HomeMy WebLinkAboutCHANGE ORDER - RFP - 29609 AZTLANCHANGE ORDER 3
PROJECT TITLE: NortheideAztian Center PO. No 5555679
CONTRACTOR: Pinkard Construction Co.
CHANGE ORDER NUMBER: 3
In preparing change orders show in or r as asparate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change In contract cost 4. Change in contract time.
18r2. See attached sheet for detail.
3. The contract cost will increase by $34,456.00
4. The contract completion date will not be Wended.
AMENDED ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C_O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY.
ACCEPTED BY:
REVIEWED BY:
ACCEPTED BY:
APPROVED BY:
cc: Cnnhuc or
Purchasing
Rujed Re
Manager)
0.42%
1.60%
$8,292,616.00
$97,829.00
$0.00
$34,456.00
$8,424,901.00
DATE: /
DATE: ?/'J-! 0-7
He
m
#
Description oiRom
AddlDedud
Quantity
Und
UntCost
SUbtWal
Cost
Total
Cost
11
ARemate No. 11 - Not Accepted
12
Altemate No. 12 - Not Accepted
13
Altemats No. 13 - Accepted ands part of CO 6
14
Afternals No. 14 - Accepted ands part of CO 6
15
Ahaffsak No.15 - Accepted and a part of CO 6
16
Abemate No.16 - Not Accepted
17
Abmats No. 17 - Accepted and a part of CO 6
18
Aftemde No.18
LJqtAd Membrane, and nectedles
ADD
1
Is
$90 980.00
$90.880.00
!
Misc lrrpKdon and Patching
Blazer
4
days
$1 000.00
4 000.00
Gravel & Sand
ADD
1
is
$49,734.00
$49 734.00
Underslab Piping
ADD
1
1s
$20908.00
211f 9 0
Pipe vans u to Rod & Fleshings
ADD
1
Is
$1,671.00
$1,871.00
SUBTOTAL
$ISSA04.00
-
Prolect Monwer
ADD
10
hre
W00
$850.00
Supwirdendent n
ADD
4
hrs
SM.00
$200.00
Superkrlwxletton sks (2 meek)
ADD
40
hrs
$65.00
$5.200.00
Superfrftnderd bucK Rhone,computer (2 yme
ADD
1
Is
715.00
$715.00
FMMEngineer 2 waW
ADD
40
hre
$41.00
$32W.00
Field OBke Trailer wiphow, fw& printer,machine fumiture, camera
ADD I
1
Is
I $4 809.00
She fencing raft
ADD
2
wks
1 $225.00
SUBTOTAL
$181,933.00
MARKUP
$11 881.91
TOTAL
$193 IS4.00
$193 AO
19
Abenate No.19 - Not AccepW
20
Abrrkft No. 20 - Accepbed
Louver#1 asateel
'ADD
1
Is
$135.00
$135.00
0
7
$0.00
$0.00
07
I $0.00
$0.00
0
7
.00
$0.00
0
7
$0.00
$0.00
SUBTOTAL
$135.00
ProJedM!TW
1 0.16
hr
$65.00
$10A0
SUBTOTAL
145A0
MARKUP
$9.32
TOTAL
$ 54.72
$154.72
Item
Description of item
Amount
1
Added rip rap at the Poudre River at the direction
of State CDPHE. Delete the requirement for
replacing the culvert pipe at the river. Existing rip
rap to remain, add 40' x 14' of rip rap at the river.
$3,333.83
2
City requested additional parking lot 9 spaces &
additional Sidewalk
$15 149.54
3
Increase the size of the storage room adjacent to
the gym.
$16,011.00
4
Add for additional Storage Room to 2nd Level
including fire taping, lighting, mechanical and
sealed concrete.
$7,725.37
5
Impacts from Art in Public Places
arre
to a Later
Date
6
Increase area of second floor fitness area by
extending south end out to align with 1st floor.
(Delete car item #42-Delete Access to Terrace)
$9,349.71
7
Add a storage room for Activity Room B #141
8,258.48
8
Relocate vestibule 100 and extend corridor.
$16,689.08
9
Alternate No. 17 - Storage 145 was modified to
allow access both from the Gym and the Activity
Room, adding 4 doors.
$4,937.96
10
Added Fire Sprinkler room on east side, reworked
the mechanical area to include a separate
Telecom Room.
$11,139.00
11
Add electric snow melt to the sidewalk on the
Worth side of the building for 1501f of 6' walk.
