HomeMy WebLinkAboutPrebid - BID - 6029 DRAKE ZIEGLER IMPROVEMENT PROJECT PHASE IIDrake/Zeigler Improvement Project Phase I I PRE -BID CONFERENCE FEBURARY 15, 2007 1:00 P.M. 281 N. College Ave. Conference Room A City of Fort Collins Engineering Dept. Street Oversizing Program HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • WARRANTY: o The Contractor will be required to warranty their work for 2 years after date of final acceptance. • CONSTRUCTION HOURS: o The operation of all machinery and vehicles must take place between the hours of ■ 7:00 A.M. thru 6:00 P.M. ■ The Contractor may request extended hours ■ The requests must be approved by the City of Fort Collins 3 days prior to any work. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S.E • CONSTRUCTION SURVEYING: o Provided by the Contractor o Lump Sum Bid • TRAFFIC CONTROL: o Provided by the City GEOTECHNICAL AND MATERIALS TESTING: o Provided by the Owner. It will be the Contractor's responsibility to schedule the testing. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S.2 • PROJECT MEETINGS: o Once a week at the construction trailer Located on site, time to be determined. • PROGRESS AND SCHEDULE REVISIONS: o Schedules shall be updated weekly. The Contractor may be required t submit additional schedules depending on the progress of the project. • HAUL ROUTES: o Arterial and Collector streets only. Contractor will not be allowed to use residential streets to access the site with trucks hauling materials. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S.0 • SITE CLEAN-UP: o The construction work and progresses shall be kept and accomplished in a neat, clean and orderly fashion. SITE COORDINATION WITH OTHER CONTRACTORS North Poudre Irrigation: o Contractor will need to coordinate with Ditch owner to make sure that ditch is open and running by April 15. Boxelder Ditch: o Contractor will need to coordinate with Ditch owner to make sure that ditch is open and running by April 15. • City of Fort Collins Treatment Plant: o Contractor will need to coordinate with the City when working on the FICRD Ditch so not to interrupt there discharge from the Plant. TRAFFIC CONTROL AND WORK AREA SAFETY: • TRAFFIC CONTROL: o The traffic control for this project will be paid for by the C and will include all costs for the traffic control associated with this project. o Detailed Traffic Control Plans are available for o Full Closure of Ziegler o Traffic flow for Lafarge o Siphon Installation o FICRD Relocation o Sewer Installation at Horsetooth TRAFFIC CONTROL AND WORK AREA SAFETY: • TRAFFIC CONTROL: o Traffic Control Plans must be submitted and approved 72 hours prior to the start of construction and before making each modification. o Full road closure will be allowed for Zeigler from Horsetooth Road. Environmental Drive will be open to City of Fort Collins Treatment Plant, Colorado State University Environmental Learning Center and Lafarge Northern. o Local Residential Access: o Local and business access must be maintained at all times for the business along Environmental Drive C TRAFFIC CONTROL AND WORK AREA SAFETY: • WORK AREA SAFETY: o The Contractor Shall provide, at the Contractor's expense, all work area safety control devices, such as barricades and safety fence around all excavations, trenches and drop offs. HIGLIGHTS FROM SPECIFICATIONS 201-01 C 9adng and Gmbbinp HIGHLIGHTS FROM SPECIFICATIONS: Removal: • 2n.0i Remove P"(RC►.CMP.