE 17—MISCELLANEOUS Giving Notice: 17.1. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm, or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.2. Computation of Time: 17.2.1. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. EJCDC GENERAL CONDITIONS 1910-8 (1990 E(itim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) 172.2. A calendar day of twenty-four hours measured from midnight to the next midnight will constitute a day. Notice of Claim; 17.3. Should OWNER or CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the other party or of any of the other party's employees or agents or others for whose acts the other party is legally liable, claim will be made in writing to the other party within a reasonable time of the first observance of such injury or damage. The provisions of this paragraph 17.3 shalll not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or repose.CumuMve Remedies.• 17.4. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by paragraphs 6.12, 6.16, 6.30, 6.31, 632, 13.1, 13.12, 13.14, 14.3 and 15.2 and all of the rights and remedies available to OWNER and ENGINEER thereunder, are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. Professional Fees and Court Costs Included• 17.5. Whenever reference is made to "claims, costs, losses and damages", it shall include in each case, but not be limited to, all fees and charges of engineers, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs. 17.6. The laws of the State of Colorado apply to this Agreement Reference to two pertinent Colorado statutes are as follows, 17.6.2. If a claim is filed OWNER is required by law (CRS 38-26-107) to withhold from all payments to CONTRACTOR sufficient funds to insure the payment of all claims for labor. materials, team hire. sustenance, provisions, provender, or other supplies used or consumed bv CONTRACTOR or his 33 34 E)CDC GENERAL CONDITIONS 1910-8 (1990 Editlm) w/ CITY OF FORT COLLINS MODIFICATIONS (REV V200O) (This page left blank intentionally.) EICDC GENERAL CONDITIONS I910-8 (1990 Edlim) 35 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) EJCDC GENERAL CONDITIONS 1910.8 (1990 Ed tim) 36 w/CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) EXHIBIT GC -A to General Conditions of the Construction Contract Between OWNER and CONTRACTOR DISPUTE RESOLUTION AGREEMENT OWNER and CONTRACTOR hereby agree that Article 16 of the General Conditions of the Construction Contract between OWNER and CONTRACTOR is amended to include the following agreement of the parties: 16.1. All claims, disputes and other matters in question between OWNER and CONTRACTOR arising out of or relating to the Contract Documents or the breach thereof (except for claims which have been waived by the making or acceptance of final payment as provided by paragraph 14.15) will be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association then obtaining, subject to the limitations of the Article 16. This agreement so to arbitrate and any other agreement or consent to arbitrate entered into in accordance herewith as provided in this Article 16 will be specifically enforceable under the prevailing law of any court having jurisdiction. 16.2. No demand for arbitration of any claim, dispute or other matter that is required to be referred to ENGINEER initially for decision in accordance with paragraph 9.11 will be made until the earlier of (a) the date on which ENGINEER has rendered a written decision or (b) the thirty -fast day after the parties have presented their evidence to ENGINEER if a written decision has not been rendered by ENGINEER before that date. No demand for arbitration of any such claim, dispute or other matter will be made later than thirty days after the date on which ENGINEER has rendered a written decision in respect thereof in accordance with paragraph 9.11; and the failure to demand arbitration within said thirty days' period will result in ENGINEER's decision being final and binding upon OWNER and CONTRACTOR If ENGINEER renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence but will not supersede the arbitration proceedings, except where the decision is acceptable to the parties concerned. No demand for arbitration of any written decision of ENGINEER rendered in accordance with paragraph 9.10 will be made later than ten days after the party making such demand has delivered written notice of intention to appeal as provided in paragraph 9.10. 16.3. Notice of the demand for arbitration will be filed in writing with the other party to the Agreement and with the American Arbitration Association, and a copy will be sent to ENGINEER for information. The demand for arbitration will be made within the thirty -day or ten-day period specified in paragraph 16.2 as applicable, and in all other cases within a reasonable time after the claim, dispute or other matter in question has arisen, and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the applicable statute of limitations. EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) 16.4. Except as provided in paragraph 16.5 below, no arbitration arising out of or relating to the Contract Documents shall include by consolidation, joinder or in any other mariner any other person or entity (including ENGINEER, ENGINEER's Consultant and the officers, directors, agents, employees or consultants of any of them) who is not a party to this contract unless: 16.4.1. the inclusion of such other person or entity is necessary if complete relief is to be afforded among those who are already parties to the arbitration, and 16.42. such other person or entity is substantially involved in a question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings, and 16.4.3. the written consent of the other person or entity sought to be included and of OWNER and CONTRACTOR has been obtained for such inclusion, which consent shall make specific reference to this paragraph; but no such consent shall constitute consent to arbitration of any dispute not specifically described in such consent or to arbitration with any party not specifically identified in such consent. 16.5. Notwithstanding paragraph 16.4, if a claim, dispute or other matter in question between OWNER and CONTRACTOR involves the Work of a Subcontractor, either OWNER or CONTRACTOR may join such Subcontractor as a party to the arbitration between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts required by paragraph 6.11 a specific provision whereby the Subcontractor consents to being joined in an arbitration between OWNER and CONTRACTOR involving the Wok of such Subcontractor. Nothing in this paragraph 16.5 nor in the provision of such subcontract consenting to joinder shall create arty claim, right or cause of action in favor of Subcontractor and against OWNER, ENGINEER or ENGINEER's Consultants that does not otherwise exist. 16.6. The award rendered by the arbitrators will be final, judgment may be entered upon it in any court having jurisdiction thereof, and it will not be subject to modification or appeal. 16.7. OWNER and CONTRACTOR agree that they shall first submit any and all unsettled claims, counterclaims, disputes and other matters in question between them arising out of or relating to the Contract Documents or the breach thereof ("disputes"), to mediation by the American Arbitration Association under the Construction Industry Mediation Rules of the American Arbitration Association prior to either of them initiating against the other a demand for arbitration pursuant to paragraphs 16.1 through 16.6, unless delay in initiating arbitration would irrevocably prejudice one of the parties. The respective thirty and ten day time limits within which to file a demand for arbitration as provided in paragraphs 16.2 and 16.3 above shall be suspended with respect to a dispute submitted to mediation within those same applicable time limits and shall remain suspended until ten days after the termination of the mediation. The mediator of any dispute submitted to mediation under this Agreement shall not serve as arbitrator of such dispute unless otherwise agreed. GC -AI EICDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94) GC -Al SE SECTION 00800 SUPPLEMENTARY CONDITIONS 3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and 12/03 Section 00100 Page 2 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL) . SC-12.3 Add the following language to the end of paragraph 12.3. Contractor will include in the project schedule 0 days lost due to abnormal weather conditions. 7/96 Section 00800 Page 1 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950Contract Change Order 00960Application for Payment 9/99 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost 4. Change in Contract Time: ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL o OF THIS CHANGE ORDER TOTAL C.O.% OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved ACCEPTED BY: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Contractor Project File Architect Engineer Purchasing $ .00 0.00 0.00 0.00 $ 0.00 DATE: DATE: DATE: DATE: DATE: 9/99 Section 00950 Page 1 NUMBER 1 2 3 Rontinn nnatin APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract DATE Net Change by Change Order AMOUNT $0.00 The present status of the account for this Contract is as follows: Original Contract Amount: Net Change by Change Order: Current contract Amount: Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: Less Retainage: AMOUNT DUE THIS APPLICATION: CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. I Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. I Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. I Date: By: Payment of the above Amount Due This Application is approved by the OWNER. $0.00 $0.00 $0.00 /��I/ V Section UUybU Page 1 APPLICATION FOR CONTRACT AMOUNTS PAYMENT PAGE 2 OF 4 Work Work Work Completed Completed Completed Stored This Previous To Bid Month Periods Date Materials Total Item This Earned Percent Unit Number Description Quantity Units Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 2 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Work Work Completed Completed Completed Stored This Previous To Bid Month Periods Date Materials Total Item This Earned Percent Unit To Number Description Quantity Units Price Amount Qty. Amount Qty. Amount Qty. Amount Period Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 3 STORED MATERIALS SUMMARY On Hand Received Installed Item Invoice Previous This This Number Number Description Application Period Period PAGE 4 OF 4 On Hand This Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 7/96 Section 00960 Page 4 Drake/Ziegler Improvement Project Phase 11 Date: December 27, 2006 DRAKE/ZIEGLER IMPROVEMENT PROJECT PHASE II The Engineers Joint Contract Documents Committee General Conditions govern the construction of this contract. The following General Requirements supplement these General Conditions. PROJECT GENERAL REQUIREMENTS TABLE OF CONTENTS SECTION PAGE 01010 SUMMARY OF WORK............................................................................................ General Reqs. 2-3 01040 COORDINATION..................................................................................................... General Reqs. 4-5 01310 CONSTRUCTION SCHEDULES............................................................................. General Reqs. 6-7 01330 SURVEY DATA — (Owner Supplied)....................................................................... General Reqs. 8 01340 SHOP DRAWINGS................................................................................................... General Reqs. 9-11 01410 TESTING................................................................................................................... General Reqs. 12-13 01510 TEMPORARY UTILUTIES...................................................................................... General Reqs. 14 01560 TEMPORARY CONTROL....................................................................................... General Reqs. 15-16 01570 TREE PROTECTION............................................................................................... General Reqs. 17-18 01580 TRAFFIC REGULATION — (City of Fort Collins Supplied) ................................... General Reqs. 19-20 01700 CONTRACT CLOSEOUT........................................................................................ General Reqs. 21 01711 SITE CLEANUP....................................................................................................... General Reqs. 22 01720 PROJECT RECORD DOCUMENTS....................................................................... General Reqs. 23 C\DOCUME—l\cpatters\LOCALS--I\Temp\Drake Ziegler General Specs.doc General Reqs. - 1 Drake/Ziegler Improvement Project Phase 11 SUMMARY OF WORK 1.1 DESCRIPTION OF WORK Date: December 27, 2006 A. The Work shall consist of the construction of the outlined improvements: BID NO. 6029 Drake/Ziegler Improvement Project Phase II The second phase of construction will complete the drainage improvements necessary to realign Ziegler Road to the west side of the Fossil Creek Reservoir Inlet Ditch, to replace the existing substandard County Road -9 ( County Road #9 is now named Ziegler Road). This project also includes an Outfall Channel for the stormwater detention from the Rigden Pond 216 to the Poudre River (approx. 7200 LF) and includes two 48" Siphon Pipes across the Boxelder ditch, FICRD ditch and County Road 9. The Project also includes a 20'XTX184' Cast -in -Place Box Culvert over the FICRD Ditch. Staff as also coordinated with this project the installation of a 30" Sanitary Sewer Line that will be constructed by the City's Water and Waste Water Utility contractor. Excess dirt for the Outfall channel will be hauled over to the roadway and placed as Embankment from the end of Drake Road at Environmental Drive south 4200 feet to Horsetooth Road in preparation for the Third phase that will complete the arterial roadway at a later date. B. Protection and Restoration. 1. Replace to equal or better conditions all items removed and replaced or damaged during construction. 2. Restore all areas disturbed to match surrounding surface conditions. 3. The Owners Field Representative must approve the condition of all replaced and/or restored areas prior to final payment. 1.2 NOTICES TO PRIVATE OWNERS AND AUTHORITIES The following items shall be coordinated between the Contractor and the Owners Field Representative. A. Notify private owners of adjacent properties, utilities, irrigation canals, and affected governmental agencies when prosecution of the Work may affect them. B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is necessary to temporarily deny access or services. C. Contact utilities at least 48 hours prior to excavating near underground utilities. D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed scope of work schedule and any items, which would affect their daily operation. E. Names and telephone numbers of affected agencies and utilities in the area are listed below for Contractor's convenience. C:\DOCUME-1\cpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 2 Drake/Ziegler Improvement Project Phase If UTILITIES Water: Storm Sewer: Sanitary Sewer: Electric: Gas/Electric: Telephone: Traffic Operations: Cable Television: Electric: Utility Locates FCRID Ditch Rider Box Elder Ditch Rider City of Fort Collins, Colorado Fort Collins -Loveland Water District City of Fort Collins, Colorado City of Fort Collins, Colorado City of Fort Collins, Colorado Xcel Energies Qwest Communications City of Ft. Collins, Colorado Comcast Poudre Valley REA Under A One -call @ system North Poudre Irrigation Company Box Elder Ditch Company AGENCIES Occupational Safety & Health Administration (OSHA): Poudre Fire Authority Non -Emergency: Emergency: City of Fort Collins Police Department Non -Emergency: Emergency: Larimer County Sheriffs Department Non -Emergency: Emergency: Postmaster: US Postal Service Judith Robertson: Ambulance: Poudre Valley Hospital Transportation: Non -Emergency: Emergency: Transfort: Traffic Engineering END OF SECTION C\DOCUME—I\cpatters\LOCAL&-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 3 Date: December 27, 2006 221-6681 226-3104 221-6589 221-6681 221-6700 225-7847 377-6401 221-6630 493-7400 226-1234 1-800-922-1987 568-3612 482-3067 844-3061 221-6581 911 221-6550 911 221-7177 911 225-4111 484-1227 911 221-6620 221-6630 furnishing of the Work. 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 12/03 Section 00100 Page 3 Drake/Ziegler Improvement Project Phase II SECTION 01040 COORDINATION 1.1 GENERAL CONTRACTOR RESPONSIBILITIES Date: December 27, 2006 A. Coordinate operations under contract in a manner, which will facilitate progress of the Work. The Contractor shall also coordinate with the Utility Companies and City Traffic Department whose Work is separate from the General Contractor's contract. B. Conform to the requirements of public utilities and concerned public agencies in respect to the timing and manner of performance of operations which affect the service of such utilities, agencies, or public safety. C. Coordinate operations under contract with utility work to allow for efficient completion of the Work. D. Coordinate all operations with the adjoining property owners, business owners, and surrounding neighborhoods to provide satisfactory access at all times and keep them informed at all times. To work with the local fire and police departments to ensure the traffic control plan is followed in emergency situations with no exceptions of disruption to traffic flow. E. Keep traffic areas and temporary residential accesses free of excavated material, construction equipment, pipe and other material and equipment. F. Keep fire hydrants and utility control valves free from obstruction and available for use at all times. G. Conduct operations in a manner to avoid unnecessary interference with public and private roads and drives. H. Provide and maintain temporary approaches or crossings at streets and residences. 1.2 SCHEDULE AND MILESTONES The Contractor shall submit a detailed project schedule showing milestones and the critical path for Drake/Ziegler Improvement Project Phase II 2007. This schedule shall be agreed to by both the Owner and Contractor. It shall be made in writing and signed by both parties. 1.3 CONFERENCES A. A Pre -construction Conference will be held prior to the start of construction. 1. Contractor shall participate in the conference accompanied by all major Subcontractors. 2. Contractor shall designate/introduce Superintendent, and major Subcontractors supervisors assigned to project. 3. Contractor shall submit in writing proposed daily construction hours to Engineer for approval. 4. Contractor shall designate all access roads and parking areas in writing to the Engineer for approval. 5. The Engineer shall invite all utility and irrigation companies involved. 6. The Utilities will be asked to designate their coordination person, provide utility plans, and their anticipated schedules. 7. The Engineer shall introduce the Project Representatives. S. At this time the superintendent will be expected to show that he has sufficient knowledge of the specifications and plans to orchestrate and coordinate the construction actives for this job. C:\DOCUME-1\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 4 Drake/Ziegler Improvement Project Phase II Date: December 27, 2006 B. Additional project coordination conferences will be held prior to start of construction for coordination of the Work, refining project schedules, and utility coordination. C. The Engineer may hold coordination conferences, to be attended by all parties involved, when the Contractor's operations affect, or are affected by, the work of others. 1. Contractor shall participate in such conferences accompanied by Subcontractors as required by the Engineer. 1.4 PROGRESS MEETINGS A. Contractor and Project Manager shall schedule and hold regular progress meetings at least weekly and at other times as requested by the Engineer or required by the progress of the Work. B. Attendance shall include: 1. Contractor and Superintendent. 2. Owner's Representatives. 3. Engineer and Project Manager. 4. Others as may be requested by Contractor, Engineer or Owner. C. Minimum agenda shall include: 1. Review of work progress since last meeting. 2. Identification and discussion of problems affecting progress. 3. Review of any pending change orders. 4. Revision of Construction Schedule as appropriate. 5. Review Milestone Schedule. 6. Discuss the work scheduled for the next two weeks. 7. Discuss the surveying needed for the next week. D. The Engineer or a Project Representative shall preside at meetings and record and distribute minutes to the participants. E. The Engineer or Engineer's Field Representative and Contractor shall agree to weekly quantities at the progress meetings. The weekly quantity sheets shall be signed by both parties. These quantity sheets, when signed, shall be final and shall be the basis for the monthly progress estimates. This process ensures accurate monthly project pay estimates. END OF SECTION C:\DOCUME—I\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 5 Drake/Ziegler Improvement Project Phase 11 SECTION 01310 CONSTRUCTION SCHEDULES 1.1 GENERAL Date: December 27, 2006 A. The contractor shall prepare a detailed schedule of all construction operations and procurement after review of tentative schedule by parties attending the pre -construction conference. This schedule will show how the contractor intends to meet the milestones set forth. 1. No work is to begin at the site until Owner's acceptance of the Construction Progress Schedule and Report of delivery of equipment and materials. 1.2 FORMAT AND SUBMISSIONS A. Prepare construction and procure schedules in a graphic format suitable for displaying scheduled and actual progress. B. Submit two copies of each schedule to Owner for review. 1. Owner will return one copy to Contractor with revisions suggested or necessary for coordination of the Work with the needs of Owner or others. 2. The contractor will be required to submit a weekly progress schedule showing work to be completed, labor, equipment, work hours and methods of construction for the up coming week. This schedule will be required every Thursday in a daily calendar format. C. The schedule must show how the street, storm sewer, concrete and paving work will be coordinated. 1.3 CONTENT A. Construction Progress Schedule. 1. Show the complete work sequence of construction by activity and location. 2. Show changes to traffic control. 3. Show project milestones. B. Equipment, Materials and Submittals schedule. 1. Show delivery status of critical and major items of equipment and materials. 2. Include a critical path schedule for Shop Drawings, tests, and other submittal requirements for equipment and materials, reference Section 01340. 1.4 PROGRESS REVISIONS A. Submit revised schedules and reports at weekly project coordination meetings when changes are foreseen, when requested by Owner or Engineer, and with each application for progress payment. B. Show changes occurring since previous submission. 1. Actual progress of each item to date. 2. Revised projections of progress and completion. C. Provide a narrative report as needed to define: 1. Anticipated problems, recommended actions, and their effects on the schedule. 2. The effect of changes on schedules of others. C\DOCUME—]\cpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 6 Drake/Ziegler Improvement Project Phase II Date: December 27, 2006 1.5 OWNER'S RESPONSIBILITY A. Owner's review is only for the purpose of checking conformity with the Contract Documents and assisting the Contractor in coordinating the Work with the needs of the Project. B. It is not to be construed as relieving Contractor from any responsibility to determine the means, methods, techniques, sequences and procedures of construction as provided in the General Conditions. END OF SECTION CADOCUME—I\cpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 7 Drake/Begler Improvement Project Phase If SECTION 01330 SURVEY DATA 1.1 SURVEY REQUIREMENTS Date: December 27, 2006 A. The Owner will not provide the construction surveying for the Project. The Contractor will be responsible to provide the surveying required on this project. B. The Owner will make the projects CAD drawings available to the Contractor upon request. C. If the requested surveying cannot be accomplished in the time frame requested by the Contractor, the survey personnel shall notify the contractor with the date on which the requested work will be completed. D. Should a sudden change in the Contractor's operations or schedule require the survey personnel to work overtime, the Contractor shall pay the additional overtime expense. E. The Contractor shall protect all survey monuments and construction stakes. If it is unavoidable to remove a survey monument or construction stakes, the Contractor is responsible for notifying the Surveyor and allowing enough time for the monuments or stakes to be relocated. The Contractor will be responsible for the cost of restaking construction stakes and for the cost of re-establishing a destroyed monument. F. The Contractor must submit a survey request to the Surveyors a minimum of 48 hours prior to needing surveying work done. END OF SECTION CADOCUME-1\cpatters\LOCALS—l\Temp\Drake Ziegler General Specs.doc General Reqs. - 8 Drake/Begler Improvement Project Phase II SECTION 01340 SHOP DRAWINGS 1.1 GENERAL Date: December 27, 2006 A. Submit Shop Drawings, Samples, and other submittals as required by individual specification sections. 1. The Engineer will not accept Shop Drawings or other submittals from anyone but the Contractor. B. Schedule: Reference Section 01310, Construction Schedules. Submittals received by the Engineer prior to the time set forth in the approved schedule will be reviewed at any time convenient to the Engineer before the time required by the schedule. C. Any need for more than one resubmission, or any other delay in obtaining the Engineer's review of submittals, will not entitle the Contractor to an extension of the Contract Time, unless delay of the Work is directly caused by failure of the Engineer to return any scheduled submittal within 10 days after receipt in his office of all information required for review of the submittals or for any other reason which prevents the Engineer's timely review. Failure of Contractor to coordinate submittals that must be reviewed together will not entitle the Contractor to an extension of Contract Time or an increase in Contract Price. D. Resubmit a corrected submittal if errors are discovered during manufacture or fabrication. E. Do not use materials or equipment for which Shop Drawings or samples are required until such submittals, stamped by the Contractor and properly marked by the Engineer, are at the site and available to workmen. F. Only use Shop Drawings which bear Engineer's mark "NO EXCEPTION TAKEN" in the performance of the Work. Review status designations listed on Engineer's submittal review stamp are defined as follows: 1. NO EXCEPTION TAKEN Signifies material or equipment represented by the submittal conforms to the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work. Contractor is to proceed with fabrication or procurement of the items and with related work. Copies of the submittal are to be transmitted for final distribution. 2. REVISE AS NOTED Signifies material or equipment represented by the submittal conforms to the design concept, complies with the information given in the Contract Documents and is acceptable for incorporation in the Work in accordance with Engineer's notations. Contractor is to proceed with the Work in accordance with Engineer's notations and is to submit a revised submittal responsive to notations marked on the returned submittal or written in the letter of transmittal. 3. REJECTED Signifies material or equipment represented by the submittal does not conform to the design concept or comply with the information given in the Contract Documents and is not acceptable for use in the Work. Contractor is to submit submittals responsive to the Contract Documents. 4. FOR REFERENCE ONLY C\DOCUME-1\cpaucrs\LOCALS—l\Temp\Drake Ziegler General Specs.doc General Reqs. - 9 Drake/Ziegler Improvement Project Phase 11 Date: December 27, 2006 Signifies submittals which are for supplementary information only; pamphlets, general information sheets, catalog cuts, standard sheets, bulletins and similar data, all of which are useful to Engineer or Owner in design, operation, or maintenance. But these submittals do not constitute a basis for determining that items represented thereby conform to the design concept or comply with the information given in the Contract Document. The Engineer reviews such submittals for general information, but not for substance. 1.2 SUBMITTAL REGISTER A. The Contractor shall complete the Submittal Register and submit with the Final Construction Schedule submittal. The Contractor must resubmit an updated Submittal Register with each application for progress payment. A format of the Submittal Register is provided below, Contractor should reproduce this format, (or an approved alternate) for this register. B. Instructions for Completing the Submittal Register: Column 1: References, specification section, and paragraph in which submittal is requested. This will be done for each item of equipment or material. Column 2: Describe types of submittal required, i.e., shop drawing, certificate, etc. Column 3: List the material or item for which submittal is required. Column 4: Contractor shall provide the date that he intends to make each submittal. Column 5: Contractor shall provide that date by which each submittal must be approved to accomplish timely incorporation into the project. Column 6: Contractor shall provide the mailing date of the initial submittal made to the Owner. Column 7: Contractor shall record the review action of the Owner to the last submittal for the item, equipment, or material. Column S: Contractor shall record the mailing date of subsequent submittal for each item, equipment, and material until submittal is accepted by Owner. Column 9: Contractor may record remarks as necessary to coordinate with other submittal or provide necessary information. 1.3 SHOP DRAWINGS A. Include the following information as required to define each item proposed to be furnished. 1. Detailed installation drawings showing foundation details and clearances required for construction. 2. Relation to adjacent or critical features of the Work or materials. 3. Field dimensions, clearly identified as such. 4. Applicable standards, such as ASTM or Federal Specification numbers. 5. Drawings, catalogs or parts thereof, manufacturer's specifications and data, instructions, performance characteristics and capacities, and other information specified or necessary: a. For Engineer to determine that the materials and equipment conform to the design concept and comply with the intent of the Contract Documents. b. For the proper erection, installation, and maintenance of the materials and equipment which Engineer will review for general information but not for substance. c. For Engineer to determine what supports, anchorages, structural details, connections and services are required for materials and equipment, and the effect on contiguous or related structures, materials and equipment. 6. Complete dimensions, clearances required, design criteria, materials of construction and the like to enable Engineer to review the information effectively. B. Manufacturer's standard drawings, schematics and diagrams: 1. Delete information not applicable to the Work. 2. Supplement standard information to provide information specifically applicable to the Work. C:\DOCUME—I\cpatters\LOCALS--I\Temp\Drake Ziegler General Specs.doc General Reqs. - 10 DrakeMegler Improvement Project Phase II Date: December 27, 2006 C. Format. 1. Present in a clear and thorough manner. 2. Minimum sheet size: 8 'h" x I 1 ". 3. Clearly mark each copy to identify pertinent products and models. 4. Individually annotate standard drawings, which are furnished, cross out items that do not apply, describe exactly which parts of the drawing apply to the equipment being furnished. 5. Individually annotate catalog sheets to identify applicable items. 6. Reproduction or copies of portions of Contract Documents: a. Not acceptable as complete fabrication or erection drawings. b. Acceptable when used as a drawing upon which to indicate information on erection or to identify detail drawings. 7. Clearly identify the following: a. Date of submission. b. Project title and number. c. Names of Contractor, Supplier and Manufacturer. d. Specification section number, specification article number for which items apply, intended use of item in the work, and equipment designation. e. Identify details by reference to sheet, detail, and schedule or room numbers shown in the Contract Documents. f. Deviations from Contract Documents. g. Revisions on re -submittals. h. Contractor's stamp, initialed or signed, certifying the review of submittal, verification of products, field measurements and field construction criteria, and coordination of the information within the submittal with requirements of the Work and the Contract Documents. 1.4 SUBMISSION REQUIREMENTS A. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Minimum number required: 1. Shop Drawings. a. Three (3) copies minimum, two (2) copies which will be retained by Engineer. 1.5 RESUBMISSION REQUIREMENTS A. Make corrections or changes required by Engineer and resubmit until accepted. B. In writing, call Engineer's attention to deviations that the submittal may have from the Contract Documents. C. In writing, call specific attention to revisions other than those called for by Engineer on previous submissions. D. Shop Drawings 1. Include additional drawings that may be required to show essential details of any changes proposed by Contractor along with required wiring and piping layouts. END OF SECTION C:\DOCUME—]\cpatters\LOCALS--1\Temp\Drake Ziegler General Specs.doc General Reqs. - 11 Drake/Ziegler Improvement Project Phase II SECTION 01410 TESTING 1.1 GENERAL Date: December 27, 2006 A. Provide such equipment and facilities as the Engineer may require for conducting field tests and for collecting and forwarding samples. Do not use any materials or equipment represented by samples until tests, if required, have been made and the materials or equipment are found to be acceptable. Any product, which becomes unfit for use after approval hereof, shall not be incorporated into the work. B. All materials or equipment proposed to be used may be tested at any time during their preparation or use. Furnish the required samples without charge and give sufficient notice of the placing of orders to permit the testing. Products may be sampled either prior to shipment or after being received at the site of the work. C. Tests shall be made by an accredited testing laboratory selected by the Owner. Except as otherwise provided, sampling and testing of all materials and the laboratory methods and testing equipment shall be in accordance with the latest standards and tentative methods of the American Society for Testing Materials (ASTM). D. Where additional or specified information concerning testing methods, sample sizes, etc., is required, such information is included under the applicable sections of the Specifications. Any modification of, or elaboration on these test procedures (which may be included for specific materials under their respective sections in the Specifications) shall take precedence over these procedures. 1.2 OWNER'S RESPONSIBILITIES A. Owner shall be responsible for and shall pay all costs in connection with testing for the following: 1. Soil tests, except those called for under Submittals thereof. 2. Tests not called for by the Specifications of materials delivered to the site but deemed necessary by Owner. 3. Concrete tests, except those called for under Submittals thereof. 4. Asphalt tests, except those called for under Submittals thereof. 1.3 CONTRACTOR'S RESPONSIBILITIES A. In addition to those inspections and tests called for in the General Conditions, the Contractor shall also be responsible for the following: 1. All performance and field testing specifically called for by the specifications. 2. All re -testing for Work or materials found defective or unsatisfactory, including tests covered under section 1.2 above. 3. All minimum call out charges or stand by time charges from the tester due to the Contractor's failure to pave, pour, or fill on schedule for any reason except by action of the Engineer. B. Contractor shall notify the Project Engineer 48 hours prior to performing an operation that would require testing. C:\DOCUME-1\cpauers\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 12 Drake/Ziegler Improvement Project Phase 11 Date: December 27, 2006 1.4 CONTRACTOR'S QUALITY CONTROL SYSTEM A. General: The Contractor shall establish a quality control system to perform sufficient inspection and tests of all items of Work, including that of his subcontractors, to ensure conformance to the functional performance of this project. The control shall be established for all construction except where the Contract Documents provide for specific compliance tests by testing laboratories or engineers employed by the Owner. The Contractor's control system shall specifically include all testing required by the various sections of these Specifications. B. Superintendence: The Contractor SHALL employ a full time Superintendent whose sole resuonsibility is to monitor and coordinate all facets of the Work. The Superintendent shall be on site when work is in progress (i.e. weekend work). The Superintendent shall have adequate experience to perform the duties of Superintendent. The superintendent shall have the authority to act on behalf of the CONTRACTOR. The superintendent shall not be replaced without written notice to the Owner and Engineer. C. Quality Control: Contractor's quality control system is the means by which he assures himself that his construction complies with the requirements of the Contract Documents. Controls shall be adequate to cover all construction operations and should be keyed to the proposed construction schedule. D. Records: Maintain correct records on an appropriate form for all inspections and tests performed, instructions received from the Engineer and actions taken as a result of those instructions. These records shall include evidence that the required inspections or tests have been performed (including type and number of inspections or test, nature of defects, causes for rejection, etc.) proposed or directed remedial action, and corrective action taken. Contractor is responsible for documenting all inspections and tests as required by each section of the Specifications. Provide copies to the Engineer weekly. END OF SECTION CADOCUME--I\cpatters\LOCALS—lUempOrakeZiegler General Specs.doc General Reqs. - 13 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices 12/03 Section 00100 Page 4 Drake/Ziegler Improvement Project Phase 11 SECTION 01510 TEMPORARY UTILITIES 1.1 UTILITIES A. Furnish all utilities necessary for construction. Date: December 27, 2006 B. The Contractor will be responsible for furnishine water in reasonable amounts for execution of the work. The Contractor shall coordinate and schedule with the Owners' Field Representative for the City of Fort Collins Water Utilities to select the appropriate fire hydrant and set the hydrant meter. C. Make arrangements with Owner as to the amount of water required and time when water will be needed. 1. Owner will fix the place, time, rate and duration of each withdrawal from the distribution system. 