HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 29682 SOUTH COLLEGE BIKE LANESTransportation Services Transportation Planning CHANGE ORDER FORM City of Fort Collins PROJECT TITLE: South College Avenue Bicycle Lanes PROJECT NUMBER: 41082028.0 CONTRACTOR: Felsburg Holt & Ullevig (PO #4405279) CHANGE ORDER NUMBER: 2 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1. & 2. See attached memo for reason and description of change. 3. The contract cost will increase by $3,000.00 4. The contract time will be extended to September 30, 2007 to complete the work. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: SUBMITTED BY: $209,887.00 $13,505.00 $0.00 $3,000.00 $226,392.00 DATE: DATE: 5424 77 REVIEWED BY: rvt IPr DATE: (Engineer) APPROVED BY: cc: City Clerk Contractor Purchasing Project File DATE: S I ZZ f 03 (Department 250 North Mason • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 224-6058 • FAX (970) 221-6239 PA FELSBURG CHOLT &. ULLEV IG engineering paths to transportation solutions March 6, 2007 Ms. Kathleen Bracke, AICP Senior Transportation Planner City of Fort Collins PO Box 580 Fort Collins, CO 80522 RE: Supplemental Budget Request — US 287/South College Avenue Bicycle Lanes FHU Reference No. 04-143 Dear Ms. Bracke: Kathleen, as you are aware, the US 287 Bike Lane Project is near final completion. From our understanding, it appears that right-of-way/easement negotiations are complete, or near completion, and we have now received comments from City engineering on the latest set of construction plans. However, as we have indicated in the last few progress reports, the project budget is essentially exhausted. As such, we are requesting additional funding to complete the last set of comments, both from City Engineering and from CDOT, to complete the project. Reasons for needing additional budget include: 1. Design changes related to the addition of three 6" steel pipes for Qwest facilities. 2. Right-of-way plan revisions related to installation of the steel pipes. 3. Visual simulations by sub -consultant FMLA for design/right-of-way discussion for the Harmony Center property. 4. Preparation of revised cost estimates. As you are aware, Change Order #1 was approved in December 2005 to accommodate additional work efforts in satisfying design issues at the Harmony Center and to also account for construction assistance. The current budget for this project is $223,392.00. Obviously, we are still working on finishing the design and construction has yet to start. Funds specifically identified for construction assistance were used to complete the design to this point. Following is a summary of our current budget status as reproduced from the last progress report dated January 12, 2007. Budget Summary Total Design Budget = $216,187.00 Invoiced to Date = $216,181.95 Remaining Budget = $ 5.05 Construction Assistance Budget = $7,205.00 Invoiced to Date = $7,052.75 Remaining Budget = $ 152.25 6300 South. Syracuse Way, Suite 600 Centennial, CO 801.11 tel 303.721.1440 fax 303.721.0832 www.$iueng.com info @1hueng.coin March 6, 2007 Ms. Kathleen Bracke, AICP Page 2 Based on recent comments provided by the City, we believe that we can provide the City and CDOT with a final set of signed/stamped construction plans and specifications for this project for a maximum additional budget of $3,000. At this time, we have not included a budget request related to providing construction assistance. If our services are needed in that area, we can address the necessary budget to assist you upon your request. We are looking forward to the completion and construction of this project. If you have any questions regarding this request, please do not hesitate to call me at 303-721-1440. Sincerely, FELSBURG HOLT & ULLEVIG Richard R. Follmer, PE, PTOE Senior Transportation Engineer