►m • Veleeleutlena2 nenP HIGHLIGHTS FROM SPECIFICATIONS: Removals: 202-02 Remove Ver ical Curb 6 Gullet HIGHLIGHTS FROM SPECIFICATIONS: 202.03 Remove Sidewelk HIGHLIGHTS FROM SPECIFICATIONS 202-04 Remove Asphalt Pavement (5- —10- Depth) HIGHLIGHTS FROM SPECIFICATIONS 202-05 Remove 25X30 F)dsdng Structure INTRODUCTIONS • Street Oversizing Program: o Matt Baker -Program Manager 224-6108 o Mark Laken -Project Engineer 222-3546 o Craig Farver-Senior Construction nspector 222-0854 HIGHLIGHTS FROM SPECIFICATIONS 202-06 Remove Air Vac HIGHLIGHTS FROM SPECIFICATIONS 202-07 Remove Stoneddpe SPillway Per Plan Shoels 46.47 HIGHLIGHTS FROM SPECIFICATIONS 202-08 Remove Culvert HIGHLIGHTS FROM SPECIFICATIONS 202-09 Remove Irrigation Structure HIGHLIGHTS FROM SPECIFICATIONS 202-10 Abandon 6' Water tine (Statlon 96.50) Par Plan 202-11 Flow RU Abandoned e' Water Line HIGHLIGHTS FROM SPECIFICATIONS 202-12 Saw Cut Existing Asphalt 202-13 Remove Existing FCLWD Meter Pit and Meter HIGHLIGHTS FROM SPECIFICATIONS 202-14 Remove Exiatirq Concrete Headwal SPECIFICATIONS 203-01 UndnW ad Ezcava0on - Roadway HIGHLIGHTS FROM SPECIFICATIONS 203302 UndasslW Excavation (OudWi Channeq HIGHLIGHTS FROM SPECIFICATIONS 203-03 UnUassified Excavation - FICRD Channel HIGHLIGHTS FROM SPECIFICATIONS 203-04 Haul - Outfall Channel Excess Material HIGHLIGHTS FROM SPECIFICATIONS 203-05 Embankment - (CIP) - Roadway HIGHLIGHTS FROM SPECIFICATIONS 203-06 Embankment — (CIP) — OWfeII Channel HIGHLIGHTS FROM SPECIFICATIONS 203-07 Embankment— (CIP) — FICRD Channel HIGHLIGHTS FROM SPECIFICATIONS • 2030W Import Fill • 203.09 TOPOW — (Shipping, Stockpang, Piecing) —6' Depth — Roadway • 203.10 Topsoil — (SoipPing, Stockpiling, Placing) —6' Depth —Oudac Channel • 203.11 ToP&W — (Shipping, Stockpiling, Placing) —T Depth — FICRD Channel HIGHLIGHTS FROM SPECIFICATIONS • 203-12 Muck Exawtlon - Oulhll Chennel • 202.12 Muck Excavation - FICRD Chennel • 202-14 Potholing • 202-10 Flow FIII section Owr shallow UtlMlw • 203 10 Borrow ABC (Claw 0 or at _ (CIP) HIGHLIGHTS FROM SPECIFICATIONS 2 l abrsbw e r Wcm 225Rr �ftu .al r 2aeos sbrrelwe 0aamn Flw rM k Rlbu MN (I W Walwl (��sbrnb.. M.w.na Obpax 200 8buckr Muds Exemtlen 2 7 MrwMing HIGHLIGHTS FROM SPECIFICATIONS • 208-01 Erosion Control • 208-02 Wattles • 208-03 Slope Coco Mat with Seed • 208-04 Straw Bale Slope Protection HIGHLIGHTS FROM SPECIFICATIONS • 210.01 Modify Manhole • 210.02 Relocate f)deting Headgate HIGHLIGHTS FROM SPECIFICATIONS • 304-01 Gravel Access Road — 6• — (CIP) HIGHLIGHTS FROM SPECIFICATIONS 403-01 HBP Paver Patch — Grading S (2.6" Depth) — (PG 64-28) • 403-02 HBP Paver Patch — Grading SG (4" Depth) — (PG 68-28) HIGHLIGHTS FROM SPECIFICATIONS SM01 8'x8'x1 B' Type L Rip -Rap — 6' Topsoil(CIP Per DOWN) 50"2 22'X184'X18' Type L Rip -Rap 506-03 27X118'X1 B' Type L Rlp-Rap 606-04 240X15'X1 B' Type L Rip -Rap 506-05240'X30'X78' Type L Rip -Rap 506-06145'X78'X78' Type L Rip -Rap HIGHLIGHTS FROM SPECIFICATIONS we-074x XIrrye.LRIPAep sows wx1rX/r Type L RipAep 30eAa 16'x1Txr Type M Rlpaw 3ae-101r 030 RlpAap. Fepe 3sa14x Wa Ill 1r Type R O50 RlpAep Ou faa c- eM-12 Rlp Rap s 111 o 11Sm C~ HIGHLIGHTS FROM SPECIFICATIONS 601-01 20'Xrx84' Boxclaven— WNynpwallWsrmW We3arroe walls HIGHLIGHTS FROM SPECIFICATIONS • 601-02 Metal Orifice Plate for 20'X7'XB4' Box Culvert HIGHLIGHTS FROM SPECIFICATIONS • 60301 12• PVC C-900 • 60302 24• Class III RCP • 603-03 30• Class III RCP • 60304 36• Gass III RCP • 603-M 24 Class III RCP FES • 60306 30• Class III RCP FES • 60307 36• Clan III RCP FES HIGHLIGHTS FROM SPECIFICATIONS • eoe•08 Tie to Exiadnp Storm Drain Unas • 603-09 Concrete Headwall for 17 PVC • 603.10 2x48• RCP a Oubw Channel Siphon • 503-11 48•X12• RCP Tee • 80312 48' yodel Elbows 16.7' Concrete RCP • 003.13 2X4$o RCP Concrete Encasement Per Detail HIGHLIGHTS FROM SPECIFICATIONS 80344 Concrete En asemant on 12' PVC SDR35 Pipe 803-1512' PVC SDR35 • 803-18 