2. Unnecessary waste of water will not be tolerated. D. Furnish necessary water trucks, pipes, hoses, nozzles, and tools and perform all necessary labor. 1. Only the Owner shall operate existing valves and hydrants. 1.2 SANITARY FACILITIES A. Contractor shall furnish temporary sanitary facilities at each site for the needs of construction workers and others performing work or furnishing services on the Project. Furnish a minimum of two portable toilets at the trailers (if office trailers are required) and a minimum of one at each project work site or as required to accommodate the number of personnel working on site. One facility will be delivered to the City of Fort Collins Project trailer. B. Contractor shall properly maintain sanitary facilities of reasonable capacity throughout construction periods. C. Contractor to enforce the use of such sanitary facilities by all personnel at the site. D. Place facilities out of public view using the greatest practical extent. END OF SECTION C:\DOCUME—I\cpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 14 Drake/Ziegler Improvement Project Phase It SECTION 01560 TEMPORARY CONTROLS 1.1 NOISE CONTROL Date: December 27, 2006 A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed in populated areas. B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and operated in a manner to cause the least noise consistent with efficient performance of the Work. C. Cease operation of all machinery and vehicles between the hours of 7:30 p.m. and 6:30 a.m. 1.2 DUST CONTROL A. Dusty materials in piles or in transit shall be covered when necessary to prevent blowing. B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be kept moist with water or by application of a chemical dust suppressant. Chemical dust suppressant shall not be injurious to existing or future vegetation. C. Dust control within the time deposit area shall conform to the project's health and safety plan. At a minimum, the lime area shall be covered as soon as possible after compaction has been obtained to minimize surface drying and dust. Dust control for this area may involve multiple watering and/or continuous watering to maintain a moist surface. 1.3 POLLUTION CONTROL A. Prevent the pollution of drains and watercourses by sanitary wastes, concrete, sediment, debris and other substances resulting from construction activities. 1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the site. 2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and culverts. 1.4 EROSION CONTROL A. Take such measures as are necessary to prevent erosion of soil that might result from construction activities. Measures in eeneral will include: 1. Control of runoff 2. Trapping of sediment 3. Minimizing area and duration of soil exposure 4. Temporary materials such as hay bales, sandbags, plastic sheets, riprap or culverts to prevent the erosion of banks and beds of watercourses or drainage swales where runoff will be increased due to construction activities. B. Preserve natural vegetation to greatest extent possible. C. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize erosion. D. Comply with the City of Fort Collins' Storm Drainage Erosion Control Manual and Plan. C\DOCUME—I\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. -15 Drake/Ziegler Improvement Project Phase II 1.5 WATER CONTROL Date: December 27, 2006 A. A portion of the project work is located within a natural drainage course and is subject to periodic higher water levels due to rainfall runoff, snowmelt, flows from adjacent developed areas, storm water pipes and ground water flows from saturated soils or other ground water sources. The contractor is responsible for managing water within the construction site and protecting property. 1.6 PERMITS A. It shall be the responsibility of the Contractor to obtain Construction Dewatering Permits from the Colorado State Health Department for any dewatering operations that will discharge into any drainage ways, open channels or irrigation ditches. The Contractor shall be responsible for any testing required under the Construction Dewatering Permit. 1.7 SECURITY A. Contractor is responsible for protection of the site and all Work, materials, equipment and existing facilities thereon, against vandalism. B. No claim will be made against the Owner by reason of any act of an employee or trespasser, and the Contractor shall make good all damage resulting from his failure to provide security measures as specified. B. Security measures will be instituted to protect owners of existing facilities during normal operation, but will also include such additional security fencing, barricades, lighting, watchman services or other measures as Contractor feels is required to protect the site. END OF SECTION C:\DOCUME--1\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 16 DrakelZlegler Improvement Project Phase II SECTION 01570 TREE PROTECTION Date: December 27, 2006 A. Tree Barriers: All trees which will be preserved, but are within the limits of construction, must be protected from all damage associated with construction. A sturdy, physical barrier (fluorescent orange in color) must be fixed in place around each tree for the duration of construction. This barrier will be placed no closer than six (6) feet from the trunk, or one-half of the drip line, whichever is greater. The barrier itself must be fixed so it cannot be moved easily, but the material can be flexible, such as orange safety fence attached to metal T- posts driven into the ground, but must act as an effective deterrent to deliberate or accidental damage of each tree. The Project Engineer or Manager must approve actual materials and location of barrier. The movement or storage of equipment, material, debris, or fill within these required protective barriers is completely prohibited. In situations where the construction will come closer to a tree than six (6) feet, the orange barrier must still be erected. However, additional padding must be placed around the trunk of each tree starting at ground level and proceeding up the trunk to a height of six or seven feet. Padding should be a minimum eight (8) inches thick, and made of a material strong enough to protect the bark from accidental impacts with hand tools or power equipment. B. Accidental Poisoning: During the construction, the Contractor shall not cause, or permit the cleaning of equipment or material within the root zone of any tree. The Contractor shall not store or dispose of waste material including, but not limited to; paints, solvents, asphalt, concrete, mortar, or any other material harmful to the life of a tree, within the root zone of each tree, or group of trees. C. Root Pruning Specifications: When the cutting of tree roots is necessary, each final cut must be made as cleanly as possible for all roots over three (3) inches in diameter using the following method: The line of excavation will be drawn out and appropriate excavation equipment used to clear the area at least six inches in front of the actual finished excavation line. Roots can then be cut using tools such as axes, stump grinders, or trenchers. 2. Each root over three (3) inches in diameter will then be cut cleanly back to the excavation line using a stump grinder operated by an experienced licensed arborist. A sharp hand or bow saw is acceptable for roots under three (3) inches in diameter. Axes and trenchers do not cut roots cleanly and will not be used for final root cuts. D. Contractor shall coordinate with the Owners' Field Representative prior to and during the installation of tree protection and root pruning activities. Owners' Field Representative, at his/her opinion, will contact the City Forester and/or City Arborist for advice and approval of the tree protection measures taken by the Contractor and also the City's advice and approval during the root pruning activities. E. No damaging attachments, wires, signs, permits or other objects may be fastened by any means to any tree preserved on this project. C:\DOCUME-1\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 17 Drake/Ziegler Improvement Project Phase 11 Date: December 27, 2006 Violation of Suecitications and Penalties for Damaeing Trees: Any violation of these specifications will lead to penalties based on the type of violation and/or the resulting damages, and may be grounds for the termination of this contract. The penalties will be assessed based on the amount of damage done and the total value of that tree, or group of trees, prior to the damage. The minimum penalty will be $100.00. Penalties for any damage will be based on the total value of the tree as determined by the City Forestry Division staff and the severity of the damage as a proportion of the total value of that tree. This could include up to the full value of the tree. As an example, there are two American Elm trees to be preserved on another project. They are valued at $7,960 and $6,667 for the south and north trees respectively. The south tree is approximately 100 inches in circumference; therefore each inch is worth one -hundredth of the value, or $79.60 per inch. Similarly, the north tree is 91 inches in circumference, making each inch worth $73.26. To extend this to penalties paid, if one inch of the bark on the south tree is scuffed, the penalty would be $100 (the minimum allowed); if two inches are damaged, the penalty would be $159.20 and so on up to 50% of the circumference of the trunk. If 50% or more is damaged, the full value of the tree will be assessed as a penalty. (This example serves to illustrate how damages will be assessed). This method of assessing penalties will be applicable to all trees not marked for removal on the project, accidental poisoning and improper pruning. END OF SECTION C.\DOCUME-1\cpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 18 Drake/Ziegler Improvement Project Phase 11 SECTION 01580 TRAFFIC REGULATION 1.1 TRAFFIC CONTROL Date: December 27, 2006 A. The traffic control for this project shall be the responsibility of the Owner. Traffic control is defined as those devices necessary to channelize vehicular and pedestrian traffic through the project. The Contractor is responsible for applying their costs associated to their predicted calendar day schedule to determine the lump sum amount. B. The Contractor and/or Traffic Control Contractor must submit traffic control plans and coordinate all traffic control with the City's Traffic Control Coordinator. The traffic control plans must be submitted and approved 72 hours prior to starting construction and before making each modification. C. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Manual of Uniform Traffic Control Devices (U.S. Dept. of Transportation), or applicable statutory requirements of authority having jurisdiction. D. The traffic access/control plan limitations for handling traffic for these projects are described below. NOTE: A minimum of sir (6) specialty signs will be required to be installed at locations acceptable by the City of Fort Collins Traffic Operations Department throughout the project notifying the traveling public of the dates and location of the closure. Drake/Ziegler Improvement Project Phase II: Ziegler Road will be closed at Horsetooth Intersection down to the North entrance to Lafarge Northern Cement Plant. The Contractor will be required to barricade the Ziegler roadway with Jersey Barriers placed behind the stop sign on Ziegler north of the intersection. In addition, type III barricades must be placed at the end of the closures with a 48"x48" sign stating that the road is closed with start and finish dates. Environmental Drive: Environmental Drive will remain open from Drake Road for the soul purpose of maintaining access to the City of Fort Collins Waste Water Treatment Plant, Colorado State University Environmental Learning Center, and Lafarge Northern Asphalt, Gravel and Cement Plants. Pedestrian Access — Pedestrian traffic shall be allowed to use the sidewalk on the south side of Environmental drive for access to the City of Fort Collins Waste Water Treatment Plant, Colorado State University Environmental Learning Center and Lafarge Northern Asphalt, Gravel and Cement Plants. All other pedestrian traffic will be closed and pedestrians will be re-routed per plan. Bike Lanes — Bike lanes will be maintained on the South and North sides of Drake Road and Environmental Drive for the soul purpose of maintaining access to the City of Fort Collins Waste Water Treatment Plant, Colorado State University Environmental Learning Center and Lafarge Northern Asphalt, Gravel and Cement Plants. All other bike traffic will be closed and bicyclists will be re-routed per plan. Any modifications to the traffic control plan must be approved by the City's Traffic Control Coordinator and the Engineer. E. Vehicle, bike and pedestrian access to all side streets and private drives shall be maintained at all times. The Contractor will develop an access control plan in coordination with adjacent property owners, and submit it in conjunction with the traffic control plan to the Engineer for approval prior to the start of any C:\DOCUME—Ikpatters\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. -19 Drake/Ziegler Improvement Project Phase 11 Date: December 27, 2006 Work. Pedestrian and bicycle traffic shall be maintained along the West side of Lemay at all times, utilizing temporary sidewalks when necessary. F. The Contractor must work with the adjacent residents to provide and maintain sufficient access for them during the duration of the project. It will be the Contractors responsibility to coordinate and communicate with the residents during construction. G. The Contractor must maintain, at their cost, access to all businesses during their business hours. It will be the Contractors responsibility to coordinate and communicate with the businesses during construction. H. The Contractor shall keep traffic areas free of excavated material, construction equipment, pipe, and other materials and equipment. I. The Contractor shall keep fire hydrants and utility control valves free from obstruction and available for use at all times. J. The Contractor shall provide and maintain, at their cost, temporary driveway approaches on driveways open to traffic at all times to insure that the approaches are smooth, compacted, and will not prohibit or inhibit the use of the driveway. The driveway approaches must be maintained seven days a week. In the case of bad weather the Contractor must repair the driveways immediately following the storm and must work to maintain access during the storm. 1.2 WORK AREA SAFETY A. The Contractor shall maintain a safe work area and protect area residents, motorists, bicyclists, pedestrians, and children from work area hazards. B. The Contractor shall provide all work area safety control devices, such as barricades and safety fence around all excavations and drop-offs. C. Work area safety control devices will not be paid for separately. Cost for this equipment should be included in the lump sum cost for the work items which will require work area safety control devices. 1.3 PARKING A. Provide suitable parking areas for the use of all construction workers and others performing work or furnishing services in connection with the Project so as to avoid interference with public traffic, Owner's operations, or construction activities. END OF SECTION C:\DOCUME-1\cpattenc\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 20 Drake/Ziegler Improvement Project Phase ❑ SECTION 01700 CONTRACT CLOSEOUT 1.1 SUBSTANTIAL COMPLETION Date: December 27, 2006 A. Substantial Completion for the Drake/Ziegler Improvement Project Phase II (2007) shall be defined as the following: 1. All work pertaining to the Outfall Channel, Earthwork and Box Culvert is complete. 2. Traffic control devices are in their final positions. B. Substantial Completion must be met by within 75 working days from commencement of work. This information is outlined in Section 00520 - Agreement. 1.2 FINAL COMPLETION A. Final Completion shall be defined as the following: 1. Once substantial completion has been met, the Contractor will be allowed 10 working days to reach final completion. 2. This will include the completion of all Work including cleanup, Project Record Documents shall be turned over to the Owner, all punch list items completed, and all processing of all change orders. The Work must be ready for final payment and acceptance. B. Final Completion will be subject to the terms outlined in Section 00520 - Agreement. END OF SECTION C:\DOCUME-1\cpattem\LOCALS-1\Temp\Drake Ziegler General Specs.doc General Reqs. - 21 Drake/Ziegler Improvement Project Phase II Date: December 27, 2006 SECTION 01711 SITE CLEANUP 1.1 GENERAL A. Execute cleanup, during progress of the Work, and at completion of the Work. B. Adequate cleanup will be a condition for recommendation of progress payments. 1.2 DESCRIPTION A. Store volatile wastes in covered metal containers and dispose off site. B. Provide on -site covered containers for the collection of waste materials, debris and rubbish. C. Neatly store construction materials, such as concrete forms, when not in use. D. Broom clean adjacent paved surfaces and rake other adjacent surfaces. E. The streets adjacent to the construction area shall be cleaned of debris generated by the nroiect by the Contractor at the earliest opportunity, but in no case shall the street be left unclean after the completion of the day's work. It shall be the Contractor's responsibility to provide the necessary equipment and materials to satisfactorily clean the roadway at no additional cost to the nroiect. The City's Street Department will sweep the street at an approximate hourly rate of $90.00 for a minimum of 2 hours. The Contractor must sign a Contract with the City Street Department prior to requesting street sweeping. Construction "DRAG OUT" will not be tolerated. The Contractor must have the means to sweep, wash and scrape the roadway clear of any materials drug out by construction traffic on -site. The Contractor will monitor his construction traffic and clean as necessary or as directed by the on -site Project Engineer. If the streets are not cleaned by the Contractor within 24 hours after having been given notice from the Project Engineer, the Project Engineer will have the Streets Department sweep the streets at the rates listed above and will back charge the Contractor for expenses incurred. 1.3 DISPOSAL A. Wastes shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers, streams or waterways. B. Remove waste materials, clearing materials, demolition materials, unsuitable excavated materials, debris and rubbish from the site at least weekly and dispose of at disposal areas furnished by Contractor away from the site. END OF SECTION C:\DOCUME-1\cpatters\LOCALS—I\Temp\Drake Ziegler General Specs.doc General Reqs. - 22 Drake/Ziegler Improvement Project Phase 11 SECTION 01720 PROJECT RECORD DOCUMENTS 1.1 GENERAL A. Maintain at the site one record copy of: 1. Documents and samples called for in General Conditions 6.19. 2. Field Test Records. 3. Certificates of compliance. 1.2 MAINTENANCE OF DOCUMENTS AND SAMPLES Date: December 27, 2006 A. File documents and samples in accordance with the specifications section numbers. B. Maintain documents and samples in a clean, dry, legible condition and in good order. Do not use record documents for construction purposes. 1.3 RECORDING A. Label each document "PROJECT RECORD" in neat large printed letters. B. Record information concurrently with construction progress. 1. Do not cover Work until required information is recorded. C. Marking of Project Records. 1. Legible and with a dark pen or pencil. 2. Ink shall not be water based or subject to easy smearing. D. Mark Drawings to record actual construction. 1. Field dimensions, elevations, and details. 2. Changes made by a Modification. 3. Details not on original Drawings. 4. Horizontal and vertical locations of underground utilities and appurtenances referenced to a minimum of three permanent surface improvements. 5. Depths of various elements in relation to project datum. 6. Location of utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure. 1.4 SUBMISSION A. Accompany submittal with transmittal letter in duplicate containing: 1. Date. 2. Project title and number. 3. Contractor's names, address, and telephone number. 4. Index containing title and number of each Record Document. 5. Signature of Contractor or his authorized representative. END OF SECTION C:\DOCUME—I\cpatters\LOCALS--1\Temp\Drake Ziegler General Specs.doc General Reqs. - 23 on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of SUMS. 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and 12/03 Section 00100 Page 5 Drake/Ziegler Improvement Project Phase ❑ Date: December 26, 2006 DRAKE/ZIEGLER IMPROVEMENT PROJECT PHASE II The Colorado Division of Highways "Standard Specifications for Road and Bridge Construction" (2005), except as revised herein, is hereby adopted as a minimum standard of compliance for this project. The City of Fort Collins Storm Drainage Construction Standards, City of Fort Collins Water Utilities Standard Construction Specifications, City of Fort Collins Design Criteria and Standards for Streets, and City of Fort Collins Work Area Traffic Control Handbook, shall also serve as minimum standards of compliance for this project. They are not included in the contract documents, but may be obtained at the appropriate City Departments. It shall be the Contractor's responsibility to purchase and familiarize themselves with all of the City Department Specifications. These project specifications, City Department specifications, and CDOT standard specifications are considered minimum standards for compliance on this project. In those instances where the CDOT Standard Specifications conflict with the City specifications listed above, the City specifications shall govern. In those instances where the CDOT Standard Specifications conflict with any of the provisions of the preceding Sections 00001 through 01750, General Requirements, the preceding sections shall govern. PROJECT CONSTRUCTION SPECIFICATIONS INDEX OF REVISIONS SECTION PAGE 201 CLEARING AND GRUBBING. ........................................................... Technical Specs 2 202 REMOVALS....................................................................................Technical Specs 3-4 203 EXCAVATION AND EMBANKMENT ....................................................Technical Specs 5-7 206 EXCAVATION AND BACKFILL FOR STRUCTURES.................................Technical Specs 8-9 208 EROSION CONTROL...........................................................................Technical Specs 10 210 RESET STRUCTURES........................................................................Technical Specs 11-12 304 AGGREGATE BASE COURSE..............................................................Technical Specs 13 401 PLANT MIXES PAVEMENTS—GENERAL.............................................Technical Specs 14-21 403 HOT BITUMINOUS PAVEMENT...........................................................Technical Specs 22-24 506 RIPRAP..........................................................................................Technical Specs 25-26 601 STRUCTURAL CONCRETE..................................................................Technical Specs 27 603 CULVERTS AND SEWERS................................................................Technical Specs 28-29 604 MANHOLES, INLETS AND METER VAULTS............................................Technical Specs 30 608 SIDEWALKS AND DECORATIVE CROSSWALKS....................................Technical Specs 31 619 WATER LINES..................................................................................Technical Specs 32 U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 1 Drake/Ziegler Improvement Project Phase ❑ REVISION OF SECTION 201 CLEARING AND GRUBBING Section 201 of the Standard Specifications is hereby revised for this project as follows: Subsection 201.01 is revised to include the following: Date: December 26, 2006 This work shall consist of clearing, grubbing, removing, and disposing of vegetation and debris within the limits of the right of way, easement areas, borrow pits, and other areas shown in the Contract or required by the work. Vegetation and objects designated to remain shall be preserved free from injury or defacement. The Owner will designate all trees, shrubs, plants, and other objects to remain. Every object that is designated to remain and is damaged shall be repaired or replaced as directed, at the Contractors expense. Clearing and grubbing shall extend to the toe of the fill or the top of cut slopes, unless otherwise designated. All surface objects, trees, stumps, roots, fencing, and other protruding obstructions not designated to remain shall be cleared and grubbed, including mowing, as required. Undisturbed stumps, roots, and nonperishable solid objects located 2 feet or more below subgrade or embankment slope may remain in place. In areas to be rounded at the tops of back slopes, stumps shall be removed to at least 2 feet below the surface of the final slope. All cleared material or debris shall be disposed of outside of the project limits. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ) 201-01 Clearing and Grubbing— (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in the clearing and grubbing as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 2 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 202 REMOVALS Date: December 26, 2006 Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 is revised to include the following: The Contractor shall remove and dispose of all irrigation structures, pipe, structures, asphalt, curb and gutter, obstructions that are designated for removal by the Engineer. All such removals will be measured in the field, and quantities agreed to by the Contractor and the Engineer. Subsection 202.02 is revised to include the following: Disposal Site - Materials designated for removal shall become property of the Contractor, unless noted in the specifications or specified by the Engineer to be salvaged or stockpiled. It shall be the Contractor's responsibility to obtain disposal sites for all unusable material, which is removed. Subsection 202.03 is revised to include the following: Prior to removal, concrete and/or asphalt shall be saw cut full depth to a clean and straight vertical line. Pieces of concrete which, due to the Contractor's operations, crack or break beyond the limits of construction shalt be saw cut, or removed to the nearest joint, and removed and replaced at the Contractor's expense. The limit of the repair will be determined by the Engineer. The initial saw cutting to remove existing concrete and/or asphalt shall be considered incidental to the Work and shall not be paid for separately under this item. Removal of concrete, asphalt and/or obstructions as described in section 202.01 beyond the limits designated by the Engineer will be the responsibility of the Contractor and will not be paid for under this section. Subsection 202.04 is revised to include the following: Rotomill Asphalt Pavement (2.5" Depth)— This work requires profile milling of existing asphalt pavement. This work shall include hauling this material by truck from the milling operation. Material from this operation shall become the property of the Contractor unless noted in the specifications or specified by the Engineer to be salvaged or stockpiled. Subsection 202.05 is revised to include the following: Rotomill Asphalt Pavement (5"-10" Depth) —This work requires full depth milling of the existing asphalt on Ziegler Road from Station 95+50 north to just past the bridge on Ziegler. This work shall include hauling this material by truck from the milling operation. Materials from this operation shall become the property of the Contractor unless noted in the specifications or specified by the Engineer to be salvaged or stockpiled. Subsection 202.07 is revised to include the following: Remove 60X50 Existing Structure. This work shall consist of the removal of the existing timber bridge on Ziegler Road at the FICRD Ditch. Contractor will be given a full closure at the bridge in order to remove said structure in a timely and orderly fashion. The Contractor and the Engineer shall field measure and agree upon the quantity to be removed before the work commences. Should the Contractor fail to request the Engineer to measure any work, the Contractor shall not be compensated for materials that were not measured by the Engineer. The accepted quantities will be paid for at the contract unit price. Saw cutting, excavation, backfill, haul, disposal, and stockpiling of materials will not be measured and paid for separately. This cost shall be included in the unit price for each bid item in Section 202. U:\Dmke/Ziegler Improvement Project Phase Iffechnical Specifications Technical Specs - 3 Drake/Ziegler Improvement Project Phase 11 Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 202-01 Remove Pipe (RCP, CMP, PVC) — (LF) 202-02 Remove Vertical Curb and Gutter — (LF) 202-03 Remove Sidewalk— (LF) 202-04 Remove Asphalt Pavement (5"-10" Depth) — (SY) 202-05 Remove 25X30 Existing Structure — (LS) 202-06 Remove Air Vac Manhole and Valve — (EA) 202-07 Remove Stoneridge Spillway Per Plan Sheets 9 of 74 — (LS) 202-08 Remove Culvert — (LF) 202-09 Remove Irrigation Structure — (EA) 202-10 Abandon 6" Water (Station 96+50 Per Plan) — (LS) 202-11 Flow Fill Abandoned 6" Water Line — (LS) 202-12 Saw Cut Existing Asphalt — LF) 202-13 Remove Existing FCLWD Meter Pit and Meter— (LS) 202-14 Remove Existing Concrete Headwalls — (EA) Date: December 26, 2006 The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in removals and rotomilling, including excavation, backfill, haul and disposal, as specified in these specifications, and as directed by the Engineer. All saw cutting involved in removing the necessary items in order to complete the Work shall be considered incidental to the Work and will not be paid for separately. END OF SECTION U:\Drake/Ziegler Improvement Project Phase Il\Technical Specifications Technical Specs - 4 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 203 EXCAVATION AND EMBANKMENT Section 203 of the Standard Specifications is hereby revised as follows: Subsection 203.01 is revised to include the following: Date: December 26, 2006 Unclassified Excavation - This shall consist of excavation of all materials on the site to final grades, excluding the bid items listed in Section 202. Excavation of unsuitable material will only be paid for if it is found to be unsuitable in its original state. This item shall be measured from the plans and cross sections, and will be paid for by the cubic yard. This item shall be paid according to plan quantity. Embankment (Complete in Place) - All excavated material, except the material being hauled and disposed, shall be placed as embankment and compacted, to final grades, as specified in Section 203.07. The embankment quantity was not adjusted to allow for shrinkage during compaction. This item will be paid according to plan quantity by the cubic yard. Topsoil - (stripping, stockpiling, placing) - All areas that have suitable topsoil material shall be stripped to a depth of 6 inches. This material shall be stockpiled and placed after the final grades have been established. This item shall include stripping existing vegetation, temporarily stockpiling, loading, hauling, and placing topsoil material for back of walk and curb areas, parkway areas, and other designated areas. This item shall be paid according to plan quantity. Borrow Suitable Fill Material - This shall include supplying, placing, and compacting of a suitable fill material as directed by the Engineer. This item will be measured in the field and paid for by the ton. This item will not be paid for as Embankment. Borrow material will only be used for fill if there is a shortage of suitable material onsite and/or as directed by the Engineer. Muck Excavation (Complete in Place)— This shall include excavation of unsuitable material , supplying and placing Class I or 2 Structural Backfill, Pit Run or an approved fill, re -compacting material to finish grade, and haul and disposal of unsuitable material. Muck Excavation of material from rain or weather damage will not be paid for and is entirely the Contractor's responsibility. This item shall be measured in the field, and will be paid for by the cubic yard. Borrow ABC (Class 5 or 6) — This work shall consist of placing aggregate base course material at the realigned FCRID ditch rider's road, as well as behind all asphalt driveways to transition from new asphalt to existing grade. Potholing— The Contractor shall be responsible for locating electrical, gas, fiber optic, cable, telephone, traffic signal conduit and other existing utility lines and shall be performed every 100 lineal feet or as deemed necessary by the contractor. All related work, including excavation, backfilling, shoring, labor and number of hours will not be measured and paid for separately, but shall be included in the work. Repair of damaged existing utility lines caused by the Contractor will be at the Contractor's expense. Potholing will be paid as a lump sum item. Embankment and subgrade material shall be compacted to 95% of maximum density at +/- 2% optimum moisture. Maximum density shall be determined by ASTM D 698. This will apply under the roadway, curb and gutter, sidewalk, and driveways. Topsoil shall be compacted to 85% of maximum density at/or near optimum moisture. Excavation and Embankment will only be paid when a significant change in grade is required, as determined by the Engineer. Minor cuts and fills shall be considered incidental to the work, and shall not be paid separately under this section. If unsuitable subgrade is encountered and the Engineer directs the Contractor to over excavate the material, the Contractor shall use Aggregate Base Courses (Class 5 or 6), Class 1 or 2 Structural Backfill, Pit Run or an approved fill to backfill the over excavated area if there is not any acceptable material onsite. This Work will be paid for separately under the Muck Excavation item. The proposed material shall meet the following minimum requirements: LL Maximum: 30 PI Maximum: 6 "R' Value Minimum: 78 UADrake/Ziegler Improvement Project Phase Iffechnical Specifications Technical Specs - 5 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 The minimum strength coefficient of the Aggregate Base Coarse shall be 0.11. After specified compaction has been obtained, the subgrade under the curb, gutter, sidewalk, and pavement shall be proof -rolled with a heavily loaded rubber tired roller, fully loaded water truck, or approved equal. Those areas which produce a rut depth of over one-half (1/2) inch or which crack the subgrade after pumping and rebounding shall be ripped, scarified, wetted or dried if necessary, and recompacted to the requirements for density and moisture at the Contractor's expense. Where unsuitable material is encountered, the Engineer may require the Contractor to remove the unsuitable materials and backfill to the finished grade with approved material. The completed subgrade shall be proof -rolled again after placement of approved material. This will be paid for at the contract unit price for Muck Excavation. The Contractor shall refer to the plans for regrading information. This work shall include all excavation, embankment, and grading required to prepare these sites for landscaping. Subsection 203.04 is revised to include the following: The excavations and embankments shall be finished to smooth and uniform surfaces conforming to the typical sections specified. Variation from the subgrade plan elevations specified shall not be more than 0.08 feet. Subsection 203.13 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 203-01 Unclassified Excavation — Roadway - (CY) 203-02 Unclassified Excavation (Outfall Channel) — (CY) 203-03 Unclassified Excavation (FICRD Channel) — (CY) 203-04 Haul — Outfall Channel Excess Material — (CY) 203-05 Embankment — (CIP) — Roadway - (CY) 203-06 Embankment — (CIP) — Outfall Channel - (CY) 203-07 Embankment — (CIP) — FICRD Channel — (CY) 203-08 Import Fill — (CY) 203-09 Topsoil — (Stripping, Stockpiling and Placing) — 6" Depth — Roadway — (CY) 203-10 Topsoil — (Stripping, Stockpiling and Placing) — 6" Depth — Outfall Channel — (CY) 203-11 Topsoil — (Stripping, Stockpiling and Placing) — 6" Depth — FICRD Channel — (CY) 203-12 Muck Excavation — Outfall Channel — (CY) 203-13 Muck Excavation — FICRD Channel — (CY) 203-14 Potholing —(LS) 203-15 Flow Fill Section Over Shallow Utilities— (LF) U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 6 Drake/Ziegler Improvement Project Phase ❑ Date: December 26, 2006 203-16 Borrow ABC (Class 5 or 6) — (CIP) — (TON) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in Unclassified Excavation, Embankment, Haul & Dispose, Topsoil (stripping, stockpiling, placing), Muck Excavation, Borrow ABC and Median Hardscape Shaping, including without limitation, haul, stockpiling, placing of material, watering or drying soil, compaction, proof rolling, finish grading, and disposal of unusable materials, as shown on the plans and as specified in these specifications, and as directed by the Engineer. END OF SECTION REVISION OF SECTION 206 U:\Drake/Ziegler Improvement Project Phase 11\Technical Specifications Technical Specs - 7 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 EXCAVATION AND BACKFILL FOR STRUCTURES Section 206 of the Standard Specifications is hereby revised as follows: Subsection 206.01 is revised to include the following Structure Excavation — It is anticipated that unsuitable soils will be encountered for the abutment walls for the Foothills Channel Box Culvert. The excavation of the unsuitable material has already been accounted for and will be paid for under Structure Muck Excavation. The Contractor is cautioned that construction equipment may cause the natural soils to pump or deform while performing excavation work inside and on footings, structural floor slabs, or other structure foundation areas. Foundation materials which are: a) saturated by either surface or dewatering work by the Contractor; b) frozen for any reason; or, c) that are disturbed by the Contractor's work or caused to become unacceptable for foundation material purposes by means of the Contractor's equipment, manpower, or method of work shall be removed and replaced by the Contractor at his expense. . Care should be taken when excavating the foundations to avoid disturbing the supporting materials. Excavation by either hand or careful backhoe operation may be required to achieve the subgrade depth of the last few inches of any item of the concrete work. Any over -excavated subgrades that are due to the Contractor's actions shall be brought back to subgrade elevations by the Contractor and at his expense in the following manner: 1. For over -excavations of 2 inches or less, either: Backfill and compact with an approved granular materials; backfill with inch washed crushed rock; or fill within concrete at the time of the appurtenant structure concrete pour. 2. For over -excavations greater than 2 inches, backfill and compact with 1 '/2 inch washed crushed rock. Borrow Structure Backfill (R-Value >25) — Backfill, and fill within 2 feet of and adjacent to all structures and for full height of the wall, shall be selected non -swelling material. It shall be granular, well graded, and free from stones larger than 3 inches. Material may be job excavated, but selectivity will be required as determined by the Engineer. Refer to the Plans for job specific requirements. Stockpiled material, other than topsoil from the excavation shall be used for backfilling unless an impervious structural backfill is specified. The backfill material shall consist of either clean on -site granular materials free from stones larger than 3 inches in diameter with no more than 20%passing theNo. 200 sieve, or equivalent imported materials. All backfill around the structures shall be consolidated by mechanical tamping. The material shall be placed in 8-inch loose lifts within range of 2% above to 2% below the optimum moisture content and compacted to 95% of Maximum Standard Proctor Density (ASTM D698) for cohesive soils, or to 70% relative density for pervious material as determined by the relative density of cohesion less soils, ASTM D4253. Structure Backfill Flow Fill — Backfill flow fill will be required around the foundation and up to a height of 2' above the foundation. This item will be paid for by the Cubic Yard. Dewatering — It is anticipated that the project will require three separate dewatering processes. One at the FCRID realignment, one at the Outfall Channel Siphon and Underdrain crossing, one at the Cottonwood Box Culvert. This item shall include pumps, labor, equipment and any associated costs to insure a dry work area. Also, a discharge pipe is to be installed and removed to provide access for construction equipment. It will be the responsibility of the contractor to obtain Dewatering Permits from the Colorado State Health Department. These combined items will be paid for as an Each price. Haul and Dispose— This shall consist of hauling and disposing of any excess material or unsuitable fill material on site. This item will be measured from the plans and cross sections and will be paid for by the Cubic Yard. This item shall be paid according to plan quantity. UADmke/Ziegler Improvement Project Phase 11\Technical Specifications Technical Specs - 8 Drake/Ziegler Improvement Project Phase [I Date: December 26, 2006 Structure Muck Excavation — Unsuitable material encountered within the area of excavation for the structure shall be removed to a depth directed by the Engineer. All unsuitable material shall be disposed of as directed. Muck -excavation of material from rain or weather damage will not be paid for and is entirely the Contractor's responsibility. This item shall be measured in the field, and will be paid for by the Cubic Yard. Subsection 206.07 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by O. 206-01 Structure Excavations — (CY) 206-02 Borrow Structure Backfill (R-Value >25) — (CY) 206-03 Structure Backfill Flow Fill — (CY) 206-04 Filter Material (1 ''/z" Washed Rock) — (TON) 206-05 Structure Haul and Dispose (On -Site) — (CY) 206-06 Structure Muck Excavation — (CY) 206-07 Dewatering — (EA) END OF SECTION U:\Drake/Ziegler Improvement Project Phase ll\Technical Specifications Technical Specs - 9 Drake/Ziegler Improvement Project Phase It SECTION 208 EROSION CONTROL Section 208 of the Standard Specifications is hereby revised as follows: Subsection 208.01 is revised to include the following: Date: December 26, 2006 All Erosion Control Devices, Materials, and Techniques required to prevent damage to the storm water facilities as outlined in the City of Fort Collins Standards will be considered incidental to the work, and shall be included in the price. No measurement for payment shall be made for maintenance of Erosion Control devices. This item will be paid for as a lump sum price to the Contractor. Working in or Crossing Watercourses and Wetlands — Construction vehicles should be kept out of watercourses to the extent possible. Where in channel- work is necessary, precautions must be taken to stabilize the work area during construction to minimize erosion control. The channel (including bed and banks) must always be re -stabilized immediately after in -channel work is completed. Where a live (wet) watercourse must be crossed by construction vehicles during construction, a Temporary Stream Crossing must be provided for this purpose. Soil Retention Blanket (straw/coconut) shall be a machine produced mat consisting of 70 percent agricultural straw and 30 percent coconut fiber. The blanket shall be of consistent thickness with the straw and coconut fiber evenly distributed over the entire area of the mat. The blanket shall be covered on the top and bottom with 100% biodegradable natural organic fiber netting. Subsection 208.07 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 208-01 Erosion Control — (LS) 208-02 Wattles—(LF) 208-03 Slope Coco Mat with Seed— (SF) 208-04 Straw Bale Slope Protection — (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in installing and maintaining erosion control, complete -in -place, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:lDrake/Ziegler Improvement Project Phase I ffechnical. Specifications Technical Specs - 10 date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non -responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures 12/03 Section 00100 Page 6 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 210 RESET STRUCTURES Section 210 of the Standard Specifications is hereby revised as follows: Subsection 210.01 is revised to include the following: Date: December 26, 2006 Work contained in this Subsection shall meet the requirements of the current City of Fort Collins Specifications or other applicable water utility agency standard construction specifications. The Contractor shall cooperate and coordinate with the City of Fort Collins or other applicable water utility when shutting off water to minimize downtime to customers. The Contractor shall also coordinate work involving the relocation of fire hydrants, water meters, curb stops, and water valves, and lowering water and sewer service lines, and water lines. The Contractor shall supply all materials required to complete the work that is not supplied by the City or other applicable water utility, and these materials shall be included in the costs of each item. This shall include, but not be limited to; new copper line and fittings, new stop boxes, meter pits, excavation, backfill and compaction. New copper fittings, stop boxes, and meter pits will be required at each location. All structures located in bituminous pavements to be surfaced shall be adjusted prior to, or during paving operations. All structures located within a concrete pavement shall be adjusted prior to opening the roadway. The Contractor shall perform all work needed to ensure that said structures can be readily adjusted and shall have all necessary materials on hand prior to commencing the work. The adjustments shall be made as noted below. All structures shall be adjusted to be V4", +/- 1/8" below the pavement surface. The Contractor shall be responsible for immediately cleaning out all construction materials that may fall into manholes, valve boxes, or other structures during the construction process. In the event that a structure was not property adjusted (i.e. too high or too low) or the structure was covered and not adjusted after the paving operation, written notice will be given by the Engineer to the Contractor requiring the Contractor to make the necessary adjustments within 5 working days. In the event that the structure is not adjusted within said time frame; the Engineer shall have the right to engage a third party to complete the work, and to withhold the cost of such work from payments due the Contractor. If a structure is adjusted prior to an overlay operation, the Contractor shall place bituminous base material around the structure as directed by the Engineer to insure that it will not be a hazard to vehicular traffic. This will be paid for under the bid item for Asphalt Patching. Adjust Valve Box (COFC Water Dept.)— Valve boxes located within asphalt pavement shall be adjusted by removing the existing pavement around the valve box, adjusting the valve by turning it to the proper grade, trimming the existing asphalt by cutting vertical edges, then spreading and mechanically compacting bituminous material of the same grade and quality as the adjacent pavement. If a valve box cannot be turned up, or can be turned up, but not sufficiently to achieve the proper grade or if the top section of the valve box is in poor condition, the Contractor shall excavate around the top section of the valve box and remove and replace the top section with a longer section supplied by the Contractor. The excavation shall then be back filled with Non -Shrink backfrll to the top of subgrade, and then, material of the same grade and quality as the adjacent pavement shall be placed. I1:\Drake/Ziegler Improvement Project Phase Il\Technical Specifications Technical Specs - 11 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 The Contractor shall exercise reasonable care while attempting to adjust the valve boxes. If, in the opinion of the Engineer, the Contractor is negligent and breaks the valve box, the valve box shall be replaced at the Contractor's expense. This item will be paid under Adjust Valve Box — (EA). Adjust Manhole Ring/Cover — Manholes located within existing asphalt pavement shall be adjusted by removing an area of pavement with a minimum diameter one foot (l') larger than the structure (centered on the structure). This shall be done by cutting vertical edges, adjusting the manhole by grouting concrete rings and/or utilizing metal shims to raise the structure to the proper grade, then spreading and mechanically compacting bituminous material of the same grade and quality as the adjacent pavement. When the manhole adjustment is complete, the slope of the top surface of the manhole cover shall match the slope of the pavement in both the longitudinal and traverse directions. Any manhole cover which is unstable or noisy under traffic shall be replaced. This item will be paid under Adjust Manhole Ring/Cover — (EA). Traffic Signs - Prior to commencement of any construction that will affect traffic signs of any type, the Contractor shall contact the City of Fort Collins Streets Division and the City Project Inspector for removal of the signs. The COFC Streets Division will remove these signs and reset all traffic signs upon project completion. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by ( ). 210-01 Modify Manhole— (EA) 210-02 Relocate Existing Headgate — (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the Work involved in adjusting structures, complete -in -place, including non -shrink backfill, concrete, metal shims, bituminous materials, haul and disposal, excavation, bedding material, backfill, and compaction as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 12 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 304 AGGREGATE BASE COURSE Section 304 of the Standard Specifications is revised as follows: Date: December 26, 2006 Subsection 304.01 is revised to include the following: This work shall consist of placing Aggregate Base Course (Class 5 or 6) over previously prepared pavement subgrade approved by the Engineer. Aggregate Base Course will be used under the asphalt pavement section and shall meet the requirements of Subsection 703.03. Subsection 304-03 is revised to include the following: Gravel Access Road— 6" — (CIP) — This work shall consist of placing 6" Thick Aggregate Base Course material along the Outfall Channel Swale for maintenance access from the beginning of the channel all the way to the Poudre River. The proposed material shall meet the following minimum requirements: LL Maximum: 30 PI Maximum: 6 "R" Value Minimum: 78 The minimum strength coefficient of the Class 5 or 6 Aggregate Base Course shall be 0.11 Subsection 304.06 is revised to include the following: Aggregate Base Course shall be compacted to at least 95% of maximum density at or near optimum moisture as determined by ASTM D698, Subsection 304.07 is revised to include the following: Aggregate Base Course will be measured by the ton at proper moisture. Quantity will be adjusted accordingly if the moisture content is too high. Haul and water necessary to bring mixture to optimum moisture will not be measured or paid for separately, but shall be included in the price for Aggregate Base Course. Soil sterilization shall be applied under all new asphalt pavin¢ and shall be considered incidental to the work. Sterilization shall not be paid for separately under this item. Subsection 304.08 is revised to include the following: The accepted quantities of Aggregate Base Course will be paid for at the contract unit price per ton. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 304-01 Gravel Access Road — 6" — (CIP) — (TON) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in Aggregate Base Course including haul, sterilization, and water. The work will be complete -in -place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION UADrake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 13 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 REVISION OF SECTION 401 & 703 PLANT MIX PAVEMENTS — GENERAL & AGGREGATES Section 401 and 703 of the Standard Specifications is hereby revised as follows: Subsection 401.02 is hereby revised to include the following: Requests made in writing by the Contractor for changes in the job mix formula will be considered by the Engineer. A job mix formula shall be determined by the Contractor and submitted to the Engineer for approval a minimum of one week prior to the beginning of construction for each proposed change. The Contractor shall provide the Engineer with an asphalt mix design report from an independent testing laboratory acceptable to the Engineer. The report shall state the Mix properties, optimum oil content, job mix formula and recommended mixing and placing temperatures. The costs for all job mix formulas shall be the responsibility of the Contractor. If the Contractor uses more than three (3) job mix formulas for a type of plant mix pavement used, the City may charge the Contractor for testing and evaluation of the mix designs, including the costs for calibration of a Nuclear Asphalt Oven. For Superpave Mixes, delete Table 401-2 and replace with the following: TABLE 401-2 Grading Test Procedure Minimum Test Sampling Frequency Result All Gradings CP L-5109 Method B 80 One per 10, 000 metric tons (10,000 tons) or fraction thereof minimum In subsection 401.02, delete the second, third, and fourth paragraphs and replace with the following: 1. A proposed plant mix pavement mix design prepared in accordance with Colorado Procedure 52(CP52-99), including a proposedjob-mix gradation for each mixture required by the Contract which shall be wholly within the Master Range Table, Tables 703-3A, B, and C, before the tolerances shown in Table 401-1 are applied. The weight of lime shall be included in the total weight of the material passing the 75 mm (No. 200) sieve. The restricted zone boundaries shown for all gradings in Tables 703-3A, 703-3B, and 703-3C are to be used as guidelines in mix design development. However, the job -mix gradation is not required to pass above or below the restricted zone boundaries. 2. The name of the refinery supplying the asphalt cement and the source of the anti -stripping additive. 3. A sufficient quantity of each aggregate for the Department to perform the tests specified in section 2.2.1 of CP52. In subsection 401.02 delete Table 401-1, including the footnotes, and replace with the following: TABLE 401-1Bitumen Content t0.3%o Asphalt Recycling Agent t0.2% Temperature of Mixture When Discharged from Mixer t10°C 'Hot Bituminous Pavement - Item 403 assing the 9.5 mm (3/81) and larger sieves f6% Passing the the 4.75 mm (No. 4) and 2.36 mm (No. 8) sieves t5% assing the 600 mm (#30) sieve t4% Passin the 75 mm #200 sieve t2% 'When 100% passing is designated, there shall be no tolerance. When 90-100% passing is designated, U1Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 14 Drake/Ziegler Improvement Project Phase It 90shall be the minimum; no tolerance shall be used. Delete Subsection 401.07 and replace with the following: Date: December 26, 2006 Plant mix pavement shall be placed only on properly prepared unfrozen surfaces which are free of water, snow, and ice. The plant mix pavement shall be placed only when both the air and surface temperatures equal or exceed the temperatures specified in Table 401-3 and the Engineer determines that the weather conditions permit the pavement to be properly placed and compacted. Table 401-3 Placement Temperature Limitations in °C Compacted Layer Minimum Surface and Air Thickness in Temperature °C (°F) min (inches) Top Layers Below Layer Top Layer <38 (1'/2) 15 (60) 10 (50) 38 (1'/2) - <75 (3) 10 (50) 5 (40) 75 3 or more 7 45 2 35 Note: Air temperature is taken in the shade. Surface is defined as the existing base on which the new pavement is to be placed. If the temperature falls below the minimum air or surface temperatures, paving shall stop. The Contractor shall schedule the work so that no planed or recycled surface is left without resurfacing for more than 10 calendar days during the period specified in Table 401-3A, below. The Contractor shall immediately place a temporary hot bituminous pavement layer on any surface that has been planed or recycled and can not be resurfaced in accordance with the above temperature requirements within 10 calendar days after being planed or recycled. The minimum thickness of the temporary hot bituminous pavement layer shall be 50 mm (2 inches). The Contractor shall perform the quality control required to assure adequate quality of the hot bituminous pavement used in the temporary layer. All applicable pavement markings shall be applied to the temporary layer surface. The Contractor shall maintain the temporary layer for the entire period that it is open to traffic. Distress which affects the ride, safety, or serviceability of the temporary layer shall be immediately corrected to the satisfaction of the Engineer. The temporary hot bituminous pavement layer shall be removed when work resumes. Table No. 401-3A Periods Reauirina Overlav of Treated Surfaces Location by Elevation Period During Which Planed or Recycled Surfaces Must be Overlaid within Ten Days All areas below and including 2100 m October 1 to March 1 7000 feet All areas above 2100 in (7000 feet) up to September 5 to April 1 and including 2600 in 8500 feet All areas above 2600 in (8500 feet) August 20 to May 15 In Subsection 401.15, delete the third and fourth paragraphs (including table) and replace with the following The minimum temperature of the mixture when discharged from the mixer and when delivered for use shall be as shown in the following table: U:\Drake/Ziegler Improvement Project Phase Il\Technical Specifications Technical Specs - 15 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 Asphalt Grade Minimum Mix Discharge Temperature, °C °F * Minimum Delivered Mix Temperature, °C °F ** PG 58-28 135 (275) 113 (235) PG 58-22 138 (280) 113 (235) PG 64-22 143 (290) 113 (235) AC-20 Rubberized 160 (320) 138 (280) PG 76-28 160 (320) 138 (280) PG 70-29 149 (300) 138 (280) PG 64-28 149 (300) 138 (280) PG 58-34 149 (300) 138 (280) * The maximum mix discharge temperature shall not exceed the minimum discharge temperature by more than 17°C (30 (°F) . ** Delivered mix temperature shall be measured behind the paver screed. Hot -mix asphalt mixture shall be produced at the lowest temperature within the specified temperature range that produces a workable mix and provides for uniform coating of aggregates (95% minimum in accordance with AASHTO T 195), and that allows the required compaction to be achieved. Subsection 401.16 is hereby revised to include the following: The mixture shall be laid upon an approved surface, spread and struck off to provide for drainage to the side(s) of the roadway with a minimum cross slope of two percent (2%) or as directed by the Engineer. In subsection 401.17, first paragraph, delete the last two (2) sentence and replace with the following: When the mixture contains unmodified asphalt cement (PG 58-28, PG 58-22, or PG 64-22) or modified (PG 58-34), and the surface temperature falls below 85°C (185 °F), no further compaction effort will be permitted unless approved. If the mixture contains modified asphalt cement (AC-20R, PG 76-28, PG 70-28, or PG 64-28) and the surface temperature falls below 110°C (230 °F), no further compaction effort will be permitted unless approved. Subsection 401.17 is hereby revised to include the following: All pneumatic tire rubbers shall be equipped with rubber skirts. In subsection 703.04 delete Table 703-3 and replace with Tables 703-3A, B, and C as follows: The minimum temperature of the mixture when discharged from the mixer and when delivered for use shall be as shown in the following table: U:\Drake/Ziegler Improvement Project Phase 11\Technical Specifications Technical Specs - 16 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 Asphalt Grade Minimum Mix Discharge Tern erature, °C (OF)* Minimum Delivered Mix Temperature, °C °F ** PG 58-28 135 (275) 113 (235) PG 58-22 138 (280) 113 (235) PG 64-22 143 (290) 113 (235) AC-20 Rubberized 160 (320) 138 (280) PG 76-28 160 (320) 138 (280) PG 70-28 149 (300) 138 (280) PG 64-28 149 (300) 138 (280) PG 58-34 149 (300) 138 (280) * The maximum mix discharge temperature shall not exceed the minimum discharge temperature by more than 17°C (30 (°F) . ** Delivered mix temperature shall be measured behind the paver screed. Hot -mix asphalt mixture shall be produced at the lowest temperature within the specified temperature range that produces a workable mix and provides for uniform coating of aggregates (95% minimum in accordance with AASHTO T 195), and that allows the required compaction to be achieved. Subsection 401.16 is hereby revised to include the following: The mixture shall be laid upon an approved surface, spread and struck off to provide for drainage to the side(s) of the roadway with a minimum cross slope of two percent (2%) or as directed by the Engineer. In subsection 401.17, first paragraph, delete the last two (2) sentence and replace with the following: When the mixture contains unmodified asphalt cement (PG 58-28, PG 58-22, or PG 64-22) or modified (PG 58-34), and the surface temperature falls below 85°C (185 °F), no further compaction effort will be permitted unless approved. If the mixture contains modified asphalt cement (AC-20R, PG 76-28, PG 70-28, or PG 64-28) and the surface temperature falls below I ]0°C (230 °F), no further compaction effort will be permitted unless approved. Subsection 401.17 is hereby revised to include the following: All pneumatic tire rubbers shall be equipped with rubber skirts. In subsection 703.04 delete Table 703-3 and replace with Tables 703-3A, B, and C as follows: U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 17 Drake/Ziegler Improvement Project Phase If Date: December 26, 2006 The minimum temperature of the mixture when discharged from the mixer and when delivered for use shall be as shown in the following table: Asphalt Grade Minimum Mix Discharge Temperature, °C °F * Minimum Delivered Mix Temperature, °C °F ** PG 58-28 135 (275) 113 (235) PG 58-22 138 (280) 113 (235) PG 64-22 143 (290) 113 (235) AC-20 Rubberized 160 (320) 138 (280) PG 76-28 160 (320) 138 (280) PG 70-28 149 (300) 138 (280) PG 64-28 149 (300) 138 (280) PG 58-34 149 (300) 138 (280) * The maximum mix discharge temperature shall not exceed the minimum discharge temperature by more than 17°C (30 (17). ** Delivered mix temperature shall be measured behind the paver screed. Hot -mix asphalt mixture shall be produced at the lowest temperature within the specified temperature range that produces a workable mix and provides for uniform coating of aggregates (95% minimum in accordance with AASHTO T 195), and that allows the required compaction to be achieved. Subsection 401.16 is hereby revised to include the following: The mixture shall be laid upon an approved surface, spread and struck off to provide for drainage to the side(s) of the roadway with a minimum cross slope of two percent (2%) or as directed by the Engineer. In subsection 401.17, first paragraph, delete the last two (2) sentence and replace with the following: When the mixture contains unmodified asphalt cement (PG 58-28, PG 58-22, or PG 64-22) or modified (PG 58-34), and the surface temperature falls below 85°C (185 °F), no further compaction effort will be permitted unless approved. If the mixture contains modified asphalt cement (AC-20R, PG 76-28, PG 70-28, or PG 64-28) and the surface temperature falls below 110°C (230 °F), no further compaction effort will be permitted unless approved. Subsection 401.17 is hereby revised to include the following: All pneumatic tire rubbers shall be equipped with rubber skirts. In subsection 703.04 delete Table 703-3 and replace with Tables 703-3A, B, and C as follows: UADrake/Ziegler Improvement Project Phase IRTechnical Specifications Technical Specs - 18 Drake/Ziegler Improvement Project Phase It Date; December 26, 2006 TABLE 703-3A Master Range Table for Hot Bituminous Pavement (Grading S) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (11/2") 25.0 mm (1") 100 19.0 mm ('/<") 90 - 100 12.5 mm ('/2") 9.5 mm (/8") 4.75 mm (#4) 2.36 mm (#8) 23 — 49 34.6 34.6 1.18 mm (#16) 22.3 28.3 600 mm (#30) * 16.7 20.7 300 mm (#50) 13.7 13.7 150 mm (#100) 75 mm (#200) 2-8 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. UADrake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 19 Drake/Ziegler Improvement Project Phase 11 Date: December 26, 2006 TABLE 703-3B Master Range Table for Hot Bituminous Pavement (Grading SX) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (11/2") 25.0 mm (1") 19.0 mm (/") 100 12.5 mm (Yx") 90 - 100 9.5 mm (/s..) 4.75 mm (#4) 2.36 mm (#8) 28 — 58 39.1 39.1 1.18 mm (#16) 25.6 31.6 600 mm (#30) * 19.1 23.1 300 mm (#50) 15.5 15.5 150 mm (#100) 75 mm (#200) 2 - 10 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. TABLE 703-3C U:\Drake/Ziegler Improvement Project Phase II\Technical Specifications Technical Specs - 20 and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents 12/03 Section 00100 Page 7 Drake/Ziegler Improvement Project Phase If Date: December 26, 2006 Master Range Table for Hot Bituminous Pavement (Grading SG) Sieve Size Percent by Weight Passing Square Mesh Sieves Restricted Zone Boundary (Guideline) Minimum Maximum 37.5 mm (1'/2") 100 25.0 into (1") 90 - 100 19.0 mm ('/<") 12.5 mm ('/Z") 9.5 mm (/o 4.75 mm (#4) * 39.5 39.5 2.36 mm (#8) 19 — 45 26.8 30.8 1.18 mm (#16) 18.1 24.1 600 mm (#30) * 13.6 17.6 300 mm (#50) 11.4 11.4 150 mm (#100) 75 mm (#200) 1-7 * These additional Form 43 Specification Screens will initially be established using values from the As Used Gradation shown on the Design Mix. END OF SECTION U:\Drake/Ziegler Improvement Project Phase I Technical Specifications Technical Specs - 21 DraWZiegler Improvement Project Phase It REVISION OF SECTION 403 HOT BITUMINOUS PAVEMENT Section 403 of the Standard Specifications is hereby revised as follows: Subsection 403.01 is revised to include the following: Date: December 26, 2006 Asphalt Patchine — HBP Grading SG shall be used in locations as directed by the Engineer. These quantities will be restricted to small areas which require hand placement methods and conventional paving equipment cannot be utilized. Hot Bituminous Pavement —This shall consist of constructing one or more courses of HBP Grading S & SG over existing pavement or subgrade surfaces previously prepared by the contractor or City of Fort Collins Crews. Subsection 403.02 is revised to include the following: Laboratory Mix Design — Grading S & SG - The mix designs shall be prepared by an independent laboratory acceptable to the Engineer and shall be submitted by the Contractor to the Engineer for approval a minimum on one (1) month prior to the beginning of paving for this project. The criteria for the mix design is as follows: HBP Grading S & SG ESAL's = County Road 54 = 365,000 Binder: Grading S - PG 64-28 / Grading SG — PG 64-22 Designed according to the most recent set of SUPERPAVE Specifications available. SEE TABLE 403-1 NEXT PAGE FOR DESIGN CRETERIA A request made in writing by the Contractor for changes in the job mix formula will be considered by the Engineer. The Contractor shall prepare a quality control plan outlining the steps taken to minimize segregation of HBP. This plan shall be submitted to the Engineer and approved prior to beginning the paving operations. When the Engineer determines that segregation is unacceptable, the paving shalt stop and the cause of segregation shall be corrected before paving operations will be allowed to resume. Reclaimed materials will not be allowed in Hot Bituminous Pavement. A maximum of 20% reclaimed material will be allowed for HBP Grading SG. The Contractor shall construct the work such that all roadway pavement placed prior to the time paving operations end for the year, shall be completed to the full thickness required by the plans. The Contractor's Progress Schedule shall show the methods to be used to comply with this requirement. PAVEMENT SECTION: Ziegler Road Grading S 2.51' Grading SG 4" The design mix for Grading S, SX, and SG shall conform to the following: UADrake/Ziegler Improvement Project Phase I Technical Specifications Technical Specs - 22 Drake/Ziegler Improvement Project Phase It TABLE 403-1 Date: December 26, 2006 Property Test Grading S Grading SG Grading SX Method N/A this Project Air Voids, percent at: CPL 5115 N (initial) > 11.0 > 11.0 > 11.0 N (design) 3.0 - 5.0 3.0 - 5.0 3.0 - 5.0 N maximum > 2.0 > 2.0 > 2.0 Lab Compaction (Revolutions): CPL 5115 N (initial) (a) 8 8 (a) N (design) (b) 109 109 (b) N maximum a 174 174 a Stability, minimum (a) CPL 5106 42 42 (a) for information Aggregate Retained on the 4.75 mm CP 45 60 60 60 (No. 4) Sieve with at least two Mechanically Induced Fractured Faces, % minimum Accelerated Moisture Susceptibility CPL 5109 80 80 80 Tensile Strength Ratio (Lottman), Method B minimum Minimum Dry Split Tensile CPL 5109 205 (30) 205 (30) 205 (30) Strength, kPa(psi) Method B Grade of Asphalt Cement PG 64-28 PG 64-22 PG 64-22 Top Layer Grade of Asphalt Cement Layers PG 64-28 PG 58-28 PG 64-22 Below To Voids in the Mineral Aggregate CP 48 14.0 12.0 (a) VMA % minimum a Voids Filled with Asphalt (VIA) % Al MS-2 65 - 75 65 - 75 (a) a (a) Current CDOT Design Criteria (b) Residential 50, Collector 75, Arterial 100 Note: AIMS-2 = Asphalt Institute Manual Series 2 Note: The current version of CPL 5115 is available from the Region Materials Engineer, Note: Mixes with gradations having less than 40% passing the 4.75 mm (No. 4) sieve shall be approached with caution because of constructability problems. Subsection 403.03 is revised to include the following: Regardless of the delivery temperature, the mixture shall not be placed for use on the roadway at a temperature lower than 225degree F. Emulsified Asphalt for tack coat shall be Grade CSS-lh. The tack coat shall consist of a 1:1 dilution (one (1) part emulsified asphalt to one (1) part water. The application rate for tack coat shall be approximately 0.1 gallons per square UADrake/Ziegler Improvement Project Phase Iffechnical Specifications Technical Specs - 23 Drake/Ziegler Improvement Project Phase [I Date: December 26, 2006 yard. The existing pavement shall be broomed and cleaned to be free of dirt, water, vegetation and other deleterious matter immediately prior to commencing the paving operation. Edges of the area to be patched shall be sawcut vertically, and perpendicular or parallel to the roadway, as directed by the Engineer. Tack coat shall be placed against clean, vertical edges on all sides of the area to be patched. Hot Bituminous Pavement Grading S and SX shall be placed in equal lifts not exceeding three (3) inches. The minimum lift thickness for Grading SX shall be one (1) inch and Grading S shall be (1 %2) inch. HBP Grading SG shall be placed in equal lifts not exceeding four (4) inches and the minimum lift thickness shall be three (3) inches. Overlaying layers of Hot Bituminous Pavement shall not be placed until the lower layer has cooled sufficiently to provide a stable material which will support the equipment without rutting, shoving or moving in any manner. Tack coat shall be placed between all lifts. Subsection 403.04 shall include the following: Hot Bituminous Pavement Grading SG, and S, will be measured by the ton and paid for at the Contract Unit Price for Asphalt Patching and Hot Bituminous Pavement. Pavement cutting, excavation, subgrade preparation, haul and disposal, bituminous materials, aggregate, asphalt cement, asphalt recycling agent, additives, hydrated lime, and all other work necessary to complete each hot bituminous pavement item will not be paid for separately but shall be included in the unit price bid. Load slips shall be consecutively numbered for each day and shall include batch time. Subsection 403.05 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 403-01 HBP Paver Patch — Grading S — (2.5" Depth) - (PG 64-28) — (TON) 403-02 HBP Paver Patch - Grading SG — (4" Depth) - (PG 58-28) — (TON) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in Hot Bituminous Pavement and Asphalt Patching, including pavement cutting, excavation, subgrade preparation, haul and disposal, compaction, rolling, surface preparation, and bituminous materials, complete in -place, as shown on these plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase Iffechnical Specifications Technical Specs - 24 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 506 RIPRAP Date: December 26, 2006 Section 506 of the Standard Specifications is hereby revised as follows: Subsection 506.01 is revised to include the following: This work consists of the construction of riprap sections with riprap, Type II bedding and covered with topsoil in accordance with these specifications and in conformity with the lines and grades shown on the plans or established grades. Subsection 506.02 is revised to include the following: Color of buried riprap shall be approved by the Engineer. Exposed riprap shall be gray to blue gray in color or as approved by the Engineer. Rock used for riprap shall be hard, durable, angular in shape and free from cracks, over -burden, shale and organic matter. Thin, slab type stones, rounded stones and flaking rock shall not be used. Removed concrete shall not be used for riprap without specific written approval by the Engineer. Service records of the proposed material will be considered by the Engineer in determining the acceptability of the rock. Neither breadth nor thickness of a single stone shall be less than one-third (1/3) its length. Bedding material shall conform to the specification for Type II Filter material as per the City of Fort Collins Storm Drainage Design Criteria and Construction Standards (Table 12-3) or CDOT Class A filter material (Section 703.09). Subsection 506.03 is revised to include the following: Wherever possible, the excavation for the riprap sections shall be undisturbed material, or where this is not possible, the underlying materials shall be compacted to 95% of maximum density as determined by ASTM D 698. The bottom of the excavation shall have a uniform slope, be reasonably smooth, free from mounds and windrows and free of debris prior to placing the filter material. Bedding material shall be placed on top of the subgrade material prior to riprap installation at all locations of riprap sections shown on the plans. The layer shall be shaped to provide the minimum thickness of bedding material as shown on the details of the plans. Riprap material shall be placed immediately after the bedding material is placed and in a manner to provide a well - graded mass of stone with minimum voids. Riprap may be machine -placed with sufficient handwork to minimize disturbance of the bedding material layer. This material shall be placed to the required thickness and grade shown on the details of the plans. Topsoil material shall be used to backfill and bury the entire riprap bed area and compacted to insure thorough settling of the topsoil within the rock voids. The top three inches (Y) of the topsoil shall be loosely placed. This material shall be placed to the required thickness as shown on the details of the plans. The contractor shall utilize, when appropriate, existing topsoil on site. Subsection 506.04 is revised to include the following: Riprap sections specified in the plans will be paid for at the contract unit price per TON. The unit price bid shall U:\Drake/Ziegler Improvement Project Phase ll\Technical Specifications Technical Specs - 25 Drake/Ziegler Improvement Project Phase II Date: December 26, 2006 include all costs associated with installation of the bedding material, riprap and topsoil including excavating for the placement of these materials, all materials, delivery, stockpiling and handling of the riprap. Subsection 506.05 is revised to include the following: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 506-01 9'X9'X18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-02 22'X184'X18" Type L Rip -Rap 6" Topsoil (CIP Per Detail) — (EA) 506-03 27'X119'X18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-04 240'X 15'X 18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-05 240'X30'X18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-06 145'X18'X18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-07 4'X4'X 18" Type L Rip -Rap— 6" Topsoil (CIP Per Detail) — (EA) 506-08 39'X17'X18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-09 16'X12'X2' Type M Rip -Rap — 6" Topsoil (CIP Per Detail) — (EA) 506-10 12" D50 Rip -Rap @ Page 35 of 142 — (TON) 506-11 18" Type H D50 Rip -Rap — (TON) 506-12 Rip Rap at McDowell Box Culvert — (CY) The above prices and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in excavating, placing riprap, bedding and topsoil, complete -in - place, including haul and stockpile of materials, handling of the riprap and finish grading of the surface as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION UADrakelZiegler Improvement Project Phase Iffechnical Specifications Technical Specs - 26 Drake/Ziegler Improvement Project Phase lI REVISION OF SECTION 601 STRUCTURAL CONCRETE Section 601 of the Standard Specifications is hereby revised as follows: Subsection 601.01 is revised to include the following: Date: December 26, 2006 This work shall consist of the addition to the Spring Creek Bridge on Timberline Road. The construction will consist of Pilings, Bridge abutments, Bridge Deck, Parapet Walls, Railing and necessary conduits in accordance with the plans, specifications, and the Larimer County Urban Area Street Standards. It shall be the Contractor's responsibility to purchase and familiarize themselves with these specifications. The Contractor is responsible for providing all materials and equipment necessary to meet the requirements of the Colorado Department of Transportation Standards and Larimer County Urban Area Street Standards. Mix Design: 1. Compressive Strength: 4000 psi at 28 days a. Minimum number of cylinders passing above requirements shall be 90%. b. Minimum strength of cylinder acceptable, 3800 psi 2. Cement Content: 6 bags per cubic yard minimum 3. Maximum Permissible Water — Cement Ratio a. For 4000 psi strength, non air -entrained, absolute ratio by weight 0.49. b. For 4000 psi strength, air -entrained, absolute ratio by weight 0.45 4. Slump: Four inch maximum. 5. Air Content: 6% +/- 1 'h % for concrete with exposed surfaces or subject to freezing and thawing; not required for other concrete. All Shop Drawings must be approved by the Design Engineer (Loris and Associates, Inc). The accepted quantities will be paid for at the contract price. Payment will be made under: Pay Item and Pqy Unit The pay unit is denoted by (). 