30' Steel Encasement Pipe • 603-17 Tie 12' PVC SDR35 to Existing Manhole HIGHLIGHTS FROM SPECIFICATIONS • 604-01 4' Storm Sewer Manhole • 804-02 Type 13 Area Inlet • 60403 48' CuFoB Wells • 6" 48' Siphon Manholes —9 Diameter • 6D4-05 48' Siphon Inlet Box • 80408 48• Siphon Dutal Bout" HIGHLIGHTS FROM SPECIFICATIONS • 60"1 Concrete Spillway a Stoneridge Pond (45'XI') Per Detail INTRODUCTIONS • COFC DEPARTMENTS O John Stephen -Purchasing Agent 221=6777 o Gary Diede-City Engineer 221=6605 o Jay Barber Env. Spec. 224=6063 o Ralph Zentz-Assistant City Forester 221=6302 o Syl Mireles Traffic Eng, Tech 221-6815 HIGHLIGHTS FROM SPECIFICATIONS " 619-01 8" DIP CL-52 Water Main • 619-02 Plug w/Thrust Blocks • 619-031" Irrigation Service (Including Curb Stop, Corp Stop and Tapping Saddle) HIGHLIGHTS FROM SPECIFICATONS 619-04 6" Water Line Lowering At Cottonwood Box Culvert • $19-06 45 Degree Bends w/Thnut Blocks HIGHLIGHTS FROM SPECIFICATIONS • 2900.01 Seedkq INTRODUCTIONS • City of Fort Collins Engineering o Mark Laken -Project Engineer o Craig Farver-Senior Construction Inspector o JR Engineering o Mike Brake P.E. o DREXEL, BARREL & CO. o Curtis Stevens, E.I.T. ATTENDANCE • Please be sure to register • BID OPENING When: February 28, 2007 3:00 PAN Where: 215 North Mason Street (2nd Floor) IMPORTANT MILESTONES • AWARD CONTRACT o Approximately March 7, 2007 • PRE -CONSTRUCTION MEETING o Mandatory Meeting Prior to Start of Construction o Date to be determined after contract is awarded • CONSTRUCTION START DATE o March 14, 2007 o Contract allows 75 Working Days • SUBTANTIAL COMPLETION o June 29, 2007 • FINAL COMPLETION o Maximum allotted time =10 working days following completion SUMMARY OF WORK • Drake/Ziegler Improvement Project Phase II o The improvements for Drake Ziegler Phase II are from the end of the existing improvements to Phase I at Environmental Drive and continuing south in the new alignment which is west of the Fossil Creek Inlet Ditch, over the Foothills channel and tying into the intersection of Horsetooth Road. Several items included in the pro :ect are, a box culvert over the FICRD Ditch realignment of the FICRD Ditch, Outfall Channel work which includes a dual 48" siphon pipe under the Boxelder Ditch, FICRD Ditch and County Road #9, an Outfall Channel from the end of the Siphon Pipe going East along the Railroad Right -of -Way to the Poudre River. Also included in this project is hauling the excess material from the Rigden Outfall Channel over to the Zieger Right -of -Way and placing it to subgrade in preparation of Phase III. CONSTRUCTION DOCS: • Drake/Ziegler Improvements Phase II o Designed by JR Engineering ■ Sheet Ws 1-51, 69-74 Cottonwood Box Culvert o Designed by Drexel, Barrel & Co. o Sheet #.s 55-68 HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • SUPERINTENDENTS: o The General Contractor SHALL employ a full time Superintendent whose sole responsibility is to monitor and coordinate all facets of the work LIQUIDATED DAMAGES: o SUBSTANIAL COMPLETION: o The contractor will be given 75 working days to substantially complete the project. Substantial completion shall be defined as the completion of all earthwork, Siphon and Outfall Channel, Box Culvert and any other pertinent items as required for this project. If the Contractor goes past the 75 working days, damages in the amount of One Thousand Seven Hundred seventy eight Dollars ($1,778.00) for each calendar day will be assessed. o FINAL ACCEPTANCE: Final acceptance must be met within 10 days after substantial completion. Liquidated damages in the amount of Six Hundred Dollars ($600.00) per calendar day will be charged if this schedule has not been met.