601-01 20'X7'X84' Box Culvert —(CIP) W/Wingwalls/Parapet Walls/Toe Walls —(LS) 601-02 Metal Orifice Plate for 20'XTX84' Box Culvert — (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all Work involved in a cast in place bridge, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase li\Technical Specifications Technical Specs - 27 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 603 CULVERTS AND SEWER Section 603 of the Standard Specifications is hereby revised as follows: Subsection 603.01 is revised to include the following: Date: December 26, 2006 This work shall consist of the construction of Reinforced Concrete Pipe, Corrigated Metal Pipe, pipe connections, and joint encasement in accordance with the plans, specifications, and the Larimer County Urban Design Standards. It shall be the Contractor's responsibility to purchase and familiarize themselves with these specifications. The Contractor shall include in the Work all the necessary items to complete the Work including but not limited to excavation, bedding, backfill, and compaction. The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 603-01 12" PVC C-900 — (LF) 603-02 24" Class III RCP — (LF) 603-03 30" Class III RCP — (LF) 603-04 36" Class III RCP — (LF) 603-05 24" Class III RCP — FES — (EA) 603-06 30" Class III RCP — FES — (EA) 603-07 36" Class III RCP — FES — (EA) 603-08 Tie to Existing Storm Drain Lines — (EA) 603-09 Concrete Headwall for 12" PVC — (LS) 603-10 2X48" RCP @ Outfall Channel Siphon — (LF) 603-11 48"X12" RCP Tee— (EA) 603-12 48" Special Elbows 16.7*Concrete RCP — (EA) 603-13 2X48" RCP Concrete Encasement Per Detail — (LF) 603-14 Concrete Encasement on 12" PVC SDR-35 Pipe — (LF) 603-15 12" PVC SDR-35 — (LF) 603-16 30" Steel Encasement Pipe — (LF) U:\Drake/Ziegler Improvement Project Phase Iffechnical Specifications Technical Specs - 28 Drake/Ziegler Improvement Project Phase II Date: December 26, 2006 603-17 Tie 12" PVC SDR-35 to Existing Manhole — (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all Work involved in installing pipe and encasing joints, complete in -place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. Concrete and/or Asphalt patching will be paid for separately under the appropriate item. END OF SECTION U:\Drake/Ziegler Improvement Project Phase Il\Technical Specifications Technical Specs - 29 Drake/Ziegler Improvement Project Phase If Date: December 26, 2006 REVISION OF SECTION 604 MANHOLES, INLETS, AND METER VAULTS Section 604 of the Standard Specifications is hereby revised as follows: Subsection 604.01 is revised to include the following: This work shall consist of the construction of COFC Area Inlets, CDOT Type R inlets and providing and maintaining erosion control, in accordance with the plans, specifications, and the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. It shall be the Contractor's responsibility to purchase and familiarize themselves with these specifications. The Contractor shall include the cost of excavation, backfill, compaction, and installation and maintenance of erosion control into each item listed in this section. The Contractor shall clean all sediment caught in the storm sewer system due to this project. The frequency of the cleaning shall be at the direction of the Engineer. The Contractor will not be allowed to flush the pipes with water. All Erosion Control Devices, Materials, and Techniques required to prevent damage to the storm water facilities as outlined in the City of Fort Collins Standards will be considered incidental to the work, and shall be included in the price. No measurement for payment shall be made for maintenance of Erosion Control devices. Subsection 604.02 is revised to include the following: Proportioning shall conform to the requirements for Class B concrete as described in Section 601. Subsection 604.08 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 604-01 4' Storm Sewer Manhole — (EA) 604-02 Type 13 Area Inlet — (EA) 604-03 48" Cut-off Walls —(EA) 604-04 48" Siphon Manholes — 6' Diameter — (EA) 604-05 48" Siphon Inlet Box — (EA) 604-06 48" Siphon Outlet Structure — (EA) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing inlets, constructing manholes, and installing and maintaining erosion control, complete -in -place, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:1Dmke/Ziegler Improvement Project Phase If\Technical Specifications Technical Specs - 30 to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions are available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self- addressed, self -stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION 12/03 Section 00100 Page 8 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 608 SIDEWALKS AND DECORATIVE CROSSWALKS Section 608 of the Standard Specifications is hereby revised for this project as follows: Subsection 608.01 is revised to include the following: Date: December 26, 2006 This work shall consist of the construction of concrete driveways, in accordance with the plans and specifications. Required saw cutting will be incidental to the work and will not be measured or paid for separately. The use of aggregate base material for fine grading or over excavated areas will not be paid for separately. Subsection 608.02 is revised to include the following: Proportioning shall conform to the requirements for Class "B" concrete as described in Section 601 with the exception the minimum 28 day compressive strength shall be 3500 psi. Subsection 608.05 is revised to include the following: The Concrete Driveways (6") item will be measured by the square foot of finished flatwork. Subsection 608.09 is revised to include the following: The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 608-01 Concrete Spillway @ Stoneridge Pond (45'Xl') —Per Detail — (LS) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in constructing concrete sidewalks, miscellaneous flatwork, access ramps, drive approaches, and driveways, complete -in -place, including haul, concrete materials, finishing the surface, saw cutting joints, curing, placing dowels, and sealing joints as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase 11\Technical Specifications Technical Specs - 31 Drake/Ziegler Improvement Project Phase 11 REVISION OF SECTION 619 WATER LINES Section 619 of the Standard Specifications is hereby revised as follows: Subsection 619.01 is revised to include the following: Date: December 26, 2006 This work shall include installing DIP Pipe, gate valves, tees, tapping saddles, plugs, reaction blocks, fire hydrants and joining to existing lines and other items as shown on the plans and as designated by the Engineer. This work shall meet the requirements of the current City of Fort Collins Standard Construction Specifications. It shall be the Contractors responsibility to purchase and familiarize themselves with these specifications. All work associated with installing the water lines that is NOT itemized in the bid tab shall be considered incidental to the work and will not be paid for separately. This includes, but is not limited to excavating and backfilling, valve boxes, plugs, thrust blocks, bedding materials, poly -wrap, chlorinating, pressure testing and all materials incidental to completing the installation and connections to existing water lines. Subsection 619.05 is revised as follows: Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 619-01 8" DIP CL — 52 Water Main — (LF) 619-02 Plug w/Thrust Blocks — (EA) 619-03 1" Irrigation Service (including Curb Stop, Corp Stop and Tapping Saddle — (EA) 619-04 8" Water Line Lowering at Cottonwood Box Culvert — (EA) 619-05 45 Degree Bends w/Thrust Blocks — (EA) The above prices and payment shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in installing PVC water pipe and valves, connecting to existing water lines according to Elco Water District Standards, complete -in -place, as shown on the plans, as specified in these specifications, and as directed by the Engineer. END OF SECTION U:\Drake/Ziegler Improvement Project Phase Il\Technical Specifications Technical Specs - 32 SECTION 00300 BID FORM SECTION 00300 BID FORM PROJECT: 6029 Drake Zeigler Improvement Project - Phase 2 Place Date 1. In compliance with your Invitation to Bid dated , 20 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ($ ) in accordance with to Bidders. the Invitation To Bid and Instructions 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: S. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through 7/96 Section 00300 Page 1 CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release(Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC -A GC -Al - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS 8. Base Bid 6029 Drake Ziegler Improvement Project Phase 11 CITY OF FORT COLLINS, STREET OVERSIZING DEPARTMENT BID TAB: ITEM NUMBER DESCRIPTION CONTRACT QUANTITY UNIT UNIT COST TOTAL COST 201-01 Clearing and Grubbin 1 LS 202-01 Remove Pie RCP,CMP,PVC 170 LF 202-02 Remove Vertical Curb and Gutter 275 LF 202-03 Remove Sidewalk 275 LF 202-04 Remove Asphalt Pavement 5"-10" Depth) 2,800 SY 202-05 Remove 25x30 Existing FICRD Crossing Structure (Old Count Rd. #9) 1 LS 202-06 Remove Air Vac Manhole and Valve 1 EA 202-07 Remove Stonerid e Spillway Per Plan Sheets 9 of 74 1 LS 202-08 Remove Culvert 22 LF 202-09 Remove Irrigation Structure 2 EA 202-10 Abandon 6" Water Station 96+50 Per Plan 1 LS 202-11 Flow Fill Abandoned 6" Water Line 1 LS 202-12 Saw Cut Existing Asphalt 116 LF 202-13 Remove Existing FCLWD Meter Pit and Meter 1 LS 202-14 Remove Existing Concrete Headwalls 2 EA 203-01 Unclassified Excavation - Roadway 8,000 CY 203-02 Unclassified Excavation - Outfall Channel 32,550 CY 203-03 Unclassified Excavation - FCRID Channel 6,523 CY 203-04 Haul - Outfall Channel Excess Material 32,550 CY 203-05 Embankment - CIP - Roadway 65,337 CY 203-06 Embankment - CIP - Outfall Channel 2,930 CY 203-07 Embankment - CIP - FCRID Channel 4,058 CY 203-08 Import Fill 24,661 CY 203-09 Topsoil - (Stripping, Stockpiling, Placing) - 6" Depth - Roadway 5,576 CY 203-10 Topsoil (Stripping, Stockpiling and Placing) (6") - Outfall Channel 8,550 CY 203-11 Topsoil (Stripping, Stockpiling, Placing) (6") - FCRID Channel 2,814 CY 203-12 Muck Excavation - Outfall Channel 2,450 CY 203-13 Muck Excavation - FCRID Channel 1,915 CY 203-14 Potholing 1 LS 203-15 Flow Fill Section Over Shallow Utilities 200 LF 203-16 Borrow ABC Class 5 or 6 - CIP - at FCRID Realignment 550 TON 206-01 Structure Excavations 970 CY 206-02 Borrow Structural Backfill Material R-Value>25 549 CY 206-03 Structure Backfill Flow Fill 1,400 CY 206-04 Filter Material 1 1/2" Washed Rock 400 TON 206-05 Structure Haul and Dispose On -Site 514 CY 206-06 Structure Muck Excavation 514 CY 206-07 Dewaterin 3 EA 208-01 Erosion Control 1 LS 208-02 Wattles 300 LF 208-03 Sloe Coco Mat With Seed 13,300 SF 208-04 Straw Bale Slope Protection 36 EA 210-01 Modif Manhole 2 EA, 210-02 Relocate Existinq Head ate 1 LS 304-01 Gravel Access Road - 6" - CIP 4,200 TON 403-01 HBP Paver Patach - Grading S - 2.5" Depth) - PG 64-28 50 TON 403-02 HBP Paver Patch - Grading SG - 4" Depth) - PG 58-28 234 TON 506-01 9'X9'X18" Type L Rip -Rap- 6" Topsoil CIP Per Detail 2 EA 506-02 22'X184'X18" Type L Rip -Rap - 6" Topsoil CIP Per Detail 1 EA 6029 Drake Ziegler Improvement Project Phase II CITY OF FORT COLLINS, STREET OVERSIZING DEPARTMENT BID TAB: ITEM NUMBER DESCRIPTION CONTRACT QUANTITY UNIT UNIT COST TOTAL COST 506-03 27'X119'X18" Type L Rip -Rap - 6" Topsoil CIP Per Detail 1 EA 506-04 240'X15'X18" Type L Rip -Rap - 6" Topsoil CIP Per Det2ilL 1 EA 506-05 240'X30'X18" Type L Rip -Rap - 6" Topsoil CIP Per Detail 1 EA 506-06 145'X18'X18" Type L Rip -Rap - 6" Topsoil CIP Per Detail 1 EA 506-07 4'X4'X18" Type L Rip -Rap - 6" To soil CIP Per Detail 1 EA 506-08 39'X17'X18" T e L Rip -Rap - 6" To soil CIP Per Detail 1 EA 506-09 16'X1 2'X2'Type M Rip -Rap - 6" Topsoil (CIP Per Detail) Outfall Channel 1 EA 506-10 12" D50 Ri -Ra @ Page 54 of 74 - Outfall Channel 232 TON 506-11 18" Type H D50 Rip -Rap - Outfall Channel 180 TON 506-12 Rip Rap at McDowell Box Culvert 63 CY 601-01 20'X7'X84' Box Culvert - (CIP) W/Wingwalls/Paraphet Walls/Toe Walls 1 LS 601-02 Metal Orrafice Plate for 20'X7'X84' Box Culvert 1 LS 603-01 12" PVC C-900 149 LF 603-02 24" Class III RCP 25 LF 603-03 30" Class III RCP 67 LF 603-04 36" Class III RCP 171 LF 603-05 24" Class III RCP FES 1 EA 603-06 30" Class III RCP FES 1 EA 603-07 36" Class III RCP FES 1 EA 603-08 Tie to Existing Storm Drain Lines 2 EA 603-09 Concrete Headwall for 12" PVC 1 LS 603-10 36" RCP Headwall 1 LS 603-11 2X48" RCP @ Outfall Channel Siphon 180 LF 603-12 48"X12" RCP Tee 2 EA 603-13 48" Special Elbows 16.7'Concrete RCP 4 EA 603-14 2X48" RCP Concrete Encasement Per Detail 105 LF 603-15 Concrete Encasement on 36" RCP Pie 20 LF 603-16 Concrete Encasement on 12" PVC SDR-35 Pie 105 LF 603-17 12" PVC SDR-35 863 LF 603-18 30" Steel Encasement Pie 116 LF 603-19 Tie 12" PVC SDR-35 to Existing Manhole 2 EA 604-01 4' Storm Sewer Manhole 2 EA 604-02 Type 13 Area Inlet 1 EA 604-03 48" Cut-off Walls 3 EA 604-04 48" Siphon Manholes - 6' Diameter 2 EA 604-05 48" Siphon Inlet Box 1 EA 604-06 48" Siphon Outlet Structure 608-01 Concrete Spillway Stonerid a Pond 45'X1' - Per Detail 619-01 8" DIP CI-52 Water Main 619-02 8"X8"X6" Swivel Tee W/T13 M1EA 619-03 Plu w/Thrust Blocks 619-04 1" Irrigation Service (including Curb Stop, Corp Stop and Tapping Saddle) 1 EA 619-05 8" Water Line Lowering at Cottonwood Box Culvert 1 EA 619-06 45 Degree Bends w/Thrust Blocks 2 EA 619-07 8"X6" Reducer 1 EA 619-08 Fire Hydrant Assembly 1 EA Subtotal Drake/Ziegler Phase 11 1 ,1 �� i1,$�.. a F; 2900-01 ee ing �15 ACRE Subtotal Lanscaping Quantities. ` 1 ! 110901 6029 Drake Ziegler Improvement Project Phase 11 CITY OF FORT COLLINS, STREET OVERSIZING DEPARTMENT BID TAB: ITEM NUMBER - DESCRIPTION Contract Bond CONTRACT QUANTITY 1 UNIT LS UNIT COST TOTAL COST 625-01 Construction Surveying 1 LS 626-01 Mobilization 1 LS 630-01 Type III Barricades 7 3ECTION 630-02 Message boards 1 LS suetotai uraKeluegier rnase n mist. wuantmes: Total in words: 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: CONTRACTOR (Please Print) BY: Signature Title License Number (If Applicable) (Seal - if Bid is by corporation) Attest: Address Telephone Email Date 7/96 Section 00300 Page 5 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 6029 Drake Zeigler Improvement Project - Phase 2. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the 'time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20 , and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL Name: Address: By: Title: ATTEST: By: (SEAL) SURETY By: Title: (SEAL) 7/96 Section 00410 Page 3 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: $ 16. Bank reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 19. Are you licensed as a General CONTRACTOR? If yes, in what city, county and state? class, license and numbers? Do you anticipate subcontracting Contract? If yes, what percent of total contract? and to whom? What Work under this 20. Are any lawsuits pending against you or your firm at this time? IF yes, DETAIL 7/96 Section 00420 Page 2 21. What are the limits of your public liability? DETAIL 22 What company? What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at this day of Name of Bidder By: Title: State of County of 20 being duly sworn deposes and says that he is of and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20 Notary Public My commission expires 7/96 Section 00420 Page 3 SECTION 00020 INVITATION TO BID 07/2001 Section 00020 Page 2 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 150 of the contract. ITEM 7/96 SUBCONTRACTOR Section 00430 Page 1 SECTION 00500 AGREEMENT FORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed SECTION 00510 NOTICE OF AWARD Date: TO: PROJECT: 6029 Drake Zeigler Improvement Project - Phase 2 OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated , 20 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 6029 Drake Zeigler Improvement Project - Phase 2: Improvements begin 100 feet east of the Drake Road/Environmental Drive intersection and continue to Horsetooth Road. The improvements consist of significant earthwork, water line installation, one cast in place 20'x7' box culverts and realigning 700 lineal Feet of the FCRID ditch. There are also significant drainage improvements to Rigden Farms Development which consists of installing 180 LF of dual 48" RCP Class III Pipes, a siphon structure, and 7200 LF of ditch construction. The Contractor will provide surveying. The City will provide traffic control. The Contractor will be required to work with our traffic control supervisor. Material Testing will be provided by the City and performed by CTL Thompson, Inc.. The Price of your Agreement is Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by 20 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions OWNER to consider your Bid abandoned, declare your Bid Security forfeited. within the time specified will entitle to annul this Notice of Award and to Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. By: City of Fort Collins OWNER James B. O'Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management 9/12/01 Section 00510 Page 1 SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the day of in the year of 20 and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 6029 Drake Zeigler Improvement Project - Phase 2and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by JR Engineering, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete within seventy-five (75) working days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within eighty-five (85) working days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 9/12/01 Section 00520 Page 1 1) Substantial Completion: One Thousand Seven hundred and Seventy Eight Dollars ($1,778.00) for each working day or fraction thereof that expires after the seventy-five (75) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, Six Hundred Dollars ($600.00) for each working day or fraction thereof that expires after the ten(10) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1. OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: ($ ), $ Dollars, in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, progress payments will be in the amount equal to the percentage indicated below, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. 90% of the value of Work completed until the Work has been 50% completed as determined by ENGINEER, when the retainage equals 5% of the Contract Price, and if the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 90% of materials and equipment not incorporated in the Work (but delivered, suitably 9/12/01 Section 00520 Page 2 stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information 9/12/01 Section 00520 Page 3 or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of "Contract Documents" in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3Lien Waiver Releases 7.2.4Consent of Surety 7.2.5Application for Exemption Certificate 7.2. 6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Sheet 1 Cover Sheet Sheet 2 Typical Sections Sheet 3 General Notes Sheet 4 Horizontal Control Sheet 5 Phasing Plan Sheet 6 Right of Way Map Sheet 7-9 Remove and Replace Plans Sheet 10-14 Plan and Profile Sheet 15-16 Grading Plan Sheet 17-18 Erosion Control Plans Sheet 19-25 Storm Sewer Plan and Profile Sheet 26 FCRID Realignment Plan and Profile Sheet 27-28 FCRID Realignment Cross Sections Sheet 29-32 Foothills Channel 20'x7' C.I.P. Box Culvert Details 9/12/01 Section 00520 Page 4 Sheet 33-34 Signing and Striping Plans Sheet 35-43 Roadway Cross Sections Sheet 44 Pond 269 8'x4' Precast Box Culvert Plan and Profile Sheet 45 Pond 269 Grading and Erosion Control Plan Sheet 46 Pond 216 Siphon Pipe Plan and Profile Sheet 47 Junction Box 3 Details Sheet 48-51 Pond 216, Pond 269, & Siphon Pipe Details Sheet 52-54 Outfall Channel Grading Plans Sheet 55-68 Cottonwood Farms 20'x7' C.I.P. Box Culvert Sheet 69-74 Details The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers to inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. 9/12/01 Section 00520 Page 5 OWNER: CITY OF FORT COLLINS CONTRACTOR: By: Darin Atteberry, City Manager By: JAMES B. O'NEILL II, CPPO, FNIGP DIRECTOR OF PURCHASING AND RISK MANAGEMENT Date: Attest: City Clerk Address for giving notices: • 6 =11 Fort Collins, CO 80522 Approved as to Form Assistant City Attorney By: Title: Date: (CORPORATE SEAL) Attest: Address for giving notices: LICENSE NO.: 9/12/01 Section 00520 Page 6 9/12/01 Section 00520 Page 7 SECTION 00020 INVITATION TO BID Date: February 7, 2007 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on February 28, 2007, for the Drake Zeigler Improvement Project - Phase 2; BID NO. 6029. If delivered, they are to be delivered to 215 North Mason Street, 2°d Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. 0. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of Bid 6029 Drake/Zeigler Improvement Project - Phase 2 Drake Ziegler Phase II Improvements begin 100 feet east of the Drake Road/Environmental Drive intersection and continue to Horsetooth Road. The improvements consist of significant earthwork, water line installation, one cast in place 20'x7' box culverts and realigning 700 lineal Feet of the FCRID ditch. There are also significant drainage improvements to Rigden Farms Development which consists of installing 180 LF of dual 48" RCP Class III Pipes, a siphon structure, and 7200 LF of ditch construction. The Contractor will provide surveying. The City will provide traffic control. The Contractor will be required to work with our traffic control supervisor. Material Testing will be provided by the City and performed by CTL Thompson, Inc. All Bids must be in accordance with the Contract Documents on file with The City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. A prebid conference and job walk with representatives of prospective Bidders will be held at 1:00 P.M., on February 15, 2007, at 281 North College, Conference Room A in Fort Collins. Contract Documents will be available February 7, 2007. The Contract Documents and Construction Drawings may be examined online at: 1. City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.]sp 2. Mercury-LDO Reprographics: www.mercury-ldo.com 07/2001 Section 00020 Page 1 SECTION 00530 NOTICE TO PROCEED Description of Work: 6029 Drake Zeigler Improvement Project - Phase 2 To: This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20 The dates for Substantial Completion and Final Acceptance shall be , 20_ and 20_, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20 CONTRACTOR: By: Title: 7/96 Section 00530 Page 1 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the _ day of , 20 , a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 6029 Drake Zeigler Improvement Project - Phase 2. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00610 Page 1 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20 . IN PRESENCE OF: Principal (Title) (Address) (Corporate Seal) IN PRESENCE OF: Other Partners M By: IN PRESENCE OF: Surety By: M (Surety Seal) (Address) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00610 Page 2 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the _ day of , 20 , a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, 6029 Drake Zeigler Improvement Project - Phase 2. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. 7/96 Section 00615 Page 1 PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20 IN PRESENCE OF: (Corporate Seal) IN PRESENCE OF: IN PRESENCE OF: (Surety Seal) Principal By: (Title) (Address) Other Partners Surety By: By: (Address) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. 7/96 Section 00615 Page 2 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. 7/96 Section 00630 Page 1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 6029 Drake Zeigler Improvement Project - Phase 2 PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: CONTRACT DATE: The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. By: CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: 7/96 Section 00635 Page 1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE TO: Gentlemen: , 20 You are hereby notified that on the _ day of , 20_, the City of Fort Collins, Colorado, has accepted the Work completed by for the City of Fort Collins project, 6029 Drake Zeigler Improvement Project - Phase 2. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated , 20 In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: r 20 Sincerely, OWNER: Citv of Fort Collins By: Title: ATTEST: Title: 7/96 Section 00640 Page 1 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT: 6029 Drake Zeigler Improvement Project - Phase 2 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the 7/96 Section 00650 Page 1 Copies of the Contract Documents, complete with Construction Specifications and Drawings, may be viewed and purchased at: 1. Mercury LDO Reprograhics: • FORT COLLINS: 422 S. Link Lane, Ft. Collins, CO 80524 Ph: 970-484-1201, Fax: 970-221-0404 • ENGLEWOOD: 9632 E. Arapahoe, Englewood, CO. 80112 Ph: 303-790-7169, Fax: 303-792-2936 • DENVER: 860 Bryant Street, Denver, CO. 80204 Ph: 303-893-8701, Fax: 303-893-0617 • COLORADO SPRINGS:11 E Las Vegas, Colorado Springs, CO. 80903 Ph: 719-231-8121, Fax: 719-633-5710 • LODO: 1660 Wynkoop Ste. 130, Denver, CO. 80202 Ph: 303-785-2520, Fax: 303-785-2522 • BOULDER: 2575 Pearl St. Unit C., Boulder, CO. 80302 Ph: 303-539-1350, Fax: 303-539-1356 2. Builders Exchange, 223 South Link Lane, Fort Collins, Colorado. 07/2001 Section 00020 Page 2 OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20 CONTRACTOR M Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20 , by Witness my hand and official seal. My Commission Expires: Notary Public 7/96 Section 00650 Page 2 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: PROJECT: 6029 Drake Zeigler Improvement Project - Phase 2 CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , (Surety Company) By ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in- Fact. 7/96 Section 00660 Page 1 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE DR Ot 72 (1 MS) C COLORADO DEPARTNEW OF REVENUE V OENVE CO 61 (303) 232-2416 CONTRACTOR APPLICATION 2-24t6 FOR EXEMPTION CERTIFICATE Puns WtoStatute Section 39-26.114(1 Ka)PQ DO NOT WRITE IN THIR SPAf'.F The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part oft he structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will resuk in revocation of your exemption certificate and other penalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side). FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. sUatxryAcwut No. to be assgled by DO 89 - erbd 0170-750 (999) $0.00 ' � ,g 3 T >" � Ps F � �� � � $Yp a$ % °� a ..P A Trade name er, pa ter, or corpora a name: Mailing address(City, State,zip) . ontac erson E-Mail address Federal Employer's denblicalion Number: id amount oryour contract ez um er: Business telepMne rumbeC Colorado w9ahoiding tax amount number Name or exemp organza Ion as shown on convacQ Exemptorganizallon s number 98 - tl ress of exempt organization y, State,Zip): Principal writact at exempt organization: Prinoilpal con ac s telephone number Physical oca on of prolec si (give acWa a ress when applicable and uilies and/or County yes ere project Is located) Scheduled WrAh Day ear Estimated on ay ear .stru, ion start data completion date: V° m 1 declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge Signature or owner, partner or corporate o cer Tille o corpora officer: Date UV NU VVKIIC OCLVVV IFIIA LIINC Section 00670 Page 1 Special Notice Contractors who have completed this application in the past, please note the following changes in procedure The Department will no longer issue individual Certificates of exam ption to subcontractors. Only prime contrac- tors will receive a Contractor's Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor's name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor's place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 899 has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89- 12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeed- ing numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. Section 00670 Page 2 SECTION 00700 GENERAL CONDITIONS GENERAL CONDITIONS CONSTRUCTION CONTRACT These GENERAL CONDITIONS have been developed by using the STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT prepared by the Engineers Joint Contract Documents Committee, EJCDC No. 1910-8 (1990 Edition), as a base. Changes to that document are shown by underlining text that has been added and striking through text that has been deleted. EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) WITH CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) TABLE OF CONTENTS OF GENERAL CONDITIONS Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 1. DEFINITIONS„........................................:........_1 2. PRELIMINARY MATTERS................................3 1.1 Addenda............................................1 2.1 Delivery of Bonds 3 1.2 Agreement ................. I .............. ...._.... 2.2 Copies of Documents........................3 1.3 Application for Payment....... ................ 1 2.3 Commencement of Contract 1.4 Asbestos ...................................... ....... I Times; Notice to Proceed............... 3 1.5 Bid .................................................... i 2.4 Starting the Work........................... 3 1.6 Bidding Documents .............................1. 2.5-2.7 Before Starting Construction; 1.7 Bidding Requirements ......... ......... ...... 1 CONTRACTORS Responsibility 1.8 Bonds.................................................1 to Report; Preliminary Schedlles; 1.9 Change Order......................................1 Delivery of Certificates of 1.10 ContractDocuments ............................I Insurance...,,,,,,,,,,.,,.,,.3-4 1.11 Contract PriceJ 2.8 PreconstructionConferencc..._....._.4 1.12 Contract Times ......., .................1 2.9 Initially Acceptable Schedules..... 4 1.13 CONTRACTOR..................................1 1.14 defective . ............................................. 1 3. CONTRACT DOCUMENTS: INTENT, 1.15 Drawings ...... ............... .......................I AMENDING, REUSE... ................ I ....... .............. 4 1.16 Effective Date of the Agreement........... 1 3.1-3.2 Intent..................................._........4 1.17 ENGINEER .............. „ ............ 1 3.3 Reference to Standards and Speci- 1.18 ENGINEERS Consultant, .................. J frcations of Technical Societies; 1.19 Field Order_......_..,-. l Reporting and Resolving Dis- 1.20 General Requirements... ...................... 2 crepancies....... ..... 4-5 1.21 Hazardous Waste ................................. 2 3.4 Intent of Certain Terms or 1.22.a Laws and Regulations; Laws or Adjectives ... ... I ...... I.......................5 Regulations......._.............................2 3.5 Amending Contract Docunents.... ._.5 1.22b Legal Holidays .................................... 2 3.6 Supplementing Contract 1.23 Liens 2 Documents 5 1.24 Milestone 2 3.7 Reuse of Documents 5 1.25 Notice of Award 2 1.26 Notice to Proceed.................................2 4. AVAILABILITY OF LANDS; 1.27 OWNER.__.._.......__...._.._._.-.._..........2 SUBSURFACE AND PHYSICAL CONDITIONS, 1.28 Partial Utilization 2 REFERENCE POINTS 5 1.29 PCBs......................................_..........2 4.1 Availability of Lands ............... ...... 5-6 1.30 Petroleum ............................ ... _,,.._...2 4.2 Subsurface and Physical 1.31 Project................................................2 Conditions..............................--....6 1.32.a Radioactive Material „.............. _ ......... 2 4.2.1 Reports and Drawings ..... ................6 1.32.b Regular Working Hours 2 4.2.2 Lim ited Reliance by CONTRAC- 1.33 Resident Project Representative ............ 2 TOR Authorized; Technical 1.34 Samples..............................................2 Data ..... .............. ....... ................. .6 1.35 Shop Drawings, ...... ... I ...... ... ............. _2 4.2.3 Notice of Differing Subsurface 1.36 Specifications__......_..........................2 or Physical Conditions ._._._....__.,,.6 1.37 Subcontractor,,,,,.,.,__,,. _...................2 4.2.4 ENGINEERsReview .......................6 1.38 Substantial Completion ...... .............. _,.2 4.2.5 Possible Contract Documents 1.39 Supplementary Conditions ............... Change............................._..,.__„_6 1.40 Supplier,.. ......._. .......... .......2 4.2.6 Possible Price and Times 1.41 Underground Facilities ......... ............ -3 Adjustments .............. ................ 6-7 1.42 Unit Price Work .......... ......... .........3 4.3 Physical Condtlons--Underground 1.43 Work 3 Facilities 7 1.44 Work Change Directive, ...... . .... .... 3 4.3.1 Shown or Indicated _,,.„...,....,_,,......7 1.45 Written Amendment. ......... 3 4.3.2 Not Shown or Indicated, 4.4 Reference Points....... ......................... 7 II EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9199) Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 4.5 Asbestos, PCBs, Petroleum, 6.25 Submittal Proceedures; CON - Hazardous Waste or TRACTOR's Review Prior Radioactive Material....................7-8 to Shop Drawing or Sample Submittal .................................... 16 5. BONDS AND INSURANCE ................................. 8 6.26 Shop Drawing & Sample Submit- 5.1-5.2 Performance, Payment and Other tals Review by ENGINEER ...... 16-17 Bonds...............................................8 6.27 Responsibility for Variations 5.3 Licensed Sureties and Insurers; From Contract Documents,,.,17 Certificates of Insurance ..................... 8 6.28 Related Work Performed Prior 5.4 CONTRACTOR's Liability to ENGINEER's Review and Insurance ..................... .................9 Approval of Required 5.5 OWNER'sLiabilityInsurance ..............9 Submittals,._...._......................._..17 5.6 Property Insurance ............. ............ 9-10 6.29 Continuing the Work ...... _................ 17 5.7 Boiler and Machinery or Addi- 6.30 CONTRACTOR's General tional Property Insurance.................10 Warranty and Guarantee,._.._,_.,..,, 17 5.8 Notice of Cancellation Promsion10 6.31-6.33 Indemnification....,_...,_.............17-18 5.9 CONTRACTOR's Responsibility 6.34 Survival of Obligations... ................. 18 for Deductible Amounts .................... 10 . 5.10 Other Special Insurance ..................... 10 7. OTHER WORK18 5.11 Waiver of Rights .................._.,..___,.11 Z1-7.3 Related Work at Site ....................... 18 5.12-5.13 Receipt and Application of 7.4 Coordination.,... I .._._.. .._.....18 Insurance Proceeds ...................... 10-11 5.14 Acceptance of Bonds andInsa- 8. OWNER SRESPONSIBILITIES ...... ...... .......... ._18 ance; Option to Replace ....... ...... 11 8.1 Communications to CON- 5.15 Partial Utilization --Property TRACTOR..................._........18 Insurance......................................11 8.2 Replacement of ENGINEER,....... 18 8.3 Furnish Data andPay Promptly 6. CONTRACTOR'S RESPONSIBILITIES 11 When Due 18 6.1-6.2 Supervision and Superintendence11 8.4 Lands and Easements, Reports 6.3-6.5 Labor, Materials and Equipment....11-12 and Tests,.........__.................18-19 6.6 Progress Schedule.. ............ - ........ 2 8.5 Insurance19 6.7 Substitutes and "Or -Equal" Items; 8.6 Change Orders ........................... 19 CONTRACTOR's Expense, 8.7 Inspections, Tests and Substitute Construction Approvals... . . ..... 19 Methods or Procedures; 8.8 Stop or Suspend Work; ENGINEER's Evaluation.............12-13 Terminate CONTRACTOR's 6.8-6.11 Concerning Subcontractors, Services._ ........ ........_.,,.,..„_....,19 Suppliers and Others; 8.9 Limitations on OWNER'S Waiver of Rights .... ............... .... 13-14 Responsibilities .... ............ ........... 9 6.12 Patent Fees and Royalties ...... ............14 8.10 Asbestos, PCBs, Petroleum, 6.13 Permits... ......................... I ............. ­ 14 Hazardous Waste or 6.14 Laws and Regulations ......................... 14 Radioactive Material._._..,.....„,..,.,19 6.15 Taxes.................„.„....,,,...,....._...14-15 8.11 Evidence ofFinancal 6.16 Use of Premises...... _.........................15 Arrangements.............................1.9 6.17 Site Cleanliness ................................. 15 6.18 Safe Structural Loading ................... _ 15 9. ENGINEER'S STATUS DURING 6.19 Record Documents 15 CONSTRUCTION....__._.,,,.,,,,,.___..._.._..........,., 19 6.20 Safety and Protection___._...__...,.15-16 9.1 OWNERsRepresentative ...............19 6.21 Safety Representative_.._ ...... 9.2 Visits to Site ..... .............. .......19 6.22 IfazardCommunication Programs._._..16 9.3 Project Representative..,_.. _ ...... 623 Emergencies......................_....... 16 9.4 Clarifications and Interpre- 6.24 Shop Drawings and Samples.. ..... 16 rations.....,......._,_,.,.,._..,....__,..... 21 9.5 Authorized Variations in Pdrk 21 in EJCDC GENERAL CONDITIONS t910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Article or Paragraph Page Article or Paragraph Page Number & Title Number Number & Title Number 9.6 Rejecting Defective Work .......... ........ 21 9.7-9.9 Shop Drawings, Change Orders and Payments........... I........... I .... I ..... . 21 9.10 Determinations for Unit Prices 21-22 9.11-9,12 Decisions on Disputes; ENGI- NEER as Initial Interpreter..............22 9.13 Limitations on ENGINEER'S Authority and Responsibilities,,,. 22-23 CHANGES IN THE WORK ....................................... 23 10.1 OWNER'S Ordered Change................23 14. 10.2 Claim for Adjustment.......................23 10.3 Work Not Required by Contract Documents ..................................... 23 10.4 Change Orders..................................23 10.5 Notification of Surety ,..... _,............. I ... 23 CHANGE OF CONTRACT PRICE -......... ....... .......... 23 11.1-11.3 Contract Price, Claim for Adjustment; Value of the Work ................................... 23 14 11.4 Cost of the Work...........................24-25 11.5 Exclusions to Cost of the Work 25 11.6 CONTRACTOR'S Fee .......................... 25 11.7 Cost Records__.....,__,,.._.............25-26 11.8 Cash Allowances .................... ...........26 11.9 Unit Price Work ................................. 26 CHANGE OF CONTRACT 'TIMES ....... _.................. 26 12.1 Claim for Adjustment .................. .....26 12.2 Time of the Essence .......... ................... 26 12.3 Delays Beyond CONTRACTOR'S Control ...................................... 26-27 12.4 Delays Beyond OWNER'S and CONTRACTOR'S Control.._._ ............ 27 TESTS AND INSPECTIONS; CORRECTION REMOVAL OR ACCEPTANCE OF DEFEC77T E WORK......._ ................ _ _....................27 13.1 Notice of Defects ................................ 27 13.2 Access to the Work 27 13.3 Tests and Inspections; CONTRACTOR'S Cooperation......... 27 13.4 OWNER's Responsibilities; Independent Testing Laboratory,......27 13.5 CONTRACTOR'S Responsibilities_ ................_., 27 13.6-13.7 Covering Work Prior to Inspec- tion, Testing or Approval ..... ........__27 13.8-13.9 Uncovering Work at ENGI- NEER s Request .....................27-28 13.10 OWNER May Stop the Work ,,,,,,,,,28 13.11 Correction or Removal of Defective Work ...........................28 13.12 Correction Period ...........................28 13.13 Acceptance ofDefective Work ........ ,28 13.14 OWNER May Correct Defective Work ..................................... 28-29 PAYMENTS TO CONTRACTOR AND COMPLETION ................................................. 29 14.1 Schedule of Values .........................29 14.2 Application for Progress Payment..................................... 29 14.3 CONTRACTOR'S Warranty of Title ........................................... 29 14.4-14.7 Review of Applications for Progress Payments .................. 29-30 14.8-14.9 Substantial Completion ..................30 14.10 Partial Utilization ......................30-31 14.11 Final Inspection ............................31 14.12 Final Application for Payment.......,31 14.13-14.14 Final Payment and Acceptance ...... _31 14.15 Waiver of Claims 1.31-32 15. SUSPENSION OF WORK AND TERMINATION ............................................... 32 15.1 OWNER May Suspend Work,...,...., 32 15.2-15.4 OWNER May Terminate ..............„32 15.5 CONTRACTOR May Stop Work or Terminate32-33 16. DISPUTE RESOLUTION.........................._..-__33 17. MISCELLANEO1JS...........................................33 17.1 Giving Notice ................................ 33 17.2 Computation of Times....................33 17.3 Notice of Claim ............................... 33 17.4 Cumulative Remedies ...................... 33 17.5 Professional Fees and Court Costs Included ............................33 17.6 Applicable State Laws ............... 33-34 Intentionally left blank ..............._._ ................ ....35 EXHIBIT GC -A: (Optional) Dispute Resolution Agreement .................... GC -Al 16.1-16.6 Arbitration ......... ................_.,GC -Al 16.7 Mediation ........................... .. GC -AI iv EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) INDEX TO GENERAL CONDITIONS City of Fort Collins modifications to the General Conditions of the Construction Contract are not shown in this index Article or Paragraph Number Acceptance of -- Bonds and Insurance ........................................ 5.14 defective Work............................10.4.1, 13.5, 13.13 final payment........................................9.12, 14.15 insurance 5.14 ........................................................... other Work, by CONTRACTOR ... ................ ......7.3 Substitutes and "Or -Equal" Items.....................6.7.1 Work by OWNER ......... ........ 2.5, 6.30, 6.34 Access to the -- Lands, OWNER and CONTRACTOR responsibilities..............................................4.1 site, related Work...............................................7.2 Work...........................................112, 1114, 14.9 Acts or Omissions--, Acts and Omissions-- CONTRACTOR.................._....._._.....6.9.1, 9.13.3 ENGINEER .......................................... 6.20, 9.13.3 OWNER................................................... 6.20, 8.9 Addenda --definition of (also see definition of Specifications) ....... (1.6, 1.10, 6.19), 1.1 Additional Property Insurances ...................... . .......... 5.7 Adjustments -- Contract Price or Contract Times ...........................1.5, 3.5, 4.1, 4.3.2, 4.5.2, .............................4.5.3, 9.4, 9.5, 10.2-10.4, .......................... ......... ...... 11,12,14.8,15.1 progress schedule ......., 6.6 ....................................... Agreement -- definition of......................................................1.2 "All -Risk" Insurance, policy form ,,,,.5.6.2 Allowances, Cash....................................................11.8 Amending Contract Documents ..............„................ 3.5 Amendment, Written -- in general................1.10, 1.45, 3.5, 5.10, 5.12, 6.6.2 ......................... . 6. 8.16.19, 10.1, 10.4, 11.2 ....................................12.1, 13.12.2, 14.7.2 Appeal, OWNER or CONTRACTOR intent to .......................... 9.10, 9.11, 10.4, 16.2, 16.5 Application for Payment-- defmition of ...... ................... . 1.3 ENGINEER's Responsibility ............................. 9.9 final payment.,,,.,.,,._..... 9.13.4, 9.13.5, 14.12-14.15 in general .......................... 2.8, 2.9, 5.6.4, 9.10, 15.5 progress payment, ....... .__..........................14.1-14.7 review of ... ..................... ............................14.4-14.7 Arbitration.....................................................1.6.1-16.6 Asbestos -- claims pursuant thereto ............. 4.5.2, 4.5.3 CONTRACTOR authorized to stop Work, . .....4.5.2 definition of........_ ...............__....._.......,. ... Article or Paragraph Number OWNER responsibility for..............................4.5.1, 8.10 possible price and times change ........................4.5.2 Authorized Variations in Work......... 3.6, 6.25, 6.27, 9.5 Availability of Lands..........................................4.1, 8.4 Award, Notice of--defined.......................................1.25 Before Starting Constructton,,,,,__, ..._2.5-2.8 Bid --definition of........................1.5 (1.1, 1.10, 2.3, 3.3, ............. 4.2.6.4, 6.13, 11.4.3, 11.9.1) Bidding Documents --definition of._......._..._.............._..................1.6(6.8.2) Bidding Requirements--defmition of......................................1.7 (L 1, 4.2.6.2) Bonds -- acceptance of....................................................5.14 additional bonds........„........................IO.5, 11.4.5.9 Cost of the Work ..................................._.......11.5.4 definition of.......................................................1.8 delivery of...............................I...................2.1, 5.1 final Application for Payment ....... .......... 14.12-14.14 general ...................................... 1.10, 5.1-5.3, 5.13, ........................................9.13, M5, 14.7.6 Performance, Payment and Other ......... ........... 5.1-5.2 Bonds and Insurance --in general.................................5 Builder's risk "all-risk" policy form......,., ................ 5.6.2 Cancellation Provisions, Insurance,,...... 5.4.11, 5.8, 5.15 Cash Allowances....................................................11.8 Certificate of Substantial Completion, ........ 1.38, 6.30.2.3, ..................... ..... .- ... 14.8, 14.10 Certificates ofInspection .............. ..... 9.13.4, 13.5, 14.12 Certificates of Insurance..............2.7, 5.3, 5.4.11, 5.4.13, ........I .............. 5.6.5, 5.8, 5.14, 9,13.4, 14.12 Change in Contract Price -- Cash Allowances .......................................... _..,11.8 claim for price adjustment,,,,,-...... 4.1, 4.2.6, 4.5, 5.15, 6.8.2, 9.4 _.... I ........ 9.5, 9.11, M2, 10.5, 11.2, 139, ..............- ... 13.13, 13.14, 14.7, 15.1, 15.5 CONTRACTOR's fee... ........ ... .................. 11.6 Cost of the Work general...............................................11.4-1 L7 Exclusions to,.... ........ ..................... 11.5 Cost Records .......... ............ _.................... _ 11.7 in general,,,,,,..._._ 1.19, 1.44, 9.11, 10.4.2, 10.4.3, 11 Lump Sum Pricing ._........... . ...... ..... _.._ ...11.3.2 Notification of Surety. _. _ _ _ _.... _ . _ _ _ _ _ . ........ . . . . . ....10.5 Scope Of. .... ....... _.. ......... .............. _._. ,10.3-10.4 Testing and Inspection, Uncovering the Work ................. .................13.9 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9199) Construction Document Ordering Instructions (Download a complete P1anWell 4.0 Ordering Guide from www.planwell.com) 1. GO TO: www.mercury-ldo.com 2. SELECT: Denver Links: "Plan Well" We have locations In Las Vegas e.M Dane... Please select the lotatlon near you. Lestav'... v links V Plan Well° m, wad s] ...EM c] 3. SELECT: Public Planroom: "GO" Denver Links Mercury/LDO Colorado [rgpri p„aptmis. hprI q h Planlfe Digital Document Management & Distribution User :rm¢ ' P User Name find Public isratscte rW bddu g sere( b 9 ` ,7 "�" Password No login pwqulred folaetymll aasswanl? nr�a j Not a memaar yet? Vigo It � kutljar;zed Acccse 4rdy^, 4. SELECT: the desired "Project Number" from the list 07/2001 Section 00020 Page 3 Unit Price Work... I ............................ I ....... ­11.9 Article or Paragraph Number Value of Work..................................................11.3 Change in Contract Times -- Claim for times adjustment ........ 4.1, 4.2.6, 4.5, 5.15, .,........ 6.8.2, 9.4, 9.5, 9.11, 10.2, 10.5, 12.1, ...... _.13.9,13.13,13,14,14.7,15.1,15.5 Contractual time limits.....................................12.2 Delays beyond CONTRACTOR'S control........................................................12.3 Delays beyond OWNER'S and CONTRACTOR's control ............................ 12.4 Notification of surety.........................................10.5 Scope of change ............................ I ........ ...10.3-10.4 Change Orders -- Acceptance of Defective Work ..........................13.13 Amending Contract Documents, .........................3.5 Cash Allowances..............................................11.8 Change of Contract Price .. ............ _... ................. 11 Change of Contract Times ............................. .... 12 Changes in the Work ......................................... 10 CONTRACTOR's fee ........................................ 11.6 Cost of the Work.. ...... ....... ................ 11.4-11.7 Cost Records ............ 11.7 definitionof ..................... ................ ........ ......_.1.9 emergencies.....................................................6.23 ENGTNEER's responsibility......, 9.8, 10.4, 11.2, 12.1 execution of ....................................................... 10.4 Indemni6ction 6.12, 6.16, 6.31-6.33 Insurance, Bonds and„....................5.10, 5.13, 10.5 OWNER may terminate _..... ... _15.2-15.4 OWNER's Responsibility, ............ ...... .... _J.6, 10.4 Physical Conditions -- Subsurface and .............................................. 4.2 Underground Facilities--............................4.3.2 Record Documents ..,... _. .............................. 6.19 Scope of Change, ...... ............ 10.3-10.4 Substitutes ............. . 6.7.3, 6.8.2 Unit Price Work 11.9 value of Work, covered by................................11.3 Changes in the Work.................................................10 Notification of surety ....... ... ................. .. ...........10.5 OWNER's and CONTR4CTOR's responsibilities ................................. .... Right to an adjustment........... , _...... 02 _ _....., __.. _ . 10.2 Scope of change......... ....... .10.3-10.4 Claims -- against CONTRACTOR..... ........... .........6.16 against ENGINEER..,, _. _... _....6.32 against OWNER .................... . ......... ............ .6.32 Change of Contract Price ................ I ......... _ 9.4, 11.2 Change of Contract Times ._ ......... ,.__, 9A, 12.1 CONTRACTOR's.............41 7.1, 9-4, 9.5, 9.11, 10.2, ...........................11.2, 11.9, 12.1, 13.9, 14.8, _...._._.............._...._..15.1, vl 15.5, 17.3 CONTRACTOR's Fee .................... _..............-... 11.6 Article or Paragraph Number CONTRACTOR s liability ........... 5.4, 6.12, 6.16, 6.31 Cost of the Work_.....................................11.4, 11.5 Decisions on Disputes ........................... ._--9.11, 9.12 Dispute Resolution .. ...... ............... _.............. _ ...16.1 Dispute Resolution Agreement .................. 16.1-16.6 ENGINEER as initial interpretor .......................2.11 Lump Sum Pricing.........................................11.3.2 Notice of ............................................................. 17.3 OWNER's................... 9.4, 9.5, 9.11, 10.2, 11.2, 11.9 ................... ..12.1,13.9,13.13,13.14,17.3 OWNER'sliability.............................................. 5.5 OWNER may refuse to make payment ,......... _. _. _ 14.7 Professional Fees and Court Costs Included.....................................................17.5 request for formal decision on............................9.11 Substitute Items.............................................6.7.1.2 Time Extension 12.1 Time requirements ,,,,,,,,9.11, 12.1 Unit Price Work.............................„...,..,,,...,,11.9.3 Valueof .................................................. 1.1.3 Waiver of --on Final Payment....... .......14.14, 14.15 Work Change Directive.....................................10.2 written notice required,_ ...... ._... ..... 9.11, 11.2, 12.1 Clarifications and Interpretations............ 3.6.3, 9.4, 9.I1 CleanSite............................................................6.17 Codes of Technical Society, Organization or Association ................................................. 3.3.3 Commencement of Contract Times ..........................2.3 Communications -- general .................... ...................... .... 6.2, 6.9.2, 8.1 Hazard Communication Programs... .................... 6.22 Completion -- Final Application for Payment .........................14.12 Final Inspection .................................. ............ 14.11 Final Payment and Acceptance ............... 14.13-14.14 Partial Utilization14.10 Substantial Completion..... .......... _1 38, 14.8-14.9 Waiver of Claims ................... ................„.,..,,,14.15 Computation of Times,.,_„_....._........_._.,,,17.2.1-17.2.2 Concerning Subcontractors, Suppliers and Others .................................................. 6.8-6.11 Conferences -- initially acceptable schedules ........ . .......... __._..... .9 preconstruction. 2.8 Conflict, Error, Ambiguity, Discrepancy-- CONTRACTOR toReport.................._,,,....20, 3.3.2 Construction, before starting by CONTRACTOR............................................2.5-2.7 Construction Machinery, Equipment, etc, ...... ........ _6.4 Continuing the Work ............... 6.29, 10.4 Contract Documents -- Amending..........................................................3.5 Bonds. ........................._.............5.1 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Cash Allowances... ......... ....... I.........................11.8 Article or Paragraph Number Change of Contract Price .................................... 11 Change of Contract Times.. ......... ....................... 12 Changes in the Work ,,,,,,,,,,,,,,,,,,,,,,,,,10.4-10.5 check and verify, ................................................ 2.5 Clarifications and Interpretations ........................ 3.2, 3.6, 9.4, 9.11 definition of....................................................1.10 ENGINEER as initial interpreter of,,,,,,,,,,,,,,,,,, 9.11 ENGINEER as OWNER'S representative, ............. 9.1 general3 Insurance...........................................................5.3 Intent........................................................3.1-3.4 minor variations in the Work OWNER's responsibility to furnish data ... I ........... 8.3 OWNER's responsibility to make prompt payment .................. .,..... 8.3, 14A, 14.13 precedence,,,,, ... .1, 3.3.3 Record Documents ..... .. ..... ................................6.19 Reference to Standards and Specifications of Technical Societies ................................... 3.3 Related Work..............._...._......._..._.._............7.2 Reporting and Resolving Discrepancies........ 2.5, 3.3 Reuse of-_- ...- __...._.3.7 Supplementing.................................................. 3.6 Termination of ENGINEER's Employment .......... 8.2 Unit Price Work ................................................. 11.9 variations .......................................... 3.6, 6.23, 627 Visits to Site, ENGINEERs ............................... 9.2 Contract Price -- adjustment of,,,,,,,,,,,,,,,, 3.5, 4.1, 9.4, 10.3, 11.2-11.3 Changeof...........................................................11 Decision on Disputes........................................9.11 definition of 1.11 Contract Times -- adjustment of ........ .................. 4.1, 9.4, 10.3, 12 Change of ............................ ....... ............. 112.1-12.4 Commencement of .......................................... _.2.3 definition of....................................................1.12 CONTRACTOR -- Acceptance of Insurance... ......... I ....................... 5.14 Communications.. .... ................... ............ 6.2, 6.9.2 Continue Work ............. ........ ...._._... .......6.29, 10.4 coordination and scheduling...........................6.9.2 definition of ....................................................... 1.13 Limited Reliance on Technical Data Authorized May Stop Work or Terminate ....................... .....1.5.5 provide site access to others... I.........._...,,,..7.2, 13.2 Safety and Protection,,,,,,,,,,,,,,,,,,, 4.3.1.2, 6.16, 6.18, I—— ..... ......... .....6.21-6.23. 7.2, 132 Shop Drawing and Sample Review Prior to Submittal ............. 6.25 hi Stop Work requirements..................................4.5.2 CONTRACTOR's- Article or Paragraph Number Compensation ........... .............................. ...11.1-11.2 Continuing Obligation.....................................14.15 Defective Work ............................. 9.6, 13.10-13.14 Duty to correct defective Work ............... _......... 13.11 Duty to Report -- Changes in the Work caused by Emergency ..................... I ...... I .............. 6.23 Defects in Work of Others ............................... 7.3 Differing conditions... ................................ 4.2.3 Discrepancy in Documents,,,,,,,, 2.5, 3.3.2, 6.14.2 Underground Facilities not indicated.,,.....,, 4.3.2 Emergencies... ......... ...... ................ ................. 6.23 Equipment and Machinery Rental, Cost of the Work...........................................11.4.5.3 Fee --Cost Plus11.4.5.6, 11.5.1, 11.6 General Warranty and Guarantee _....... . . .... 6.30 Hazard Communication Programs ......................6.22 Indemnification ............ ............ 6.12, 6.16, 6.31-6.33 Inspection of the Work............ ...............7.3, 13.4 Labor, Materials and Equipment....... _......... ..6.3-6.5 Laws and Regulations, Compliance by............ 6.14.1 Liability Insurance.. .,.,,,_.,.., .... I..,._ ... ,.5A Notice of Intent to Appeal ... ....... ................9.10, 10.4 obligation to perform and complete theWork....................................................6.30 Patent Fees and Royalties, paid for by................6.12 Performance and Other Bonds 5.1 Permits, obtained and paid for by ...... ............... 0.13 Progress Schedule ............................ .6, 2.8, 2.9, 6.6, ........................................6.29, 10.4, 15.2.1 Request for formal decisionon disputes..............9.11 Responsibilities -- Changes in the Work..................................10.1 Concerning Subcontractors, Suppliers and Others ........................... _........,6.8-6.11 Continuing the Work ..........................6.29, 10.4 CONTRACTOR's expense .................... 6.7.1 CONTRACTOR's General Warranty and Guarantee.......................................6.30 CONTRACTOR's review prior to Shop Drawing or Sample submittal,,,,,.,..,_.,,., 6.25 Coordination of Work........ ___..6.9.2 Emergencies ............. .................................. 6.23 ENGINEER'S evaluation, Substitutes or "Or -Equal" Items, ........................ ..... .7.3 For Acts and Omissions of Others ,.,,.,......_. ............6.9.1-6.9.2, 9.13 for deductible amounts, insurance...................5.9 general ._.._... ..... ,._._61 72, .......... 7.3, 8.9 Hazardous Communication Programs.,........6.22 Indemnification ....................... _....... .._ 6.31-633 ESCDC GENERAL CONDITIONS 1910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICA-11ONS (REV 9/99) Labor, Materials and Equipment, ... ..........6.3-6.5 CONTRACTORS --other ..... ........ __.................. 11... I ... 7 Laws and Regulations ......... ...........6.14 Contractual Liability Insurance.. ......... .....5..4.10 Liability Insurance ........................................ 5.4 Contractual Time Limits ...... ....,.,........... ................ 12.2 Article or Paragraph Article or Paragraph Number Number Notice of variation from Contract Coordination-- Documents...........................................6.27 CONTRACTOR sresponsibility .............. _....... 6.9.2 Patent Fees and Royalties ..............................6 12 Copies of Documents............................................... 2.2 Permits ...................................................... 6.13 Correction Period .............................._...... ...... ....... 13.12 Progress Schedule ......................................... 6.6 Correction, Removal or Acceptance Record Documents 6.19 of Defective Work -- related Work performed prior to in general ......... ............._....... ,.10.4.1, 13.10-13.14 ENGINEERS approval of required Acceptance of Defective Work ..........................13.13 submittals.............................................6.28 Correction or Removal of safe structural loading ............ 1.1- .......... _._,.6.18 Defective Work._.._...........................6.30, 13.11 Safety and Protection_.I....... I .......... 6.20,Z2,13.2 Correction Period13.12 Safety Representative .................. _........._....6.21 OWNER May Correct Defective Work.,....___,,.,13.14 Scheduling the Work ........ _ 6.9.2 OWNER May Stop Work ..... ........ ........13.10 Shop Drawings and Samples.. 6.24 Cost -- Shop Drawings and Samples Review of Tests and Inspections.. ................. ....... I ......... 13.4 by ENGINEER......................._.„....,.,,,,6.26 Recordsll.7 Site Cleanliness ..........................................6.17 Cost of the Work -- Submittal Procedures...................................6.25 Bonds and insurance, additional .................. _11.4.5.9 Substitute Construction Methods Cash Discounts.. „_.._11.4.2 and Procedures.._....,,,. _...__......__._.__6.7.2 CONTRACTORsFee .....,,.,.,_,.,._._..._...........11.6 Substitutes and "Or-Equal"Items ._........._.6.7.1 Employee Expenses ........... .......... Superintendence,.,_ ......... .......... ,_._...... 0.2 Exclusions to „11.5 Supervision ...................................... ......... ._6.1 General 11.4-11.5 Survival of Obligations...._..._,_ ... ....... .......... 6.34 Home office and overhead expenses ...... _............. 11.5 Taxes 6.15 Losses and damages ... . ..... ......... .......11.4.5.6 Tests and Inspections... ................................ 13.5 Materials and equipment ............... _................ 11.4.2 To Report ., ........ . _........... .5 Minor expenses.. 11.4.5.8 Use of Premises .....................6.16-6.18, 6.30.2.4 Payroll costs on changes, .......... _. ..............._11.4.1 Review Prior to Shop Drawing or performed by Subcontractors ................. ........ _11.4.3 Sample Submittal ....................................... 6.25 Records 11.7 Right to adjustment for changes in the Work....,10.2 Rentals of construction equipment right to claim ............. 4, 7.1, 9.4, 9.5, 9.11, 10.2,11.2, and machinery.......................................11.4.5.3 11.9, 12.1, 13.9, 14.8, 15.1, 15.5, 17.3 Royalty payments, permits and Safety and Protection .................6.20-6.22, 7.2, 13.2 license fees ,.,.,,,,......... ,.,.,,....__..._..._ 11A.5.5 Safety Representative.,, _ ..... .......6.21 Site office and temporary facilities........ Shop Drawings and Samples Submittals ..... 6.24-6.28 Special Consultants, CONTRACTORs............ ..._.11.4.5.2 11.4.4 Special Consultants ....... I I ....................... -- ... 11.4.4 Supplemental ......... .- .... I............................. Substitute Construction Methods and Procedures_6.7 Taxes related to the Work..,.....„.,,,...._......„1,1.4.5A Substitutes and "Or -Equal" Items, Tests and Inspection............ I ............... ..........._ 13.4 Expense...........................................6.7.1, 6.7.2 Trade Discounts ......................................... Subcontractors, Suppliers and Others, „..„_..6.8-6.11 Utilities, fuel and sanitary facilities ..............11.4.5.7 ....11.4.2 Supervision and Superintendence ..,_..._6.1, 6.2, 6.21 Work after regular hours................___._._...__11.4.1 Taxes, Payment by ........ ............. .............. ....... 6.15 Covering Work .................................. Use of Premises ........__....___....._........ ..... ..... ........13.6-13.7 Cumulative Remedies..._,.,,.__..._....._,,, Warranties and guarantees ..... _.... 6.5, 6.30 Cutting, fitting and patching_,_,. .17.4-17.5 7.2 Warranty of Title .........................._....... .,_._...... 14.3 Data, to be furnished by OWNER ........... ......., 8.3 Written Notice Required-- Day --definition of ............................................. 17.2.2 CONTRACTOR stop Work or terminate........15.5 Decisions on Disputes_ ................._.............. 9.11, 9.12 Reports of Differing Subsurface defective --definition of ......... ...._.. and Physical Conditions ....................... 4.2.3 defective Work_ ......_1.14 Substantial Completion ... ........ .._.................14.8 Acceptance of ......................... ............ 0,4.1,13.13 Via EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Correction or Removal of..................__10.4.1, 13.11 Correction Period .............. _.................... I......13.12 in general, ........................................ 13, 14.7, 14.11 Article or Paragraph Number Observation by ENGINEER ................................ 9.2 OWNER May Stop Work ................. . _ ..I..........13.10 Prompt Notice of Defects..................................13.1 Rejecting...........................................................9.6 Uncovering the Work.......................................13.8 Definitions ................................................................ 1 Delays......................................4.1, 6.29, 12.3-12.4 Delivery of Bonds ..................................................... 2.1 Delivery of certificates of insurance........... I................2.7 Determinations for Unit Prices .................................. 9.10 Differing Subsurface or Physical Conditions-- Notice of........................................................... 4.2.3 ENGINEER's Review ...................................... 4.2.4 Possible Contract Documents Change...............4.2.5 Possible Price and Times Adjustments ,.,,,,,,.„...4.2.6 Discrepancies -Reporting and Resolving................................2.5, 3.3.2, 6.14.2 Dispute Resolution -- Agreement ............................... _...... _.....16.1-16.6 Arbitration ........................ _................... _ 16.1-16.5 genera116 Mediation........................................................16.6 Dispute Resolution Agreement.........................16.1-16.6 Disputes, Decisions by ENGINEER. I ........... I ..... .11-9.12 Docum ents-- Copiesof...........................................................2.2 Record 6.19 Reuseof............................................................ 3.7 Drawings --definition of ................. .......... _....._....1.15 Easements ............................................................. 4.1 Effective date of Agreement -- definition of..............1.16 Emergencies........................................................6. 23 ENGINEER -- as initial interpreter on disputes ,,...... _...... .11-9.12 definition of... .... .........................................1.17 Limitations on authority and responsibilities..... 9.13 Replacement of ......................... 8.2 Resident Project Representative..,_,... „.„.......„...9.3 ENGINEER's Consultant -- definition of ..................... 1.18 ENGINEER's-- authority and responsibility, limitations on, ........ 9.13 Authorized Variations in the Work ....................... 9.5 Change Orders, responsibility for,,,_,_.9.7, 10, 11, 12 Clarifications and Interpretations .... .. .. . .... 3.6.3, 9.4 Decisions on Disputes.. . .......... . . .... . .. ..... ... 9.11-9.12 defective Work, notice of.....................„._._......13.1 Evaluation of Substitute Items...... 6.7.3 Liability..._ ............................................ 6.32, 9.12 Notice Work is Acceptable... I ... ........... ......... .14,13 Observations............................................6.30.2, 9.2 OWNER's Representative... _ _. . ........... . . _... _......9.1 Payments to the CONTRACTOR Responsibility for.....................................9.9, 14 Recommendation of Payment ....................14.4, 14.13 Article or Paragraph Number Responsibilities --Limitations on ............... 9.11-9.13 Review of Reports on Differing Subsurface and Physical Conditions ........ ........ I ....... _.... 4.2.4 : Shop Drawings and Samples, review responsibility .............................................. 6.26 Status During Cmstruction-- authorized variations in the Work.................9.5 Clarifications and Interpretations.,,,,, 9.4 Decisions on Disputes .,,,_,...._,.,._......, 9.11-9.12 Determinations on Unit Price ........................ 9.10 ENGINEER as Initial Interpreter .......... 9.11-9.12 ENGINEER's Responsibilities ... I ...... ...... 9.1-9.12 : Limitations on ENGINEERS Authority and Responsibilities . ... ..... .. ..... . ...... ....... 9.13 OWNER'sRepresentative ............ ...._. ...9.1 Project Representative..................................9.3 Rejecting Defective Work„ , „....9.6 Shop Drawings, Change Orders and Payments ...... ........................... 9.7-9.9 Visits to Site ............... _.................. _............9.2 Unit Price determinations .................9.10 Visits to Site.......................................................9.2 Written consent required . .... ..... .. ....... ..... ...... 7.2, 9.1 Equipment, Labor, Materials and ................ ......... .3-6.5 Equipment rental, Cost of the Work .................. 11.4.5.3 Equivalent Materials and Equipment. . ....... . ........ .... .. 6.7 error or omissions_....................._..._...................6.33 Evidence of Financial Arrangements .......................8.11 Explorations of physical conditions ........................4.2.1 Fee, CONTRACTOR's--Costs Plus..,.,... __ _ _........ _...11.6 Field Order -- definition of.....................................................1.19 issued by ENGINEER .............. 3.6.119.5 Final Application for Payment ... ..................... _...... 14.12 Final Inspection ........................................... _.....14.11 Final Payment -- and Acceptance.,.__..................._._..,,._..14.13-14.14 Prior to, for cash allovances ................................ 11.8 General Provisions_................................._....,17.3-17A General Requirements -- definition of............._.....................................1.20 principal references to..............2.6, 6.4, 6.6-6.7, 6.24 Giving Notice.........................................................17.1 Guarantee of Work --by CONTRACTOR...... 6.30, 14.12 Hazard Communication Programs.., ........ _.......... .... .22 Hazardous Waste -- definition of... .............. ................... .. .. ... .... ._..1.21 genera] .............................................................. 4.5 OWNER's responsibility for ..... ...... .........._..._ 8.10 EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION w! CITY OF FORT COLLINS MODIFICATIONS tREV 9199) Indemnification.............................0..12, 6.16, 6.31-6.33 Initially Acceptable Schedules...................................2.9 Inspection -- Certificates of ..............................9 13.4, 13.5, 14.12 Final ................................ 14.11 Article or Paragraph Number Special, required by ENGINEER ......................... 9.6 Tests and Approval ....... .... . .... &3, 13.3-13.4 Insurance -- Acceptance of, by OWNER...............................5.14 Additional, required by changes in the Work............................................11.4.5.9 Before starting the Work................................1... 2.7 Bonds and --in general... . ........... ........................... 5 Cancellation Provisions ....................................... 5.8 Certificates of .................. 2.7, 5, 5.3, 5.4.11, 5.4.13, 5.6.5, 5.8, 5.14, 9.13.4, 14.12 completed operations„ I I ................................. 5.4.13 CONTRACTOR's Liability..................................5.4 CONTRACTOR's objection to coverage.............5.14 Contractual Liability ......................................5.4.10 deductible amounts, CONTRACTOR's responsibility. . ....... ___ ..... ... ....................... 5.9 Final Applicaion for Payment. ,,,_........... .......14.12 Licensed Insurers ................................................ 5.3 Notice requirements, material changes ........ 5.8, 10.5 Option to Replace .......................................... ............................ .._. 5.14 insurances other special . ... ............................. 5.10 OWNER as fiduciary for insureds..............5.12-5.13 OWNER's Liability ............................................ 5.5 OWNER's Responsibility_.............._.................,8.5 Partial Utilization, Property Insurance, ... ,...... 1,,, 5.15 Property.................................................... 5.6-5.10 Receipt and Application of Insurance Proceeds.............................................. 5.12-5.13 Special Insurance ............................................. 5.10 Waiver of Rights................................I.............5.11 Intent of Contract Documents 3.1-3.4 Interpretations and Clarifications .....................3.6.3, 9.4 Investigations of physical conditions .......................... 4.2 Labor, Materials and Equipment..........................6.3-6.5 Lands -- and Easements.........................................I.........8.4 Availability of.............................................4.1, 8.4 Reports and Tests...............................................8.4 Laws and Regulations --Laws or Regulations-- Bonds........................................................5.1-5.2 Changes in the Work... ......................... I'll .... 10.4 Contract Documents 3.1 CONTRACTOR's Responsibilities ... ....... ...........6.14 Correction Period, defective Work......... .................... 13.12 Cost of the Work, taxes..................._..__....11.4.5A definition of ....................... ............................. 1.22 genera16.14 Indemnification ....................................... 6.31-6.33 Insurance ................... _................................ _....5.3 Precedence................................................3.1, 3.3.3 Reference to....................................................3.3.1 Safety and Protection................................6.20, 13.2 Subcontractors, Suppliers and Others ............ 6.8-6.11 Article or Paragraph Number Tests and Inspections...................................13.5 Use of Premises.. ¢.16 Visits to Site.......................................................9.2 Liability Insurance-- CONTRACTORs............................................... 5.4 OWNER'S 5.5 Licensed Sureties and Insurers............ ...................... 5.3 Liens -- Application for Progress Payment.... _..... _ _. _.... _ _.14.2 CONTRACTOR's Warranty of Title ............. ..... ,14.3 Final Application for Payment ...... I ...... I ............ 14.12 definition of,,,,., , .1 23 Waiver of Claims14.15 Limitations on ENGINEER's authority and responsibilities ..................................... ............ 9.13 Limited Reliance by CONTRACTOR Authorized._ .................................._...- - .4.2.2 Maintenance and Operating Manuals -- Final Application for Payment., ...... _. _... ......... . 1.4.12 Manuals (of others)-- Precedence................................................... 3.3.3.1 Reference to in Contract Documents .................... 3.3.1 Materials and equipment -- furnished by CONTRACTOR .............................. 6.3 not incorporated in Work ._....._._.._..,..,.......__.14.2 __ _ Materials or equipment --equivalent ,,,,.,, _.....6.7 Mediation (Optional)..............................................16.7 Milestones--de£mition of........................................1.24 Miscellaneous— Computation of Times .............................__......_ 17.2 Cumulative Remedies, ............. . .. . .... _ _............. _ 17.4 Giving Notice...................................................17.1 Notice of Claim.................................................17.3 Professional Fees and Court Costs Included..... _.17.5 Multi -prime contracts ...................................... _........, 7 Not Shown or Indicated.........................................4.3.2 Notice of -- Acceptability of Project . . .. ........ ............. ...........14.13 Award, definition of .................__....... ,.....,..,,... 1.25 Claim............................................................17.3 Defects, 13.1 Differing Subsurface or Physical Conditions....., Giving 17.1 Tests and Inspections........................................13.3 Variatioq Shop Drawing and Sample... ........6.27 Notice to Proceed -- definition of.....................................................1.26 givingof.... ................................. ................... 2.3 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Notification to Surety..............................................10.5 Observations, by ENGINEER...........................0.30. 9.2 Occupancy of the Work ................... 5,15, 6.30.2-4, 14.10 Omissions or acts by CONTRACTOR....... _......6.9, 9.13 Open Peril policy form, Insurance .........................5.6.2 Option to Replace .............................._................... 5.14 Article or Paragraph Number "Or Equal" Items......................................................6.7 Other work 7 Overtime Work --prohibition of „....................... ....... 6.3 OWNE12-- Acceptance of defective Work ..........................13.13 appoint an ENGINEER ...................................... 8.2 as fiduciary... . ....... .................................. 5.12-5.13 Availability of Lands, responsibility....................4.1 definition of ...... ................................................. 127 data, furnish......................................................8.3 May Correct Defective Work...........................13.14 May refuse to make payment.............................J4.7 May Stop the Work.........................................13.10 May Suspend Work, Terminate ...........................8.8, 13.10, 15.1-15.4 Payment, make prompt.....................8.3, 14.4, 14.13 performance of other work .................................. 7.1 permits and licenses, requirement s,.... __.......... 6.13 purchased insurance requirements............ OWNER's-- Acceptance of the Work ... ,...,......... ..............6.30.2.5 Change Orders, obligation to execute ........... .6, 10.4 Communications ................................................. 8.1 Coordination of the Work 7.4 Disputes, request for decision............................9.11 Inspections, tests and approvals..................8.7, 13.4 Liability Insurance..............................................5.5 Notice of Defects ............................................... 13.1 Representative --During Construction, ENGINEFR's Status ...................................... 9.1 Responsibilities_ Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material ................. 8A0 ChangeOrders..............................................8.6 Changes in the Work._................................10.1 communications 8.1 CONTRACTOR's responsibilities ........ ... ... .... 8.9 evidence of financial arrangements8.11 inspections, tests and approvals .......... _, 8.7 insurance...................................................... 8.5 lands and casements ..................................... 8.4 prompt payment by....... _ _.............. _ _.......... 8.3 replacement of ENGINEER...... _.... _ _.. _ ........8.2 reports and tests., .... ......... ......... ....... ...... 8.4 stop or suspend Work., ................8.8, 13.10, 15.1 terminate CONTRACTOR's services ......... ........................... ..... .8, 152 separate representative at site .................. ............93 testing, independent., use or occupancy of the Work ......................... written consent or approval required .............................. 13.4 .5.15, 6.30.2.4, 14.10 ........... 9.176.3, 11.4 Xi EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICA'nONB (REV 9/99) Article or Paragraph Number written notice required ........................7.1, 9.4, 9.11, ....................................11.2, 11.9, 14.7, 15.4 PCBs-- defrution of.....................................................L29 general........................................................... ... 4.5 OWNER's responsibility for...............................8.10 Partial Utilization— definition of.....................................................1.28 general 6.30.2.4, 14.10 Property Insurance ............................................ 5.15 Patent Fees and Royalties ....................................... 6.12 Payment Bonds .................... .....5.1-5.2 Payments, Recommendation of..............14.4-14.7, 14.13 Payments to CONTRACTOR and Completion -- Application for ProgressPayments ......................14.2 CONTRACTOR's Warranty of Title. ...._..... _.... , _ 14.3 Final Application for Payment..........................14.12 Final Inspection..............................................14.11 Final Payment and Acceptance... ............ 14. 13-14. 14 general........................................................ 8.3, 14 Partial Utilization ............................................ 14.10 Retainage.................................................I ........14.2 Review of Applications for Progress Payments ............................... .................. prompt payment._....._.....__..----...._ ...................8.3 Schedule of Values .......................................... 14.1 Substantial Completion ,,,,,,.,,.I .......... I ......... 4.8-14.9 Waiver of Claims ......................... ...... .. ....... .....14.15 when payments due................................14.4, 1413 withholding payment.,. .... ..............14.7 Performance Bonds .......... I ......... ...... ......... ....... Perm its .............................................................. 6.13 Petroleum-- defmition of 1.30 general..............................................................4.5 OWNF,R's responsibility for...............................8.10 Physical Conditions -- Drawings of, in or relating to.. . ...... .............. 4.2.1.2 ENGINEER's review ......................................... 4.2.4 existing structures...........................................4.2.2 general4.2.1.2.................................................. Notice of Differing Subsurface or,,,,,,,,,,,„ 4.2.3 Possible Contract Documents Change ....... ..... .... 4.2.5 Possible Price and Times Adjustments_...__ ... I ... .2.6 Reports and Drawings ..... . . ... ... . ... ........ .............4.2.1 Subsurface and,. ........................... ....................................... .4.2 Subsurface Conditions 4.2.1.1 Technical Data, Limited Reliance by CONTRACTOR Authorized... _.. _.... _........ Underground Facilities -- general................ _.......... __..................... _. 4.3 Not Shown or Indicated ................................ 4.3.2 Protection of.........................................4.3, 6-20 xii Article or Paragraph Number Shown or Indicated................................................4.3.1 Technical Data ................................................ 4.2.2 Preconstruction Conference 2.8 Preliminary Matters .................................. _.................2 Preliminary Schedules. ........... ......................... ....... 2.6 Premises, Use of ............................................. 6.16-6.18 Price, Change of Contract...........................................II Price, Contract --definition of _ ................................ 1.11 Progress Payment, Applicationsfor ..........................14.2 Progress Payment--retainage...................... .......... . 14.2 Progress schedule, CONTRACTOR's............. 2.6, 2.8, 2.9, ..... -„ 6.6, 6.29, 10.4, 15.2.1 Project --definition of, ............. ... ............................. .1.31 Project Representative— ENGINEER's Status During Construction ...,,._... .9.3 Project Representative, Resident--defmition of ... _..... 1.33 prompt payment by OWNED.....................................8.3 Property Insurance -- Additional .........................................................5.7 general5.6-5.10 Partial Utilization................................5.15, 14.10.2 receipt and application of proceeds ,,,. ... I .... 5.12-5.13 Protection, Safety and ...........................6.20-6,21, 13.2 Punch list ............................................................ 14.11 Radioactive Material-- defrition of......................................................1.32 general4.5 OWNER's responsibility for...............................$.10 Recommendation of Payment.................14.4, 14.5, 14.13 Record Documents.., ........ .............6.19, 14.12 Records, procedures for maintaining, .......... . ...... 2.8 Reference Points......................... ............................... 4.4 Reference to Standards and Specifications of Technical Societies .......................................... 3.3 Regulations, Laws and(or)...................... I...............6.14 Rejecting Defective Work .............. I...........................9.6 Related Work -- atSite .................. ............ ........ .................. 7.1-7.3 Performed prior to Shop Drawings and Samples submittals review....................6.28 Remedies, emulative .............. ........................17.4, 17.5 Removal or Correction ofDefective Work................13.11 rental agreements, OWNER approval required., ... 11.4.5.3 replacement of ENGINEER, by OWNER,,,,,,,,,,,,,,,,,,,, 3.2 Reporting and Resolving Discrepancies................................2.5, 3.3.2, 6.14.2 Reports -- and Drawings ................................................. 4.2.1 and Tests, OWNER'sresponsibility._ .................8.4 Resident and Project Representative -- definition of....................................................1.33 provision for.. .................................. ....... _ .............. 93 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Article or Paragraph Number Resident Superintendent, CONTRACTOR'S ............... 6.2 Responsibilities-- CONTRACTOR's-in general..................................6 ENGINEER's-in general........................................9 Limitations on.............................................9.13 OWNER's-in general..............................................8 Retainage........ ............ ........................ I ....... I ........ 14.2 Reuse of Documents ................................................. 3.7 Review by CONTRACTOR: Shop Drawings and Samples Prior to Submittal .........................6,25 Review of Applications for Progress Payments .................................... 14.4-14.7 Right to an adjustment.._........................................10.2 Rightsof Way ...... ............................ ........................+1 Royalties, Patent Fees and.................................I..6.12 Safe Structural Loading......,,,................................. 6.18 Safety -- and Protection................................4.3.2, 6.16, 6.18, ..... 6.20-6.21, 7.2, 13.2 general .................................................... 6.20-6.23 Representative, CONTRACTOR's......__. ,.. _.,._„6.21 Samples -- definition of ............ .......................... ........ ....... 1,34 general .................................................... 6.24-6.28 AC Review by CONTRACTOR ....... ........................6.25 Review by ENGINEER.............................626, 6.27 related Work .................................................... 6.28 submittal of ..................................................... 6.24.2 submittal procedures..........................................6.25 Schedule of progress ...... .............. _...... 2.6, 2.8-2.9, 6.6, .... I ....................... ........6.29, 10.4, 15.2.1 Schedule of Shop Drawing and Sample Submittals .......... 2 ................6, 2.8-2.9, 6.24-6.28 Schedule of Values..............................2.6, 2.8-2.9, 14.1 Schedules -- Adherence to..................................................15.2.1 Adjusting...........................................................6.6 Change of Contract Times.................................10.4 Initially Acceptable......... _._,.. 2.8, 2.9 Preliminary ...................................... ............. ..... 2.6 Scope of Changes......................................10.3-10.4 Subsurface Conditions 4.2.1.1 Shop Drawings -- and Samples, general ................................ 6.24-6.28 Change Orders & Applications for Payments, and ..... ...................... definition of, ... I .... _..._ ___..._. ..... ._.__1.35 ENGINEER's approval of .. . .... .. ......... ... ............3.6.2 ENGINEER's responsibility for review, . _ _ _ ............... .............. . 9. 7, 6.24-6.28 related Work.................................................... 6.28 review procedures...........................I....2.8, 6.24-6.28 Article or Paragraph Number submittal required.............................I.................6.24.1 Submittal Procedures.........................................6.25 use to approve substitutions............................6.7.3 Shown or Indicated ............................................... 4.3.1 Site Access......................................................7.2, 13.2 Site Cleanliness ........................................................ 6.17 Site, Visits to -- by ENGINEER...........................................9.2, 13.2 byothers .........................................................13.2 "special causes of loss" policy form, insurance 5.6.2 definition of.....................................................1.36 Specifications— defination of....................................................1.36 of Technical Societies, reference to..................3.3.1 precedence..................................................... 3.3.3 Standards and Specifications of Technical Societies 3.3 Starting Construction, Before .... . ............. ............. 2.5-2.8 Starting the Work....... ...... 2.4 Stop or Suspend Work -- by CONTRACTOR......................................1...15.5 by OWNER. ...................... ........ _8.8, 13.10, 15.1 Storage of materials and equipment.. ..... ..._ _.......4.1, 7.2 Structural Loading, Safety ............................ ....._..... 6.18 Subcontractor— Concerning ................................................ 6.8-6.11 definition of.....................................................1.37 delays............................................................ 12.3 waiver of rights ....... ...... ... ................. ....... ._...., 6.11 Subcontractors --in general ........................ ...... _.6.8-6.1 I Subcontracts --required provisions .. 5.11, 6.11, 11.4.3 Submittals -- Applications for Payment .... _......... ._.._........_.. 14.2 Maintenance and Operation Manuals...............14.12 Procedures ..................................... _............... 6.25 Progress Schedules......................................2.6, 2.9 Samples ... ......................... .................... ...6.24-6.28 Schedule of Values 2.6, 14.1 Schedule of Shop Drawings and Samples Submissions„....................................2.6, 2.8-2.9 Shop Drawings ........................................ 6.24-6.28 Substantial Completion -- certification of............................6.30.2.3, 14.8-14.9 definition of ...................................................... 1.38 Substitute Construction Methods or Procedures6.7.2 Substitutes and "Or Equal" Items_ .... ............. ..........6.7 CONTRACTOR'sExpense ............ ........ _._.6.7.1.3 ENGINEER'sEvaluation...... ......... ... E7.3 "Or-Equal"................................................... Substitute Construction Methods xiii EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) Article or Paragraph Number or Procedures .............................................. 6.7.E Substitute Items ...............:............................. 6.7.1.2 Subsurface and Physical Conditions -- Drawings of, in or relathg to ........................ 4.2.1.2 ENGINEER's Review ....................................... 4.2.4 general.............................................................. 4. Limited Reliance by CONTRACTOR Authorized .............. .................................... 4.2.2 Notice of Differing Subsurface or Physical Conditions ..................... ....................4.2.3 Physical Conditions.......................................4.2.1.2 Possible Contract Documents Change,,,,,,,,,,,,,,, 4.2.5 Possible Price andTimes Adjustments ............. _4.2.6 Reports and Drawings ... ...................................4.2.1 Subsurface and ................................................... 4.2 Subsurface Conditions at the Site ..................... 4.2.1.1 Technical Data.................................................4.2.2 Supervision— CONTRACTOR's responsibility ............... ............ 6.1 OWNER shall not supervise .................... ....._.....8.9 ENGINEER shall not supervise ................ 9.2, 9.13.2 Superintendence..... _.................... _.... _ _ ...... ........ . 6.2 Superintendent, CONTRACTOR's resident ........... .. .. 6.2 Supplemental costs .............................................. 11.4.5 Supplementary Conditions -- definition of.....................................................1.39 principal references to_. ...... I ......... 1.10, 1.18, 2.2, 2.7, .............. .... I ..... .2, 4.3, 5.1, 5.3, 5.4, 5.6-59, 5.11, 6.8, 6.13, 7.4, 8.11, 9.3, 9. 10 Supplementing Contract Documents, ............ ........... 3.6 Supplier -- definition of......................................................1.40 principal references to ........... 3.7, 6.5, 6.8-6.11, 6.20, _........................6.24, 9.13, 14.12 Waiver of Rights......... _ .................................. ., 6.11 Surety -- consent to final payment ,,,,,,,,,,,,,,,_.......14.12, 14.14 ENGINEER has no duty to .......... .. ... . ..I....... _. _ _. 9.13 Notification of..................................10.1, 10.5, 15.2 qualification of ....... ... ................................ ...5.1-5.3 Survival of Obligations,,,,,,,,,,,,, ..6.34 Suspend Work, OWNER May 13.10, 15.1 Suspension of Work and Termination-- ......................15 CONTRACTOR May Stop Work or Terminate...............................................15.5 W OWNER May Suspend ork„............................15.1 OWNER May Tenn inate........ , ._ ....... ,.,._ 15.2-15.4 Taxes --Payment by CONTRACTOR.., _, , .. _,,, , , , ,, , 6.15 Technical Data -- Limited Reliance by CONTRACTOR ................. 4.2 2 Possible Price and Times Adjustments........ .....4.2-6 Reports of Differing Subsurface and Physical Conditions...._..,__ ............ ............ xiv 4.2.3 Temporary construction facilities..... I ....................... 4.1 Article or Paragraph Number Termination -- by CONTRACTOR...........................................15.5 by OWNER........................................8.8, 15.1-15.4 ment of ENGINEER's employ .......... .. .......... . ... ... . 8.2 Suspension of Work-in general,,,,,,,,,,,,,,,,,,,,,,15 Terms and Adjectives..............................................3.4 Tests and Inspections -- Access to the Work, by others ...........................13.2 CONTRACTOR's responsibilities ......................13.5 cost of 13.4 covering Work prior to..............................13.6-13.7 Laws and Regulations (or). ......... ....._. 13.5 Notice of Defects...................................._........13.1 OWNER May Stop Work.................................13,10 OWNER's independent testing ..........................13.4 special, required by ENGINEER... _.I..........._... 9.6 timely notice required ........................._..,....,..,, 13.4 Uncovering the Work, at ENGINEER's request .............. ................................... 13.8-13.9 Times -- Adjusting... ....... ....... ....... _ ...... _0.6 Change of Contract ...................................._...... 12 Computation of _..................... _............. ......... 17.2 Contract Times --definition of...,_..„.,_,.,.„._.._..,,1.12 day..........................................................17.2.2 Milestones .......................... ...... ....................... 12 Requirements— appeals........... ...................................... .10, 16 clarifications, claims and disputes..................9.11, 11.2, 12 Commencement of Contract Times .................. 2.3 Preconstruction Conference ............................2.8 schedules.........................................2.6, 2.9, 6.6 Starting the Work..........................................2.4 Title, Warranty of....................................................14.3 Uncovering Work...... I ....... ............................. 13.8-13.9 Underground Facilities, Physical Conditions_ defmition of....................................................1.41 Not Shown or Indicated_ ................_„_.,,_.___._. 4.3.2 protection of..............................................4.3, 6.20 Shown or Indicated......... Unit Price Work-- claims.........................................................11.9.3 definition of....................................................1.42 generalll.9, 14.1, 14.5 Unit Prices -- general 11.3.1 Determination for., ......... ............. _...._.........,9.10 Use of Premises ................. __._......... 6.16, 6.18, 6.30.2.4 Utility owners .......... ........ ........ 6.13, 6.20, 7.1-7.3, 13.2 Utilization, Partial..................1.28, 5,15, 6.30.2.4, 14.10 Value of the Work 113 Values, Schedule of ............. __....... ,...... 2.6, 2.9-2.9, 14.1 EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION) w! CITY OF FORT COLLINS MODIFICATIONS (REV 9i99) Variations in Work --Minor Authorized ........................................ 6.25, 6.27, 9.5 Article or Paragraph Number Visits to Site --by ENGINEER._........._......................9.2 Waiver of Claims --on Final Payment ......... I I..._.....14.15 Waiver of Rights by insured parties..................5.11, 6.11 Warranty and Guarantee, General --by CONTRACTOR ............................................... 6.30 Warranty of Title, CONTRACTORS ...................... 14.3 Work-- Accessto..........................................................1.3.2 by others,........... ... 7 Changes inthe....................................................10 Continuing the ................................................. 6.29 CONTRACTOR May Stop Work or Terminate...............................................15.5 Coordination of .................................................... 7A Cost of the.................................................11.4-11.5 definition of ................ ................................ ..1.43 .... neglected by CONTRACTOR.. ..... .... .............. .. 13.14 otherWork........................................................... 7 OWNER May Stop Work ..... ............................ 13.10 OWNER May Suspend Work.......... , .1-...,13.10, 15.1 Related, Work at Site ................. .......... 7.1-7.3 Startingthe ...... ................ ....... _.... _................. .2.4 Stopping by CONTRACTOR...... ............. _ . ._15.5 Stopping by OWNER...._...........................15.1-15.4 Variation and deviation authorized, minor ........... 3.6 Work Change Directive -- claims pursuant to.............................................10.2 definition of.....................................................1.44 principal references to ..................... 3.5.3, 10.1-10.2 Written Amendment -- definition of ......................................................1.45 principal references to..............1.10, 3.5, 5.10,15.12, .................6.6.2, 6.8.2, 6.19, 10.1, 10.4, ............. ..............11.2, 12.1, 13.12.2, 14.7.2 Written Clarifications and Interpretations.....................__...,....._3.6.3, 9.4, 9.11 Written Notice Required-- by CONTRACTOR _.............._..........7.1, 9.10-9.11, .............. 10.4, 11.2, 12.1 by OWNER ....................9.10-9.11, 10.4, I1.2, 13.14 xv E1CDC GENERAL CONDITIONS 1910-8 (1990 EDITION) W/ CITY OF FORT COLLINS MODIFICA'n ONS (REV 9199) 5. CLICK: "Most Current Set" to View the list of documents available for the project 3rder items by clicking the cart icon: Start Order -* Most Current Set i� > g § t lost Current Set As of 12112l2006 14 44 OOMountam Issue Set *GaRevision Ii '( Revision 2 $0 Issue Set 7/29/2002 Architectural. 24%36 LBW. A=2 5W Issue Set 7/29/2002 Architectural 24%36 LBW - A-4 W Revision 2 21/10/2004 Architectural 2036 LBW - A=4 ii;if Issue Set 7/29/2002 Architectural 2036 LBW Revision 1 11/12/2003 Architectural 24%36 LBW 6. CLICK: Sheet No. to view) 7. CLICK: to add a specific document to your "Shope ng Cart" 8. CLICK: Start My Order to place the order for printing 9. REGISTER -or- LOGIN 10. SELECT: Process -Media, Output Size and Binding options 11. ENTER: Job Number and PO information then click Next. 12. REVIEW: Recipient information. 13. ENTER: Quantities 14. CLICK: the down arrow to populate order. 15. SELECT: Delivery options and Due time. 16. ENTER: Your phone number in the special instructions box. 17. CLICK: Next. 18. REVIEW order 19. CLICK: SUBMIT Planwell contacts: Sam Ordway 970-691-2201, sordway@mercury-ldo.com David Bacon-720-220-7683, dbacon@mercury-ldo.com Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. Bids will be received as set forth in the Bidding Documents. 07/2001 Section 00020 Page 4 (This page left blank intentionally) xvi EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99) GENERAL CONDITIONS ARTICLE 1-DEFINITIONS Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof: 1.1. Addenda --Written or graphic instruments issued prior to the opening of Bids which clarify, correct or change the Bidding Requirements or the Contract Documents. 1.2. Agreement —The written contract between OWNER and CONTRACTOR covering the Work to be performed other Contract Documents are attached to the Agreement and made a part thereof as provided therein. 1.3. Application for Payment —The form accepted by ENGINEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 1.4. Asbestos --Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 1.5. Bid —The offer or proposal of the bidder submitted onthe prescribed form setting forth the prices for the Work to be performed. 1.6. Bidding Documents —The advertisement or invitation to Bid, instructions to bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 1.7. Bidding Requirements --The advertisement or invitation to Bid, instructions to bidders, and the Bid form. 1.8. Bonds —Performance and Payment bonds and other instruments of security. 1.9. Change Order --A document recommended by ENGINEER, which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 1.10. Contract Documents —The Agreement, Addenda (which pertain to the Contract Documents), CONTRACTOR's Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the EJCDC GENERAL CONDITIONS 1910.8 (1990 Erbtim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 412000) same are more specifically identified in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders and ENGINEER's written interpretations and clarifications issued pursuant to paragraphs 3.5, 3.6.1 and 3.6.3 on or after the Effective Date of the Agreement. Shop Drawing submittals approved pursuant to paragraphs 6.26 and 6.27 and the reports and drawings referred to in paragraphs 4.2.1 and 4.2.2 are not Contract Documents. I.l1. Contract Price —The moneys payable by OWNER to CONTRACTOR for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.9.1 in the case of Unit Price Work), 1.12. Contract Times —The numbers of days or the dates stated in the Agreement: (i) to achieve Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with paragraph 14.13. 1.13. CONTRACTOR --The person, Cum or corporation with whom OWNER has entered into the Agreement 1.14. defective —An adjective which when modifying the word Work refers to Work that is unsatisfactory, faulty or deficient in that it does not conform to the Contract Documents, or does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER's recommendation of final payment (unless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14.8 or 14,10). 1.15. Drawings --The drawings which show the scope, extent and character of the Work to be furnished and performed by CONTRACTOR and which have been prepared or approved by ENGINEER and are referred to in the Contract Documents. Shop drawings are not Drawings as so defined. 1.16. Effective Date of the Agreement --The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 1.17. ENGINEER —The person, firm or corporation named as such in the Agreement. 1.18. ENGINEER's Consultant --A person, firm or corporation having a contract with ENGINEER to furnish services as ENGINEER's independent professional associate or consultant with respect to the Project and who is identified as such in the Supplementary Conditions. 1.19, Field Order —A written order issued by ENGINEER which orders minor changes in the Work in accordance with paragraph 9.5 but which does not involve a change in the Contract Price or the Contract Times. 1.20. General Requirements —Sections of Division 1 of the Specifications. 1.21. Hazardous Waste —The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Wasle Disposal Act (42 USC Section 6903) as amended from time to time. 1.22.a. Laws and Regulations; Laws or Regulations --Any and all applicable laws, rules, regulations, ordinances, codes and orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction. 1.22.b. Legal Holidays --shall be those holidays observed by the City of Fort Collins 1.23. Liens --Liens, charges, security interests or encumbrances upon real property or personal property. 1.24. Milestone --A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. 1.25. Notice of Award —A written notice by OWNER to the apparent successful bidder stating that upon compliance by the apparent successful bidder with the conditions precedent enumerated therein, within the time specified, OWNER will sign and deliver the Agreement. 1.26. Notice to Proceed —A written notice given by OWNER to CONTRACTOR (with a copy to ENGINEER) fixing the date on which the Contract Times will commence to run and onwhich CONTRACTOR shall start to perform CONTRACTOR'S obligations under the Contract Documents. 1.27. OWNER --The public body or authority, corporation, association, firm or person with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provided. 1.28. Partial Utilization --Use by OWNER of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 1.29. PCBs —Polychlorinated biphenyls. 1.30. Petroleum --Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene and oil mixed with other non -Hazardous Wastes and crude oils. 1.31. Project —The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents. 1.32.a. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of EJCDC GENERAL CONDITIONS 1910-8 (1990 Ec dial) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) 1954 (42 USC Section 2011 et seq.) as amended from time to time. 1.32.b. Regular Wonting Hours --Regular working hours are defried as 7 00am to 6 00pm unless otherwise specified in the General Requirements. 1.33. Resident Project Representative —The authorized representative of ENGINEER who may be assigned to the site or any part thereof. 1.34. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged 1.35. Shop Drawings -All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of the Work. 1.36. Specifications —Those portieres of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. 1.37. Subcontractor --An individual, funs or corporation having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the site. 1.38. Substantial Completion --The Work (or a specified part thereof) has progressed to the point where, in the opinion of ENGINEER as evidenced by ENGINEER'S definitive certificate of Substantial Completion, it is sufficiently complete, in accordance with the Contract Documents, so that the Work for specified part) can be utilized for the purposes for which it is intended; or if no such certificate is issued, when the Work is complete and ready for final payment as evidenced by ENGINEER's written recommendation of final payment in accordance with paragraph 14.13. The terms "substantially complete" and "substantially completed" as applied to all or part of the Wok refer to Substantial Completion thereof. 1.39. Supplementary Conditions —The part of the Contract Documents which amends or supplements these General Conditions. 1.40, Supplier —A manufacturer, fabricator, supplier, distributor, materialman or vendor having a direct contract with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by CONTRACTOR or any Subcontractor. 1.41. Underground Facilities —All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water. 1.42. Umt Price Work —Work to be paid for on the basis of unit prices. 1.43. Work --The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. Work includes and is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents. 1.44. Work Change Directive —A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER, ordering an addition, deletion or revision in the Work, or responding to differing or unforeseen physical conditions under which the Work is to be performed as provided in paragraph4.2 or 4.3 or to emergencies under paragmph6.23. A Work Change Directive will not change the Contract Price or the Contract Times, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times as provided in paragraph 10.2. 1.45. Written Amendment --A written amendment of the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonengineering or nontechnical rather than strictly construction -related aspects of the Contract Documents. ARTICLE 2—PRELIMINARY MATTERS Delivery of Bonds: 2.1. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with paragraph 5.1. Copies of Documents., 2.2. OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in the Supplementary Conditions) of the Contract Documents as are reasonably necessary for the execution of the Work. Additional copies will be furnished, upon request, at the cost of reproduction. Commencement of Contract Times; Notice toProcee& 2.3. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agreement, or, EJCDC GENERAL CONDITIONS 1910-5 (1 990Editim) w! CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) if a Notice to Proceed is given, on the day indicated in the Notice to proceed. A Notice to Proceed may be given at any time within thirty days after the Effective Date of the Agreement. in no will .L_ Centroat Times Starting the Work. 2.4. CONTRACTOR shall start to perform the Work on the date when the Contract Times commence to run, but no Work shall be done at the site prior to the date on which the Contract Times commence to run Before Starting Construction: 2.5. Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error, ambiguity or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from ENGINEER before proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents, unless CONTRACTOR knew or reasonably should have known thereof. 2.6. Within ten days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRACTOR shall submit to ENGINEER for review: 2.6.1. a preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2.6.2. a preliminary schedule of Shop Drawing and Sample submittals which will list each required submittal and the times for submitting, reviewing and processing such submittal; 2.6.2.1. In no case will a schedule be acceptable which allows less than 21 calendar days for each review by Engineer. 2.6.3. A preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. 2.7. Before any Work at the site is started, CONTRACTOR and 04W shall each deliver to the et#tar OWNER with copies to :,1eaiified : the Supple...e.. sty C _ r - ENGINEER, rr certificates of insurance (and other evidence of insurance west requested by OWNER) which CONTRACTOR is required to purchase and maintain in accordance with paragraphs 5. 4�.6 and 5.7. Reconstruction Conference: 2.8. Within twenty days after the Contract Times start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals processing Applications for Payment and maintaining required records. Initially AeceplaNe Schedules: 2.9. Unless otherwise provided in the Contract Documents, at least teft days befere submissieft of the before any work at the site beiz a conference attended by CONTRACTOR, ENGINEER and others as designated by OWNER will be held to review for acceptability to ENGINEER as provided below the schedules submitted in accordance with paragraph 2.6. and Division 1 - General Requirements CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until the schedules are submitted to and acceptable to ENGINEER as provided below. The progress schedule will be acceptable to ENGINEER as providing an orderly progression of the Work to completion within any specified Milestones and the Contract Times, but such acceptance will neither impose on ENGINEER responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTOR'S full responsibility therefor. CONTRACTOR's schedule of Shop Drawing and Sample submissions will be acceptable to ENGINEER as providing a workable arrangement for reviewing and processing the required submittals CONTRACTOR's schedule of values will be acceptable to ENGINEER as to form and substance. ARTICLE 3--CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE Intent., 3.1. The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the Work. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the Project. 3.2. It is the intent of the Contract Documents to EJCDC GENERAL CONDITIONS I910-8 (1990 Edition) w! CITY OF FORT COLLINS MODIFICATIONS (REV 42000) describe a functionally complete Project (or part thereol) to be constructed in accordance with the Contract Documents. Arry Work, materials or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be furnished and performed whether or not specifically called for. When words or phrases which have a well-known technical or construction industry or trade meaning are used to describe Work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in paragraph 9.4. 3.3. Reference to &andardc and Specifications of Technical Societies; Reporting and Resolving Discrepancies: 3.3.1. Reference to standards, specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any, governmental authority, whether such reference be specific or by implication, shall mean the latest standard, specification, manual, code or Laws or Regulations in effect at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 3.3.2. It during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provision of any such Law or Regulation applicable to the performance of the Work or of any such standard, specification, manual or code or of any instruction of any Supplier referred to in paragraph 6.5, CONTRACTOR shall report it to ENGINEER in writing at once, and, CONTRACTOR shall not proceed with the Work affected thereby (except in an emergency as authorized by paragraph 6.23) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.5 or 3.6; provided, however, that CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any such conflict, error, ambiguity or discrepancy unless CONTRACTOR knew or reasonably should have known thereof. 3.3.3. Except as otherwise specifically stated in the Contract Documents or as may be provided by amendment or supplement thereto issued by one of the methods indicated in paragraph 3.5 or 3.6, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity or discrepancy between the provisions of the Contract Documents and: 3.3.3.1. the provisions of any such standard, specification, manual, code or instruction (whether or not specifically incorporated by reference in the Contract Documents); or 3.3.3.2. the provisions of arty such Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). No provision of any such standard, specification, manual, code or instruction shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or ENGINEER, or any of their subcontractors, consultants, agents or employees from those set forth in the Contract Documents, net shall it be effective to assign to OWNER, ENGINEER or any of ENGINEERS Consultants, agents or employees any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of paragraph 9.13 or any other provision of the Contract Documents. 3.4. Whenever in the Contract Documents the terms "as ordered', "as directed", "as required", "as allowed", "as approved' or terms of like effect or import are used, or the adjectives "reasonable", "suitable", "acceptable", "proper" or "satisfactory" or adjectives of like effect or import are used to describe a requirement, direction, review or judgment of ENGINEER as to the Work, it is intended that such requirement, direction, review or judgment will be solely to evaluate, in general, the completed Work for compliance with the requirements of and information in the Contract Documents and conformance with the design concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGINEER any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.13 or any other provision of the Contract Documents. Amending and Supplementing Contract Documents 3.5. The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: 3.5.1. a formal Written Amendment, 3.5.2. a Change Order (pursuant to paragraph 10.4), or EJCDC GENERAL CONDITIONS 1910-8 (1990 Ectitim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) 3.5.3. a Work Change Directive (pursuant to paragraph 10.1). 3.6. In addition, the requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, in one or more of the following ways: 3.6.1. A Field Order (pursuant to paragraph 9.5), 3.6.2. ENGINEER's approval of a Shop Drawing or Sample (pursuant to paragraphs 6.26 and 6.27), or 3.6.3. ENGINEER's written interpretation or clarification (pursuant to paragraph 9.4). Reuse ofDoeuments: 3.7. CONTRACTOR, and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with OWNER (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereoi) prepared by or bearing the seal of ENGINEER or ENGINEEWs Consultant, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of OWNER and ENGINEER and specific writtenverification or adaptation by ENGINEER ARTICLE 4--AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS Availability ofLands: 4.1. OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the Work is to be performed, rights -of -way and easements for access thereto, and such other lands which are designated for the use of CONTRACT OR of of filing a eeh—a fl-a's 1: n 1 .e{. 1 J areordaRee with applicable Laws and Regulations. OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which CONTRACTOR will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract. Documents, If CONTRACTOR and OWNER are unable to agree on entitlement to or the amount or extent of any adjustments in the Contract Price or the Contract Times as a result of any delay in OWNERs furnishing these lands, rights -of - way or easements, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.Z Subsurface and Physical Conditions: 4.2.1. Reports and Drawings: Reference is made to the Supplementary Conditions for identification of. 4.2.1.1. Subsurface Conditions: Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by ENGINEER in preparing the Contract Documerts; and 4.2.1.2. Physical Conditions: Those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) that have been utilized by ENGINEER in preparing the Contract Documents. 4.2.2. Limited Reliance by CONTRACTOR Authorized - Technical Data: CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data", CONTRACTOR may not rely upon or make any claim against OWNER, ENGINEER or any of ENGINEER's Consultants with respect to: 4.2.2.1. the completeness of such reports and drawings for CONTRACTOR's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto, or 4.2.22. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or 4.2.2.3. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such data, interpretation, opinions or information. 4.2.3. Notice of Differing Subsurface or Physical Conditions: If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either: 4.23.1. is of such a nature as to establish that any "technical data" on which CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 and 4.2.2 is materially inaccurate, or 4.2.3.2. is of such a nature as to require a change in the Contract Documents, or 4.23.3. differs materially from that shown or EJCDC GENERAL CONDITIONS 1910-8 (1990 Editim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) indicated in the Contract Documents, or 4.2.3.4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Docum ents; then CONTRACTOR shall, pretnptly immediately after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as permitted by paragraph 6.23), notify OWNER and ENGINEER in writing about such condition. CONTRACTOR shall not fiutlter disturb such conditions or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. 4.2.4. EArMEER's Review: ENGINEER will promptly review the pertinent conditions, determine the necessity of OWNER's obtaining additional exploration or tests with respect thereto and advise OWNER in writing (with a copy to CONTRACTOR) of ENGINEER's findings and conclusions. 4.2.5. Possible Contract Documents Change: If ENGINEER concludes that a change in the Contract Documents is required as a result of a condition that meets one or more of the categories in paragraph 4.2.3, a Work Change Directive or a Change Order will be issued as provided in Article 10 to reflect and document the consequences of such change. 4.2.6. Possible Price and Times A(#ustments: An equitable adjustment in the Contract Price or in the Contract Times, or both, will be allowed to the extent that the existence of such uncovered or revealed condition causes an increase or decrease in CONTRACTOR's cost of, or time required for performance of; the Work; subject, however, to the following: 4.2.6.1. such condition must meet any one or more of the categories described in paragraphs 4.2.3.1 through 4.2.3.4, inclusive; 4.2.6.2. a change in the Contract Documents pursuant to paragraph 4.2.5 will not be an automatic authorization of nor a condition precedent to entitlement to any such adjustment; 4.2.6.3. with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provision of paragraphs 9.10 and 11.9, and 4.2.6.4. CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Times if, 4.2.6 4.1. CONTRACTOR knew of the existence of such condition at the time CONTRACTOR made a fmal commitment to OWNER in respect of Contract Price and Contract Times by the submission of a bid or becoming bound under a negotiated contract; or 4.2.6.4.2. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test or study of the site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for CONTRACTOR prior to CONTRACTOR'S making such final commitment; or 4.2.6.4.3. CONTRACTOR failed to give the written notice within the time and as required by paragraph 4.2.3. If OWNER and CONTRACTOR are unable to agree on entitlement to or as to the amount or length of any such equitable adjustment in the Contract Price or Contract Times, a claim may be made therefor as provided in Articles 11 and 12. However, OWNER, ENGINEER and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, costs, losses or damages sustained by CONTRACTOR on or in connection with any other project or anticipated project. 4.3. Physical Conditions -Underground Facilities: 4.3.1. Shown orindicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to OWNER or ENGINEER by the owners of such Underground Facilities or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 4.3.1.1. OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or data; and 4.3.1.2. The cost of all of the following will be included in the Contract Price and CONTRACTOR shall have full responsibility for: (i) reviewing and checking all such information and data, (ii) locating all Underground Facilities shown or indicated in the Contract Documents,(iii) coordination of the Work with the owners of such Underground Facilities during construction, and (iv) the safety and protection of all such Underground Facilities as provided in paragraph 6.20 and repairing any damage thereto resulting from the Work. 4.3.2. Not Shown or Indicated: If an Underground Facility is uncovered or revealed at or contiguous to the site which was not shown or indicated in the Contract Documents, CONTRACTOR shall, promptly immediately after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by paragraph6.23), identify the owner of such Underground Facility and EJCDC GENERAL CONDITIONS 1910.8 (1990 Ed tim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) give written notice to that owner and to OWNER and ENGINEER. ENGINEER will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence of the Underground Facility. If ENGINEER concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued as provided in Article 10 to reflect and document such consequences. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility as pprovided in paragraph6.20. CONTRACTOR sl>ellmay be allowed an increase in the Contract Price or an extension of the Contract Times, or both, to the extent that they are attributable to the existence of any Underground Facility that was not shown or indicated in the Contract Documents and that CONTRACTOR did not know of and could not reasonably have been expected to be aware of or to have anticipated If OWNER and CONTRACTOR are unable to agree on entitlement to or the amount or length of any such adjustment in Contract Price or Contract Times, CONTRACTOR may make a claim therefor as provided in Articles 1 I and 12. However, OWNER, ENGINEER and ENGINEER's Consultants shall not be liable to CONTRACTOR for any claims, tests, losses or damages incurred or sustained by CONTRACTOR on or in connection with any other project or anticipated project. Reference Points: 4.4. OWNER shall provide engineering surveys to establish reference points for construction which in ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points by professionally qualified personnel. 4.5. Asbestos, PCBs, Petroleum, HaZardous Waste or Radioactive Material: 4.5.1. OWNER shall be responsible for any Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material uncovered or revealed at the site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractors, Suppliers or anyone else for whom CONTRACTOR is responsible. ARTICLE 5--BONDS AND INSURANCE Performance, Payment and OtherBonrv: 5.1. CONTRACTOR shall famish Performance and Payment Bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all CONTRACTOR's ob►�ations under the Contract Documents. These Bonds shad remain in effect at least until one year after the date when final payment becomes due, except as provided otherwise by Laws or Regulations or by the Contract Documents. CONTRACTOR shall also famish such other Bonds as are required by the Supplementary Conditions. All Bards shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations and shall be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular570 (amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. All Bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. 5.2. If the surety on any Bond famished by CONTRACTOR is declared a bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.1, CONTRACTOR shall within ten days thereafter substitute another Bond and surety, both of which must be acceptable to OWNER 5.3. Licensed Sureties and Insurers; Certificates of Insurance: 5.3.1. All Bonds and insurance required by the Contract Documents to be purchased and maintained by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.3.2. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by OWNER or any other additional insured) which CONTRACTOR is required to purchase and maintain in accordance with paragraph 5.4. 91Y shell dpl:..e- to C(ITTT'D Ak9TO ..Ah eapies te L .0 fio.tes of / d 1. FoquiFod tor. EJCDC GENERAL CONDITIONS 1910-8 (1990 Editim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) CONTRACTOR's Liability Insurance: 5.4. CONTRACTOR shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and furnished and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's performance and furnishing of the Work and CONTRACTOR'S other obligations under the Contract Documents, whether it is to be performed or furnished by CONTRACTOR, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable: 5.4.1. claims under workers' compensation, disability benefits and other similar employee benefit acts; 5.4.2. claims for damages because of bodily injury, occupational sickness or disease, or death of CONTRACTOR's employees; 5.4.3. claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees; 5.4.5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 5.4.6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. The policies of insurance so required by this paragraph 5.4 to be purchased and maintained shall: 5.4.7. with respect to insurance required by paragraphs 5.4.3 through 5.4.6 inclusive and 5.4.9, include as additional insureds (subject to any customary exclusion in respect of professional liability), OWNER, ENGINEER, ENGINEERS Consultants and any other persons or entities identified in the Supplementary Conditions, all of whom shall be listed as additional insureds, and include coverage for the respective officers and employees of all such additional insureds; 5.4.8. include the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater, 5.4.9. include completed operations insurance; EJCDC GENERAL CONDITIONS 1910-8 (1990 Editim) WICITY OF FORT COLLINS MODIFICATIONS (REV 42000) 5.4.10. include contractual liability insurance covering CONTRACTOWs indemnity obligations under paragraphs 6.12, 6.16 and 6.31 through 6.33; 5.4.11. contain a provision or endorsement that the coverage afforded will not be cancelled, materially changed or renewal refused until at least thirty days' prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the CONTRACTOR pursuant to paragraph 5.3.2 will so provide); 5.4.12. remain in effect at least until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work m accordance with paragraph 13.12; and 5.4.13. with respect to completed operations insurance, and any insurance coverage written on a claims -made basis, remain in effect for at least two years after final payment (and CONTRACTOR shall furnish OWNER and each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued evidence satisfactory to OWNER and any such additional insured of continuation of such insurance at final payment and one year thereafter). OWNER's Liability Insurance: 5.5. In addition to insurance required to be provided by CONTRACTOR under paragraph5.4, OWNER, at OWNER's option, may purchase and maintain at OWNER's expense OWNER's own liability insurance as will protect OWNER against claims which may arise from operations under the Contract Documents. Property Insurance.• ,.pe.. p �d OF SPSGial 0HUSSS Of 185S polley s6..11 .,t lo...,t inoluds in stwam,. C L t t r the a llowi. „_ins: fife ligh rA a The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 50 of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision -making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited City of Fort Collins By�'C Ja es B. O'Neill, II, CPPO, FNIGP rchasing & Risk Management Director 07/2001 Section 00020 Page 5 5.9. OWNER shall not be responsible for purchasing and maintaining any property insurance to protect the interests of CONTRACTOR, Subcontractors or others in the Work to the e?dent F my deductible amonts L at aFe by-CQrUR ACTeR suah less and if mW of them iAishes prep"instwanee --thin the limits of such each may :t at the ..,,F.,L.,.,&S ,...,«, r yO 10 EICDC GENERAL CONDITIONS 19104 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) beyond dxest pkJsi__• • ss of damage to Of the Wefk eaused by; t f 1 ro fFeffl WhOf "It"', whefl�er or not insured Any insuFame 1" a L c NT;l any less, damage eF IlmPafw L L r Uorseslrnt l l the ,'ll ,L _ no rights"r T� ReceiptandApplieadon of Insurance Proceeds: 5.12. Any insured loss under the policies of insurance required by paragraphs 5.6 and 5.7 will be adjusted with OWNER and made payable to OWNER as fiduciary for the insureds, as their interests may appear, subject to the requirements of arty applicable mortgage clause and of paragraph 5.13. OWNER shall deposit in a separate account any money so received, and shall distribute it in accordance with such agreement as the parties in interest may reach If no other special agreement is reached the damaged Work shall be repaired or replaced, the moneys so received applied on account thereof and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment. 5.13. OWNER as fiduciary shall have power to adjust and settle any Ices with the insurers unless one of the parties in interest shall object in writing within fifteen days after the occurrence of loss to OWNER's exercise of this power. If such objection be made, OWNER as fiduciary shall make settlement with the insurers in accordance with such agreement as the parties in interest may reach If no such agreement among the parties in interest is reached, OWNER as fiduciary shall adjust and settle the lass with the insurers a :d :ey w -- ive hoed —for --the proper perfarmanee of sugh,114ii Acceptance of Bonas and Insurance; Option to Replace: 5.14. If either fwti ,". (O;WmER of rnwrrn •r nnnn� , OWNER has any objection to the coverage afforded by or other provisions of the Bonds --er insurance required to be purchased and maintained by the efh7 periy CONTRACTOR in accordance with Article 5 on the basis of nonconformance with the Contract Documents, the objecting ether pally OWNER will notify CONTRACTOR in writing within ten fifteen days after reeeipt delivery of the certificates (ef ether evidence requested) to OWNER as required by paragraph 2.7. eilia_ suoh additional mf Fination in Fespea of .. t4e otuff m .,. bly esti f ' h r,a.: ::. .. _.., .icy .,.� ...y,. P" does net Purehase Of maintain all of the Bends - nguranne _off of „_h patly by the n ontFaet . such party shall aetij� the atheF party nF !!eh othef par Vs ests at Partial l7filirnfion Property Insurance: 5.15. If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial EJCDC GENERAL CONDITIONS 1910-8 (1990 E(fitim) w! CITY OF FORT COLLINS MODIFICATIONS (REV 4/2.000) Completion of all the Work, such use or occupancy may be accomplished in accordance with paragraph 14.10, provided that no such use or occupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be cancelled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES Supervision and Superintendence: 6.1. CONTRACTOR shall supervise, inspect and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of others in the design or specification of a specific means, method, technique, sequence or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.2. CONTRACTOR shall keep on the Work at all times during its progress a competent resident superintendent, who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be CONTRACTORS representative at the site and shall have authority to act on behalf of CONTRACTOR All communications to the superintendent shall be as binding as if given to CONTRACT OR Labor, Materials and Equipment: 6.3. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out and construct the Work as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the site. Except as otherwise required for the safety or protection of persons or the Work or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all Work at the site shall be performed during regular working hours and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, Sunday or any legal holiday without OWNER's written consent given after prior written notice to ENGINEER. CONTRACTOR shall submit requests to the ENGINEER no less than 48 hours in advance of any Work to be performed on Saturday, Sunday, Holidays or outside the Regular Working Hours 6.4. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the Work. 6.4.1. Purchasing Restrictions CONTRACTOR Must comply with the Cites purchasing restrictions. A cry. of the resolutions are available for review in the offices of the Purchasing and Risk Management Division or the City Clerk's office. 6.4.2. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that bum hazardous waste as a fuel. 6.5. All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. Progress Schedule. 6.6. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.9 as it may be adjusted from time to time as provided below: 6.6.1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph2.9) proposed adjustments in the progress schedule that will not change the Contract Times (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto. 6.6.2. Proposed adjustments in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of paragraph 12.1. Such adjustments may only be made by a Change Order or Written Amendment in accordance with Article 12. 6.7. Substitutes and "Or -Equal" Items: 6.7.1. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description 12 E1CDC GENERAL CONDITIONS 1910-8 (1990 Editim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) contains or is followed by words reading that no like, equivalent or "or -equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be accepted by ENGINEER under the following circumstances: 6.7.1.1. "Or -Equal's If in FNGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by ENGINEER as an "or -equal" item, in which case review and approval of the proposed item may, in ENGINEER's sole discretion, be accomplished without compliance with some or all of the requirements for acceptance of proposed substitute items. 6.7.1.2. Substitute Items. If in ENGINEER's sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an "or -equal" item under subparagraph 6.7.1.1. it will be considered a proposed substitute item. CONTRACTOR shall submit sufficient information as provided below to allow ENGINEER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. The procedure for review by the ENGINEER will include the following as supplemented in the General Requirements and as ENGINEER may decide is appropriate under the circumstances. Requests for review of proposed substitute items of material or equipment will not be accepted by ENGINEER from anyone other than CONTRACTOR. If CONTRACTOR wishes to furnish or use a substitute item of material or equipment, CONTRACTOR shall first make written application to ENGINEER for acceptance thereof, certifying that the proposed substitute will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified and be suited to the same use as that specified. The application will state the extent, if any, to which the evaluation and acceptance of the proposed substitute will prejudice CONTRACTOR's achievement of Substantial Completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service will be indicated. The application will also contain an itemized estimate of all costs or credits that will resvlt directly or indirectly from acceptance of such substitute, including costs of redesign and claims of other contractors affected by the resulting change, all of which will be CONTRACTOR shall perform not less than 20 considered by ENGINEER in evaluating the percent of the Work with its own forces (that is proposed substitute. ENGINEER may require without subcontractinel The 20 percent requirement CONTRACTOR to furnish additional data about shall be understood to refer to the Work the value of the proposed substitute. which totals not less than 20 percent of the Contract Price. 6.7.1.3. CONTRACTOR's Expense: All data to be provided by CONTRACTOR in support of any 6.8.2. 13iddinn proposed "or -equal" or substitute item will be at Documents require the identity of certain CONTRACTOR's expense. Subcontractors, Suppliers or other persons or organizations (including those who are to furnish the 6.7.2. Substitute Construction Methods or principal items of materials or equipment) to be procedures: If a specific means, method, technique, submitted to OWNER at advance _c'he Specified sequence or procedure of construction is shown or date prior to the Effective Date of the Agreement for indicated in and expressly required by the Contract acceptance by OWNER and ENGINEER,—end-9 Documents, CONTRACTOR may furnish or utilize a CONTRACTOR has submitted a list dweef substitute means, method, technique, sequence or acemdanee with the Supplementary Canditi procedure of construction acceptable to ENGINEER. OWNER's or ENGINEER's acceptance (either in CONTRACTOR shall submit sufficient information to writing or by failing to make written objection thereto allow ENGINEER, in ENGINF,ER's sole discretion, to by the date indicated for acceptance or objection in determine that the substitute proposed is equivalent to the bidding documents or the Contract Documents) of that expressly called for by the Contract Documents. .or The procedure for review by ENGINEER will be similar to that provided in subparagraph 6.7.1.2. ..when, 6.7.3. Engineer's Evaluation: ENGINEER will be Pass 9ONTI)rCT OR shallsubmit An - - '- substitute, the Centraet Priee wig t -� allowed a reasonable time within which to evaluate edju6edby-the difference i by each proposal or submittal made pursuant to su^h m.b�yation and an appr - iAt. �- � paragraphs 6.7.1.2 and 6.7.2. ENGINEER will be the .mill be i sued o_ * -» l sole judge of acceptability. No "or -equal" or constitute a condition of the Contract requiring the substitute will be ordered, installed or utilized without use of the named subcontractors suppliers or other ENGINEER's prior written acceptance which will be persons or organization on the Work unless prior evidenced by either a Change Order or an approved written approval is obtained from OWNER and Shop Drawing. OWNER may require ENGINEER No acceptance by OWNER or CONTRACTOR to furnish at CONTRACTOR's ENGINEER of any such Subcontractor, Supplier or expense a special performance guarantee or other other person or organization shall constitute a waiver surety with respect to any "or -equal" or substitute. of any right of OWNER or ENGINEER to reject ENGINEER will record time required by defective Work. ENGINEER and ENGINEER's Consultants in evaluating substitutes proposed or submitted by 6.9. CONTRACTOR pursuant to paragraphs 6.7.1.2 and 6.7.2 and in making changes in the Contract 69.1. CONTRACTOR shall be fully responsible to Documents (or in the provisions of any other direct OWNER and ENGINEER for all acts and omissions contract with OWNER for work on the Project) of the Subcontractors, Suppliers and other persons occasioned thereby. Whether or not ENGINEER and organizations performing or furnishing any of the accepts a substitute item so proposed or submitted by Work under a direct or indirect contract with CONTRACTOR, CONTRACTOR shall reimburse CONTRACTOR just as CONTRACTOR is OWNER for the charges of ENGINEER and responsible for CONTRACTOR's own acts and ENGINEER's Consultants for evaluating each such omissions. Nothing in the Contract Documents shall proposed substitute item. create for the benefit of any such Subcontractor, 68. Concerning Subcontractors, Suppliers and Supplier or other person or organization any contractual relationship between OWNER or Others: ENGINEER and any such Subcontractor, Supplier or other person or organization, nor shall it create any 6.8.1. CONTRACTOR shall not employ any obligation on the part of OWNER or ENGINEER to Subcontractor, Supplier or other person or organization pay or to see to the payment of any moneys due any (including those acceptable to OWNER and such Subcontractor, Supplier or other person or ENGINEER as indicated in paragraph 6.8.2), whether organization except as may otherwise be required by initially or as a substitute, against whom OWNER or Laws and Regulations. OWNER or ENGINEER may ENGINEER may have reasonable abjection. Furnish to any subcontractor, supplier or other person CONTRACTOR shall not be required to employ any or organization evidence of amounts paid to Subcontractor, Supplier or other person or organization CONTRACTOR in accordance with to furnish or perform any of the Work against whom CONTRACTOR'S "Applications for Payment" CONTRACTOR has reasonable objection. EJCDC GENERAL CONDITIONS 1910-8 (1990 E(fitim) 13 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 412000) 6.9.2. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the Work to communicate with the ENGINEER through CONTRACTOR 6.10. The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. 6.11. All Work performed for CONTRACTOR by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER. 1 aragna ESL ,.. c o A.e e... tie«......_ the IAMivaq eantaitr All .-:ghts OWNER; CONTD ACTOR b ems._ '-a ,�wnz-is"tvrvic additicinal .1s f all i......e...._A ,Jcaused 1. damagesj, the Work if the answers on e_.. .« M 1. .re nONTR AOTOR ivill ,J.. Patent Fees and Royalties: 6.12. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants and the officers, directors, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages arising out of or resulting from any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product or device not specified in the Contract Documents. 14 EJCDCGENERAL CONDITIONS 191o.8(1990 Edition) W1 CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) Permits: 6.13. Unless otherwise provided in the Supplementary Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work, which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto such as plant investment fees. 6.14. Laws andReguladons: 6.14.1. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to furnishing and performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor ENGINEER shall be responsible for monitoring CONTRACTOR's compliance with any Laws or Regulations. 6.14.2. If CONTRACTOR performs any Work knowing or having reason to know that it is contrary to Laws or Regulations. CONTRACTOR shall bear all claims, costs, losses and damages caused by, arising out of or resulting therefrom; however, it shall not be CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve CONTRACTOR of CONTRACTOR'S obligations under paragraph 3.3.2. Taxes 6.15. CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by CONTRACTOR in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. 6.15.1. OWNER is exempt from Colorado State and local sales and use taxes on materials to be permanently incorporated into the project. Said taxes shall not bee in the Contract Price. Address: Colorado Department of Revenue State Capital Annex 1375 Sherman Street Denver, Colorado, 80261 Sales and Use Taxes for the State of Colorado Regional Transportation District (RTD) and certain Colorado counties are collected by the State of Colorado and are included in the Certification of Exemption. All applicable Sales and Use Taxes (including State collected taxes), on any items other than construction and building materials physically jncomorated into the project are to be paid by CONTRACTOR and are to be included in appropriate bid items. Use of Premises: 6.16. CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by Laws and Regulations, rights -of -way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by arry such owner or occupant because of the performance of the Work, CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultant and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against OWNER, ENGINEER or any other party indemnified hereunder to the extent caused by or based upon CONTRACTOR's performance of the Work. 6.17. During the progress of the Work, CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. CONTRACTOR shall leave the site clean and ready for occupancy by OWNER at Substantial Completion of the Work. CONTRACTOR shall restore to original condition all property not designated for alteration by the Contract Documents. 6.18. CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. Record Documents. EJCDC GENERAL CONDITIONS 1910-8 (1990 Mtim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) 6.19. CONTRACTOR shall maintain in a safe place at the site one record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Change Directives, Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.4) in good order and annotated to show all changes made during construction These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to ENGINEER for reference. Upon completion of the Work, and prior to release of final payment, these record documents, Samples and Shop Drawings will be delivered to ENGINEER for OWNER. Safety and Protection: 6.20. CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of; and shall provide the necessary protection to prevent damage, injury or loss to: 6.20.1. all persons on the Work site or who may be affected by the Work; 6.20.2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and 6.20.3. other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and Underground Facilities not designated for removal, relocation or replacement in the course of construction. CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraphs 6.20.2 or 6.20.3 caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER's Consultant or anyone employed by any of them or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in hart, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). CONTRACTOR's duties and responsibilities for the safety and protection of the Work shall continue until such time as all the Work is completed and ENGINEER has issued a 15 notice to OWNER and CONTRACTOR in accordance with paragraph 14.13 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.21. Safety Representative. - CONTRACTOR shall designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. Hazard Communication Programs: 6.22. CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to he made available to or exchanged between or among employers at the site in accordance with Laws or Regulations. Emergencies: 6.23. In emergencies affecting the safety or protection of persons or the Work or property at the site or. adjacent thereto, CONTRACTOR, without special instruction or authorization from OWNER or ENGINEER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If ENGINEER determines that a change in the Contract Documents is required because of the action taken by CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued to document the consequences of such action 6.24. Shop Drawings and Samples: 6.24.1. CONTRACTOR shall submit Shop Drawings to ENGINEER for review and approval in accordance with the accepted schedule of Shop Drawings and Sample submittals (see paragraph 2.9). All submittals will be identified as ENGINEER may require and in the number of copies specified in the General Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to show ENGINEER the materials and equipment CONTRACTOR proposes to provide and to enable ENGINEER to review the information for the limited purposes required by paragraph 626. 6.24.2. CONTRACTOR shall also submit Samples to ENGINEER for review and approval in accordance with said accepted schedule of Shop Drawings and Sample submittals. Each Sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers and the use for which intended and otherwise as ENGINEER may require to enable ENGINEER to review the submittal for the limited 16 EJCDC GENERAL CONDITIONS 191M (1990EcUta,) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) purposes required by paragraph 6.26. The numbers of each Sample to be submitted will be as specified in the Specifications. 6.25. Submittal Procedures: 6.25.1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified: 6.25.1.1. all field measurements, quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar information with respect thereto, 6.25.1.2. all materials with respect to intended use, fabrication, shipping, handling, storage, assembly and installation pertaining to the performance of the Work, and 6.25.1.3. all information relative to CONTRACTOR's sole responsibilities in respect of means, methods, techniques, sequences and procedures of construction and safety precautions and programs incident thereto. CONTRACTOR shall also have reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents. 6.25.2. Each submittal will bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's obligations under the Contract Documents with respect to CONTRACTOR's review and approval of that submittal. 6.25.3. At the time of each submission, CONTRACTOR shall give ENGINEER specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written communication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample submitted to ENGINEER for review and approval of each such variation. 6.26. ENGINEER will review and approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals accepted by ENGINEER as required by paragraph 2.9. ENGINEER's review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER's review and approval will not extend to means, methods, techniques, sequences or procedures of construction (except where a particular means, method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. CONTRACTOR shall make corrections required by ENGINEER, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals. 6.27. ENGINEER's review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of submission as required by paragraph 6.25.3 and ENGINEER has given written approval of each such variation by a specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CONTRACTOR from responsibility for complying with the requirements of paragraph 6.25.1. 6.28. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawing and Sample submissions accepted by ENGINEER as required by paragraph29, any related Work performed prior to ENGINEER's review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR Continuing the Work. 6.29. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.5 or as OWNER and CONTRACTOR may otherwise agree in writing. 6.30. CONTRACTOR's General Warranty and Guarantee: 6.30.1. CONTRACTOR warrants and guarantees to OWNER, ENGINEER and ENGINEER'S Consultants that all Work will be in accordance with the Contract Documents and will not be defective. CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: 6.30.1.1. abuse, modification or improper maintenance or operation by persons other than CONTRACTOR, Subcontractors or Suppliers; or 6.30.1.2. normal wear and tear under normal usage. 6.30.2. CONTRACTOR's obligation to perfonu and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in EICDC GENERAL CONDITIONS 1910-8 (1990 Fdtim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) accordance with the Contract Documents or a release of CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: 6.30.2.1. observations by ENGINEER; 6.30.2.2. recommendation of any progress or final payment by ENGINEER; 6.30.2.3. the issuance of a certificate of Substantial Completion or any payment by OWNER to CONTRACTOR under the Contract Documents; 6.30.2.4. use or occupancy of the Work or any part thereof by OWNER; 6.30.2.5. any acceptance by OWNER or any failure to do so, 6.30.2.6. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptability by ENGINEER pursuant to paragraph 14.13; 6.30.2.7. any inspection, test or approval by others; or 6.30.2.8. any correction of defective Work by OWNER. Indemnification: 6.31. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER's Consultants and the officers, directors, employees, agents and other consultants of each and any of them from and against all claims, costs, losses and damages (including, but not limited to, all fees and charges of engineers, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs) caused by, arising out of or resulting from the performance of the Work, provided that any such claim, cost, loss or damage: (i) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom, and (ii) is caused in whole or in part by any negligent act or omission of CONTRACTOR, any Subcontractor, any Supplier, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of a person or entity indemnified hereunder or whether liability is imposed upon such indemnified party by Laws and Regulations regardless of the negligence of any such person or entity. 6.32. In any and all claims against OWNER or ENGINEER or any of their respective consultants, agents, officers, directors or employees by any employee (or the survivor or personal representative of such employee) of CONTRACTOR, any Subcontractor, any Supplier, any person or organization directly or indirectly employed by 17 any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.31 shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any such Subcontractor, Supplier or other person or organization under workers' compensation acts, disability benefit acts or other employee benefit acts. 6.33. The indemnification obligations of CONTRACTOR under paragraph 6.31 shall not extend to the liability of ENGINEER and ENGINEER's Consultants, officers, directors, employees or agents caused by the professional negligence, errors or omissions of any of than. Survival of Obligation: 6.34. All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion and acceptance of the Work and termination or completion of the Agreement. ARTICLE 7--OTIIER WORK Related Work at Site: 7.1. OWNER may perform other work related to the Project at the site by OWNER's own forces, or let other direct contracts therefor which shall contain General Conditions similar to these, or have other work performed by utility owners. If the fact that such other work is to be performed was not noted in the Contract Documents, then: (i) written notice thereof will be given to CONTRACTOR prior to starting any such other work and (ii) CONTRACTOR may make a claim therefor as provided in Articles I I and 12 if CONTRACTOR believes that such performance will involve additional expense to CONTRACTOR or requires additional time and the parties are unable to agree as to the amount or extent thereof. 7.2. CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (and OWNER, if OWNER is performing the additional work with OWNERS employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable I S EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors. 7.3. If the proper execution or results of any part of CONTRACTOR's Work depends upon work performed by others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in writing any delays, defects or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of CONTRACTOR's Work. CONTRACTOR's failure so to report will constitute an acceptance of such other work as fit and proper for integration with CONTRACTOR's Work except for latent or nonapparent defects and deficiencies in such other work. Coordination: 7.4. If OWNER contracts with others for the performance of other work on the Project at the site, the following will be set forth in Supplementary Conditions: 7.4.1. the person, firm or corporation who will have authority and responsibility for coordination of the activities among the various prime contractors will be identified, 7.4.2. the specific matters to be covered by such authority and responsibility will be itemized; and 7.4.3. the extent of such authority and responsibilities will be provided. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility in respect of such coordination. ARTICLE S--OWNER'S RESPONSIBILITIES 8.1. Except as otherwise provided in these General Conditions, OWNER shall issue all communications to CONTRACTOR through ENGINEER. 8.2. In case of termination of the employment of ENGINEER, OWNER shall appoint an engineer against whom CONTRACTOR makes me whose status under the Contract Documents shall be that of the former ENGINEER 8.3. OWNER shall furnish the data required of OWNER under the Contract Documents promptly and shall make payments to CONTRACTOR promptly when they are due as provided in paragraphs 14.4 and 14.13. 8.4. OWNER's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 4.1 and 4.4. Paragraph4.2 refers to OWNERS identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and drawings of physical conditions in existing structures at or contiguous to the site that have been utilized by ENGINEER in preparing the Contract Documents. 83. n—awn cgs re..poinsibilities in _e..peet ..t...._..hasi.... and ffia4mitiiiag liability and pro forth in panVOph�- 8.6. OWNER is obligated to execute Change Orders as indicated in paragraph 10.4. 8.7. OWNER's responsibility in respect of certain inspections, tests and approvals is set forth in paragraph 13.4. 8.8. In connection with OWNER's right to stop Work or suspend Work, we paragraphs 13.10 and 15.1. Paragraph 15.2 deals with OWNER's right to terminate services of CONTRACTOR under certain circumstances. 8.9. The OWNER shall not supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR's means, methods, techniques; sequences or procedures of construction or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the Work. OWNER will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. 840-.—OW�MR!srespensibility inrespectof-undiselesed Asbestos, PCBs; Petroleum, Ilsaifdaus Waste or set Roth in pa_...,..,.a nT c set Roth enwser_eswee�e!rs.�Irucr� es�e+��ee^en . �:. ARTICLE 9--ENGINEER'S STATUS DURING CONSTRUCTION 0WM,R's Representative: 9.1. ENGINEER will be OWNER'S representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER'S representative during construction are set forth in the Contract Documents and shall not be extended without written consent of OWNER and ENGINEER. Visits to .Site: 9.2. ENGINEER will make visits to the site at intervals appropriate to the various stages of construction as ENGINEER deems necessary in order to observe as an experienced and qualified design professional the progress EJCDC GENERAL CONDITIONS 1910-8 (1990 Edtim) wl CITY OF FORT COLLINS MODIFICATIONS (REV 42000) that has been made and the quality of the various aspects of CONTRACTOR's executed Work. Based on information obtained during such visits and observations, ENGINEER will endeavor for the benefit of OWNER to determine, in general, if the Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous on - site inspections to check the quality or quantity of the Work. ENGINEER'S efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and on - site observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defective Work. ENGINEER'S visits and on -site observations are subject to all the limitations on ENGINEER's authority and responsibility set forth in paragraph 9.13, and particularly, but without limitation, during or as a result of ENGINEER'S on -site visits or observations of CONTRACTOR's Work ENGINEER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furmslmng or performance of the Work. Project Representative: 9.3. If OWNER and ENGINEER agree, ENGINEER will furnish a Resident Project Representative to assist ENGINEER in providing more continuous observation of the Work. The responsibilities and authority and limitations thereon of any such Resident Project Representative and assistants will be as provided in paragraphs 9.3 and 9.13th Eenditiens of these General Conditions. If OWNER designates another representative or agent to represent OWNER at the site who is not ENGINEER'S Consultant, agent or employee, the responsibilities and authority and limitations thereon of such other person will be as provided in paragraph 9.3 9.3.1. The Represerntative's dealings in matters pertaining to the on -site work will in general, be with the ENGINEER and CONTRACTOR But. the Representative will keep the OWNER prr par erly advised about such matters. The Representative's dealings with subcontractors will only be through or with the full knowledge and approval of the CONTRACTOR. 9 3 2 Duties and Responsibilities Representative will'. 9.3.2.1 Schedules Review the progress 19 SECTION 00100 INSTRUCTIONS TO BIDDERS schedule and other schedules prepared by the CONTRACTOR and consult with the ENGINEER concerning acceptability. 9.3.2.2. Conferences and Meeting - Attend meetim with the CONTRACTOR such as preconstruction conferences, progress meetings and other iob conferences artd prepare and circulate copies of minutes of meetings. 9.3.2.3. Liaison 9.3.2.3.1. Serve as ENGINEER'S liaison with CONTRACTOR working mrimpally through CONTRACTOR'S superintendent to assist the CONTRACTOR in understanding the Contract Documents. 9.32.3.2. Assist in obtaining from OWNER additional details or information. when required for proper execution of the Work 9.3.2.3.3. Advise the ENGINEER and CONTRACTOR of the commencement of any Work reauirutg a Shop Drawing or sample submission if the submission has not been approved by ENGINEER. 9.3.2.4.Review of Work. Rejection of Defective Work Inspections and Tests - 9.3.2.4.1. Conduct on -site observations of the Work in pnress to assist the ENGINEER in detemrining that the Work is proceeding in accordance with the Contract Documents. 9.3.2.4.3. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections and report to the ENGINEER. 9.3.2.5. Interpretation of Contract Documents. Report to ENGINEER when clanfrcations and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarification and interpretation of the Contract Docmnents as issued by the ENGINEER 9.3.2.6. Modifications. Consider and evaluate CONTRACTOR'S suggestions for EJCDC GENERAL CONDITIONS 1910-8 (1990Editim) 20 wJ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) modification in Drawings or Specifications and report these recommendations to ENGINEER. Accurately transmit to CONTRACTOR decisions issued by the ENGINEER. 9.3.2.7. Records. 9.32.8. Reports. 9.3.2.8.1. Fumish ENGINEER periodic reports, as required, of the progress of the Work and of the CONTRACTOR'S compliance with the progress schedule and schedule of shop Drawing and sample submittals, 9.3.2.8.2. Consult with ENGINEER in advance of scheduling_ major test& inspections or start of important phases of the Work. 9.3.2.8.3. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from the CONTRACTOR and recommend to ENGINEER Change Orders, Work Directive Changes and field orders 9.3.2.8.4. Report immediately to ENGINEER and OWNER the occurrence of any accident. 9.3.2.9. Payment Requests. Review applications for payment with CONTRACTOR for compliance with the established procedure for their submission and forward with recommendation to ENGINEER, notinit particularly the relationship of the payment requested to the schedule of values, work completed and materials and equipment delivered at the site but not incorporated in the Work. 9.3.2.10. Completion 9.3.2.10.1. Before ENGINEER issues a Certificate of Substantial Completion submit to CONTRACTOR a list of observed items requiring correction or completion. 9.3.2.10.2. Conduct final inspection in the comMy of the ENGINEER, OWNER and CONTRACTOR and prepare a final list of items to be corrected or completed. 9.3.2.10.3. Observe that all items on the final list have been corrected or completed and make recommendations to ENGINEER concerning acceptance. 9.3.3. Limitation of Authority: The -Representative shall not: 9.3.3.1. Authorize any deviations from the Contract Documents or —apcept any substitute materials or equipment unless authorized by the ENGINEER. 9.3.3.2. Exceed limitations of ENGINEER'S authority as set forth in the Contact Documents. 9.3.3.3. Undertake any of the responsibilities of the CONTRACTOR, Subcontractors, or CONTRACTOR'S superintendent. 9.3.3.4. Advise on or issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures for conshuction unless such is specifically called for in the Contract Documents. 9.3.3.5. Advise on or issue directions regarding or assume control over safety precautions and programs in connections with the Work. 9.3.3.6. Accept Shop Drawings or sample submittals from anyone other than the CONTRACTOR 9.3.3.7. Authorize OWNER to occupy the Work in whole or in part. 9:3.3.8. Part cipate in specialized field or laboratory tests or inspections conducted by others except as Meecifically authorized by the ENGINEER. Clarifications and Interpretations: 9.4. ENGINEER will issue with reasonable promptness such written clarifications or interpretations of the EJCDC GENERAL CONDITIONS 1910-8 (1990 E(hum) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) requirements of the Contract Documents (in the form of Drawings or otherwise) as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably inferable from the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR If OWNER or CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Price or the Contact Times and the parties are unable to agree to the amount or extent thereof, if arty, OWNER or CONTRACTOR may make a written claim therefor as provided in Article 11 or Article 12. Authorized Variations in Work: 9.5. ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contact Documents. These maybe accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR who shall perform the Work involved promptly. If OWNER or CONTRACTOR believes that a Field Orderjustifies an adjustment in the Contract Price or the Contract Times and the parties are unable to agree as to the amount or extent thereof, OWNER or CONTRACTOR may make a written claim therefor as provided in Article 1 I or 12. Rejecting Defective Work: 9.6. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, or that ENGINEER believes will not produce a completed Project that conforms to the Conrad Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER will also have authority to require special inspection or testing of the Work as provided in paragraph 13.9, whether or not the Work is fabricated, installed or completed. Shop Drawings, Change Orders and Payments 9.7. In connection with ENGINEER'S authority as to Shop Drawings and Samples, see paragraphs 6.24 through 6.28 inclusive. 9.8. In connection with ENGINEER's authority as to Charge Orders, see Articles 10, 11, and 12. 9.9. In connection with ENGINEER's authority as to Applications for Payment, see Article 14. Determinations for Unit Prices 9.10. ENGINEER will determine the actual quantities and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEERS preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application 21 for Payment or otherwise). ENGINEER's written decision thereon will be final and binding upon OWNER and CONTRACTOR, unless, within ten days after the date of any such decision, either OWNER or CONTRACTOR delivers to the other and to ENGINEER written notice of intention to appeal from ENGINEER's decision and: (i) an appeal from ENGINEERS decision is taken within the time limits and in accordance with the procedures set forth in Exhibit GC -A, "Dispute Resolution Agreement", entered into between OWNER and CONTRACTOR pursuant to Article 16, or (ii) if no such Dispute Resolution Agreement has been entered into, a formal proceeding is instituted by the appealing party in a forum of winpetern jurisdiction to exercise such rights or remedies as the appealing party may have with respect to ENGINEER's decision, unless otherwise agreed in writing by OWNER and CONTRACTOR Such appeal will not be subject to the procedures of paragraph 9.11. Decisions on Disputes., 9.11. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the Work and claims under Articles 11 and 12 in respect of changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph. Written notice of each such claim, dispute or other matter will be delivered by the claimant to ENGINEER and the other party to the Agreement promptly (but in no event later than thirty days) after the start of the occurrence or event giving rise thereto, and written supporting data will be submitted to ENGINEER and the other party within sixty days after the start of such occurrence or event unless ENGINEER allows an additional period of time for the submission of additional or more accurate data in support of such claim, dispute or other matter. The opposing party shall submit any response to ENGINEER and the claimant within thirty days after receipt of the claimant's last submittal (unless ENGINEER allows additional time). ENGINEER will render a formal decision in writing within thirty days after receipt of the opposing party's submittal, if any, in accordance with this paragraph ENGINEER's written decision on such claim, dispute or other matter will be final and binding upon OWNER and CONTRACTOR unless: (i) an appeal from ENGINEER's decision is taken within the time limits and in accordance with the procedures set forth in EXHIBIT GC -A, "Dispute Resolution Agreement", entered into between OWNER and CONTRACTOR pursuant to Article 16, or (ii) if no such Dispute Resolution Agreement has been entered into, a written notice of intention to appeal from ENGINEER's written decision is delivered by OWNER of CONTRACTOR to the other and to ENGINEER within thirty days after the date of such decision and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction to exercise such rights or remedies as the appealing party may have with respect to such claim, dispute or other matter in accordance with applicable Laws and Regulations within sixty days of the date of such 92 EJCDC GENERAL CONDITIONS 19t"(1990E(itim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4f1000) decision, unless otherwise agreed in writing by OWNER and CONTRACTOR. 9.12. When functioning as interpreter and judge under paragraphs 9.10 and 9.11, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to paragraphs 9.10 or 9.11 with respect to any such claim, dispute or other matter (except any which have been waived by the making or acceptance of final payment as provided in paragraph 14.15) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim, dispute or other matter. 9.13. Limitations on FNGIAEF.R's Authority and Responsibilities: 9.13.1. Neither ENGINEER's authority or responsibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise or performance of any authority or responsibility by ENGINEER shall create, impose or give rise to any duty owed by ENGINEER to CONTRACTOR, any Subcontractor, any Supplier, any other person or organization, or to any surety for or employee or agent of any of them. 9.13.2. ENGINEER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the famishing or performance of the Work. ENGINEER will not be responsible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. 9.13.3. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work 9.13.4. ENGINEER's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by paragraph 14.12 will only be to determine generally that their coment complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with, the Contract Documents. 933.5. The limitations upon authority and responsibility set forth in this paragraph 9.13 shall also apply to ENGINEER's Consultants, Resident Project Representative and assistants. ARTICLE 10—CHANGES IN THE WORK 10.1. Without invalidating the Agreement and without notice to any surety, OWNER may, at any time or from time to time, order additions, deletions or revisions in the Work. Such additions, deletions or revisions will be authorized by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). 10.2. If OWNER and CONTRACTOR are unable to agree as to the extent, if any, of an adjustment in the Contract Price or an adjustment of the Contract Times that should be allowed as a result of a Work Change Directive, a claim may be made therefor as provided in Article 11 or Article 12. 10.3. CONTRACTOR shall not be entitled to an increase in the Contract price or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraphs 3.5 and 3.6, except in the case of an emergency as provided in paragraph 6.23 or in the case of uncovering Work as provided in paragraph 13.9. 10.4. OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGINEER (or Written Amendments) covering. 10.4.1. changes in the Work which are (i) ordered by OWNER pursuant to paragraph 10.1, (h) required because of acceptance of defective Work under paragraph 13.13 or correcting cfective Work under paragraph 13.14, or (iii) agreed to by the parties; 10.4.2. changes in the Contract Price or Contract Times which are agreed to by the parties, and 10.4.3. changes in the Contract Price or Contract Times which embodv the substance of any written decision rendered by ENGINEER pursuant to paragraph 9.11; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, CONTRACTOR shall carry on the Work and adhere to the progress schedule as provided in paragraph 6.29. 10.5. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents EJCDC GENERAL CONDITIONS 1910-5 (1990 Edtim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Band to be given to a surety, the giving of any such notice will be CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. ARTICLE 11—CHANGE OF CONTRACT PRICE 1.1.1. The Contract Price constitutes the total compensation (subject to authorized adjustments) payable to CONTRACTOR for performing the Work. All duties, responsibilities and obligations assigned to or undertaken by CONTRACTOR shall be at CONTRACTOR's expense without change in the Contract Price. 11.2. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any claim for an adjustment in the Contract Price shall be based on written notice delivered by the patty making the claim to the other party and to ENGINEER promptly (but in no event later than thirty days) after the start of the occurrence or event giving rise to the claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after the start of such occurrence or event (unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of the claim) and shall be accompanied by claimant's written statement that the adjustment claimed covers all known amounts to which the claimant is entitled as a result of said occurrence or event. All claims for adjustment in the Contract Price shall be determined by ENGINEER in accordance with paragraph 9.11 if OWNER and CONTRACTOR cannot otherwise agree on the amount involved. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph 11.2. 11.3. The value of any Work covered by a Change Order or of any claim for an adjustment in the Contract Price will be determined as follows: 11.3.1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of 23 paragraphs 11.9.1 through 11.9.3, inclusive); 11.3.2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed payment basis, including lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 11.6.2); 113.3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under paragraph 11.3.2, on the basis of the Cost of the Work (determined as provided in paragraphs 11.4 and 11.5) plus a CONTRACTOR'S fee for overhead and profit (determined as provided in paragraph 11.6). Cost of the Work- 11.4. The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in paragraph 11.5: 11.4.1. Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the Work under schedules of job classifications agreed upon by OWNER and CONTRACTOR. Such employees shall include without limitation superimendents, foremen and other personnel employed full-time at the site. Payroll costs for employees not employed full-time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall inelude;- but rret be limited to; salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and reicemen, benefits -bend applicable thereto. The expenses of performing Work after regular working hours, on Saturday, Sunday or legal holidays, shall be included in the above to the extent authorized by OWNER. 11.4.2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade discounts, rebates and refund, and returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained. 11.4.3. Payments made by CONTRACTOR to the Subcontractors for Work performed or furnished by Subcontractors. If required by OWNER, EJCDC GENERAL CONDITIONS 1910-8 (1990 Edition) 24 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to OWNER and CONTRACTOR and shall deliver such bids to OWNER who wilt then determine, with the advice of ENGINEER, which bids, if any, will be accepted. if any subcontract provides that the Subcontractor is to be }raid on the basis of Cost of the Work plus a fee, the Subcontractors Cost of the Work and fee shall be determined in the same manner as CONTRACTOR's Cost of the Work and fee as provided in paragraphs 11.4, 11.5, 11.6 and 11.7. All subcontracts shall be subject to the other provisions of the Contract Documents insofar as applicable. 11.4.4. Costs of special consultants (including but not limited to engineers, architects, test'n laboratories, surveyors, attorneys and accountants employed for services specifically related to the Work. 11.4.5. Supplemental costs including the following: 11.4.5.1. The proportion of necessary transportation, travel and subsistence expenses of CONTRACTOR'S employees incurred in discharge of duties connected with the Work. 11.4.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost less market value of such items used but not consumed which remain the property of CONTRACTOR 11.4.5.3. Rentals of all construction equipment and machinery and the parts thereof whether rented frcrn CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation, loading, unloading, installation, dismantling and removal thereof —all in accordance with terms of said rental agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work. 11 4.5.4. Sales, consumer, use or similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations. 11.4.5.5. Deposits lost for causes other than negligence of CONTRACTOR, any Subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. 11.4.5.6. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by CONTRACTOR in connection with the performance and furnishing of the Work (except losses and damages within the deductible amounts of property insurance established by OWNER in accordance with paragraph 5.9), provided they have resulted from causes other than the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR's fee. If, however, any such loss or damage requires reconstruction and CONTRACTOR is placed in charge thereof, CONTRACTOR shall be paid for services a fee proportionate to that stated in paragraph 11.6.2. 11.4.5.7. The cost of utilities, fuel and sanitary facilities at the site. 11.4.5.& Minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the Work. 11.4.5.9. Cost of premiums for additional Bonds and insurance required because of changes in the Work. 11.5. The term Cost of the Work shall not include any of the following: 11.5.1. Payroll costs and other compensation of CONTRACTOR's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by CONTRACTOR whether at the site or in CONTRACTOR's principal or a branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.4.1 or specifically covered by paragraph 11.4.4—all of which are to be considered administrative costs covered by the CONTRACTOWs Fee. 11.5.2. Expenses of CONTRACTOR's principal and branch offices other than CONTRACTOR' office at the site. 11.5.3. Any part of CONTRACTORS capital expenses, including interest on CONTRACTOR'S capital employed for the Work and charges against CONTRACTOR for delinquent payments. 11.5.4. Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same (except for the cost of premiums covered by subparagraph 11.4.5.9 above). EJCDC GENERAL COMMONS 1910-8 (1990 Edition) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4n000) 11.5.5. Costs due to the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of ckfective Work, disposal of materials or equipment wrongly supplied and making good any damage to property. 11.5.6. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in paragraph 11.4. 11.6. The CONTRACTOR's fee allowed to CONTRACTOR for overhead and profit shall be determined as follows: 11.6.1. a mutually acceptable fixed fee; or 11.6.2, if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: 11.6.2.1. for costs incurred under paragraphs 11.4.1 and 11.4.2, the CONTRACTOR's fee shall be fifteen percent; 11.6.2.2. for costs incurred under paragraph 11.4.3, the CONTRACTOR's fee shall be five percent; 11.6.2.3. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of paragraphs 11.4.1, 11.4.2, 11.4.3 and 11.6.2 is that the Subcontractor who actually performs or f imishes the Work, at whatever tier, will be paid a fee of fifteen percent of the costs incurred by such Subcontractor under paragraphs 11.4.1 and 11.4.2 and that any higher tier Subcontractor and CONTRACTOR will each be paid a fee of fie pement of the amount-paid-te the next zoc.crtiff Saoco.aancmr to be negotiated in Food faith with the OWNER but not to exceed five percent of the amount paid to the next lower tier Subcontractor. 11.6.1.4. no fee shall be payable on the basis of costs itemized under paragraphs 11.4.4, 11.4.5 and 11.5; 11.6.2.5. the amount of credit to be allowed by CONTRACTOR to OWNER for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in CONTRACTOR's fee by an amount equal to five percent of such net decrease; and 11.6.2.6. when both additions and credits are involved in any one change, the adjustment in CONTRACTOR's tee shall be computed on the basis of the net change in accordance with paragraphs 11.6.2.1 through 11.6.2.5, inclusive. 11.7. Whenever the cost of any Work is to be 25 determined pursuant to paragraphs l IA and 11.5, CONTRACTOR will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in form acceptable to ENGINEER an itemized cost breakdown together with supporting data. Cash Allowances: 11.8. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be furnished and performed for such sums as may be acceptable to OWNER and ENGINEER. CONTRACTOR agrees that: 11.8.1. the allowances include the cost to CONTRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the site, and all applicable taxes; and 11.8.2. CONTRACTOR's costs for unloading and handling on the site, labor, installation costs, overhead, profit and other expenses contemplated for the allowances have been included in the Contract Price and not in the allowances and no demand for additional payment on account of any of the foregoing will be valid. Prior to final payment, an appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.9. Unit Price Work.- 11.9.1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit prices for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER in accordance with paragraph 9.10. 11.92. Each unit price will be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR's overhead and profit for each separately identified item. 11.9.3.OWNER or CONTRACTOR may make a claim for an adjustment in the Contract Price in accordance with Article 11 if: 11.9.3.1. the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement; 26 EJCDC GENERAL CONDITIONS 1910-8 (1990 Edraan) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000) and 11.9.3.2. there is no corresponding adjustment with respect to any other item of Work; and 11.9.3.3. if CONTRACTOR believes that CONTRACTOR is entitled to an increase in Contract Price as a result of having incurred additional expense or OWNER believes that OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. 11.9.3.4. CONTRACTOR acknowledites that the OWNER has the right to add or delete items in the Bid or change quantities at OWNER'S sole discretion without affecting the Contract Price of any remaining item so long as the deletion or addition does not exceed twenty-five percent of the original total Contract Price. ARTICLE 12--CHANGE OF CONTRACT TIMES 12.1. The Contract Times (or Milestones) may only be changed by a Change Order or a Written Amendment. Any claim for an adjustment of the Contract Times (or Milestones) shall be based on written notice delivered by the party making the claim to the other party and to ENGINEER promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the extent of the claim with supporting data shall be delivered within sixty days alter such occurrence (unless ENGINEER allows additional time to ascertain more accurate data in support of the claim) and shall be accompanied by the claimant's written statement that the adjustment claimed is the attire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Times (or Milestones) shall be determined by ENGINEER in accordance with paragraph9.11 if OWNER and CONTRACTOR cannot otherwise agree. No claim for an adjustment in the Contract Times (or Milestones) will be valid if not submitted in accordance with the requirements of this paragraph 12.1. 122. All time limits stated in the Contract Documents are of the essence of the Agreement. 12.3. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of CONTRACTOR, the Contract Times (or Milestones) will be extended in an amount equal to time lost due to such delay if a claim is made therefor as provided in paragraph 12.1. Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions or acts of Gad. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of CONTRACTOR. 12.4. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both OWNER and CONTRACTOR an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay shall be CONTRACTOR's sole and exclusive remedy for such delay. In no event shall OWNER be liable to CONTRACTOR any Subcontractor, any Supplier, any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from (i) delays caused by or within the control of the CONTRACTOR or (ii) delays beyond the control of both parties including but not limited to, fires, floods, epidemics, abnormal weather conditions, acts of God or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. ARTICLE 13--TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.1. Notice of Defects: Prompt notice of all defective Work of which OWNER or ENGINEER have actual knowledge will be given to CONTRACTOR All defective Work may be rejected, corrected or accepted as provided in this Article 13. Access to Work: 13.2. OWNER ENGINEER ENGINEE&s Consultants, other representatives and personnel of OWNER independent testing laboratories and governmental agencies with jurisdictional interests will have access to the Work at reasonable times for their observation, inspecting and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. Tests and Inspections 13.3. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.4. OWNER shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents except: 13.4.1. for inspections, tests or approvals covered by paragraph 13.5 below; 13.4.2. that costs incurred in connection with tests or inspections conducted pursuant to paragraph 13.9 EJCDC GENERAL CONDITIONS 1910-8 (1990 E(itim) w! CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) below shall be paid as provided in said paragraph 13.9; and 13.4.3. as otherwise specifically provided in the Contract Documents. 13.5. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested or approved by an employee or other representative of such public body, CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith, and furnish ENGINEER the required certificates of inspection, or approval. CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for OWNER's and ENGINEER's acceptance of materials or equipment to be incorporated in the Work, or of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR's purchase thereof for incorporation in the Work. 13.6. If any Work (or the work of others) that is to be inspected, tested or approved is covered by CONTRACTOR without written concurrence of ENGINEER, it must, if requested by ENGINEER be uncovered for observation. 13.7. Uncovering Work as provided in paragraph 13.6 shall be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR's intention to cover the same and ENGINEER has not acted with reasonable promptness in response to such notice. Uncovering Work: 13.8. If' any Work is covered contrary to the written request of ENGINEER it must, if requested by ENGINEER, be uncovered for ENGINEER's observation and replaced at CONTRACT OR's expense. 13.9. If ENGINEER considers it necessary or advisable that covered Work be observed by ENGINEER or inspected or tested by others, CONTRACTOR at ENGINEER's request, shall uncover, expose or otherwise make available for observation, inspection or testing as ENGINEER may require, that portion of the Work in question furnishing all necessary labor, material and equipment. If it is found that such Work is defective, CONTRACTOR shall pay all claims, costs, losses and damages caused by, arising out of or resulting fron such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction, (including but not limited to all costs of repair or replacement of work of others); and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof; may make a claim therefor as provided in Article 11. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such 27 uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and, if the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. OWNER Alay Stop the Work: 13.10. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to famish or perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the Work shell not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONT RACTOR or any surety or other party. Correction or Removal of Defective Work: 13.11. If required by ENGINEER, CONTRACTOR shall. promptly, as directed, either correct all defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by ENGINEER, remove it from the site and replace it with Work that is not defective. CONTRACTOR shall pay all claims, costs, lasses and damages caused by or resulting from such correction or removal (including but not limited to all costs of repair or replacement of work of others). 13.12. Correction Period: 13,12.1.If within one yaor two years alter the date of Substantial Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER's written instructions. (i) correct such defective Work, or, if it has been rejected by OWNER, remove it from the site and replace it with Work that is not ckfective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work corrected or the rejected Work removed and replaced, and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by CONTRACTOR. 13.12.2.In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. 13.12.3. Where defective Work (and damage to other 28 EICDC GENERAL CONDITIONS 1910-8 (1990 Ed Lim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4,2000) Work resulting therefrom) has been corrected, removed or replaced under this paragraph 13.12, the correction period hereunder with respect to such Work will be extended for an additional period of one year two •years after such correction or removal and replacement has been satisfactorily completed. Acceptance of Defective Work: 13.13. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to ENGINEER'S recommendation of final payment, also ENGINEER) prefers to accept it, OWNER may do so. CONTRACTOR shall pay all claims, costs, losses and damages attributable to OWNER'S evaluation of and determ ination to accept such defective Work (such costs to be approved by ENGINEER as to reasonableness). If any such acceptance occurs prior to ENGINEER'S recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. OWNER May Correct Defective Work: 13.14. If CONTRACTOR fails within a reasonable time after written notice from ENGINEER to correct defective Work or to remove and replace rejected Work as required by ENGINEER in accordance with paragraph 13.11, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days written notice to CONTRACTOR, correct and remedy any such deficiency. In exercising the rights and remedies under this paragraph OWNER shall proceed expeditiously. In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or pert of the site, take possession of all or part of the Work and suspend CONTRACTOR'S services related thereto, take possession of CONTRACTOR'S tools, appliances, construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER'S representatives, agents and employees, OWNERS other contractors and ENGINEER and ENGINEER'S Consultants access to the site to enable OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by OWNER in exercising such rights and remedies will be charged against CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of CONTRACTOR'S defective Work. CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in performance of the Work attributable to the exercise by OWNER of OWNER'S rights and remedies hereunder. ARTICLE 14--PAYMENTS TO CONTRACTOR AND COMPLETION Schedule of values. 14.1. The schedule of values established as provided in paragraph 2.9 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to ENGINEER. Progress payments on account of Unit Price Work will be based on the number of units completed. Application for Progress Payment: 14.2. At least twenty days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to ENGINEER for review an Application for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the site or at another location agreed to in writing the Application for Payment shall also be accompanied by a bill of sale, invoice or other documentation warranting that OWNER has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect OWNER's interest therein, all of which will be satisfactory to OWNER. The amount of retamage with respect to progress payments will be as stipulated in the Agreement. Any funds that are withheld by the OWNER shall not be subject to substitution by the CONTRACTOR with securities or any arrangements involving an escrow or custodianship. By executing the a lication for ent form the CONTRACTOR expressly waives his right to the benefits of Colorado Revised Statutes Section 24-91-101, et sea. CONTRACTOR's Warranty of Title: 14.3. CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens. Review ofApplieatdons for Progress Payment: 14.4. ENGINEER will, within ten days after receipt of each Application for Payment, either indicate in writing a EICDC GENERAL CONDITIONS 1910-8 (1990 Editim) w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000) recommendation of payment and present the Application to OWNER, or return the Application to CONTRACTOR indicating in writing ENGINEER's reasons for refusing to recommend payment. In the latter case, CONTRACTOR may make the necessary corrections and resubmit the Application. Ten days after presentation of the Application for Payment to OWNER with ENGINEER's recommendation, the amount recommended will (subject to the provisions of the last sentence of paragraph 14.7) become due and when due will be paid by OWNER to CONTRACTOR 14.5. ENGINEER's recommendation of any payment requested in an Application for Payment will constitute a representation by ENGINEER to OWNER, based on ENGINEER's on -site observations of the executed Work as an experienced and qualified design professional and on ENGINEER's review of the Application for Payment and the accompanying data and schedules, that to the best of ENGINEER's knowledge, information and belief: 14.5.1. the Work has progressed to the point indicated, 14.5.2. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.10, and to any other qualifications stated in the recommendation), and 14.5.1 the conditions precedent to CONTRACTOR's being entitled to such payment appear to have been fulfilled insofar as it is ENGINEER's responsibility to observe the Work. However, by recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i) exhaustive or continuous on -site inspections have been made to check the quality or the quantity of the Work beyond the responsibilities specifically assigned to ENGINEER in the Contract Documents or (ii) that there may not be other matters or sues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle OWNER to withhold payment to CONTRACTOR. 14.6. ENGINEEWs recommendation of any payment, including final payment, shall not mean that ENGINEER is responsible for CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the famishing or performance of Work, or for any failure of CONTRACTOR to perform or furnish Work in accordance with the Contract Documents. 14.T ENGINEER may refuse to recommend the whole or any part of any payment if, in ENGINEER's opinion, it would be incorrect to make the representations to 29