$23,521.93
12
Use 48- 2x4 fluorescent T-5
14,179.13
13
Add sod cost around skate park
$3,092.27
14
Add cost of trees (9 ea 6' evergreens) added to
north side of gym.
$3,195.49
15
Provide a retaining wall around the new
transformer location
$3,608.63
16
Relocate the existing irrigation pumphouse and
furnish & install the site water service utilities.
SEE attachment B
$11,331.60
17
Delete handball/racketball courts
($37,259.46)
18
Return Environmental Allowance
($79,807.50)
TOTALI
$34,456.06
Item
#
Description of Rem
AddlDeduct
Quantity
Unit
Unit Cost
Unit Subtotal
Cost
Total Cost
1
Added rip rapt the Poudre River at the direction of
Slate CDPHE. Delis the requirement for replacing the
advert pipe at the river. Existlng rip rap to remain, add
49 x IN of rip rap at On river.
Delete ddwmk replacement over Pipe
DEDUCT
-8
SF
$3.0
150.00
Rip rep
ADD
93
TONS
$42.001
$3 908.0
18" ploe
DEDUCT
LF
$58.001
($1,740.004
18' Flared end section
DEDUCT
EA
$1 026.
052.00
Remove e)Mng debris
ADD
1
LS
$3,000.00
$3.000.001
SUBTOTAL
$2 964.00
Proilect Manager
2.6
HRS
$05.
$169.001
SUBTOTAL
$3,133.001
MARKUP Fee 4.75% Bond 1% Irw .W%
$200.831
TOTAL
133
333.
$3 333.8
2
City requested additional parking lot 9 spaces &
additional ald:vvalk
Asphalt
ADD
18
SY
$17.951
$3231.0
Curb & Gubw
ADD
117
LF
$13.001
$1 521.00
Curb &Gutter
DEDUCT
-81
LF
$13.
($1,053.00)
Sidamk of lanla'tball court
ADD
2860
SF
$3.001
$8 580.00
Agar Linille
ADD
1
LS
$1 low.10
31.600.001
Native Seed
DEDUCT
-1620ISF
$0.($145.8011
0
71
$0.001
so-0011
SUBTOTAL
1
$13.733.201
Proled Manager
2.751HRS
585.
$118.751
Superintendent
5 HRS
$85-
$325.00
SUBTOTAL
$14,236.95
MARl(UP Fee4.75% Bond 1% Ins.06%
912.59
TOTAL
$15149.54
$15149.5
3
Increase the sloe of the ato a room adjacent to the ym
Grade Bearn
ADD
84
SF
S 2050
$ 1.722.00
Hal Pier
ADD
1
LS
$ 994.00
$ 994.00
Illilasonry
ADD
336
SF
$ 15.00
$ 5,040.00
Structural Steel
ADD
338
SF
$ 14.00
$ 4,704.00
Roofing
ADD
336
SF
$ 4.50
$ 1512.00
FMd&
ADD
336
SF
$ 5.00
$ 1,680.00
Exawallon
ADD
22
CY
$ 16.50
$ 359.00
SUBTOTAL
$ 16,011.00
ftled Manager
HRS
$ 65.00
$ -
Sr. Estimator
HRS
79.00
$
SUBTOTAL
$ 16,011.00
MARKUP Fee 4.75% Bond 1%, Ins .72%
$ -
TOTAL
$ 16,011.00
$ 16.011.00
41firstaft,
Add for additional Storage Room to 2nd Level including
Wnlh mechanical and sealed concrete.
Add Additional Storage Space
450SF
$ 18.00
$ 8,100.00
Revisedoor
DEDUCT
-1
LS
$ 650.00
$650.00
Mirror Revisions
DEDUCT
450
SF
1.00
50.00
07
$
$
0?
$
$
SUBTOTAL
$ 7,000.00
Prolloct Manager
2
HRS
$ 65.00
$ 130.00
Superiniandert
2
HRS
S 65.00
$ 130.00
SUBTOTAL
$ 7,260.00
MARKUP Fee4.75% Bond I% Ins.65%
$ 465.37
TOTAL
$ 7,725.37
$ 7725.37
ncreasearea o second or litnews area by wdending
south and out to align with let floor.
Steel - Roof
ADD
414
SF
$ 13.00
$5 382.00
Steel - Modify Framing
DEDUCT
-1
LS
$ 2,000.00
$2 000.
ErderlorWsd
ADD
252
SF
$ 40.00
$ 10080A0
Roof - NA
07
$
S
Fkxxin
ADD
414
SF
$ 8.00
$ 3312.00
ceg"
ADD
414
SF
$ 1.75
$ 724.50
Item
#
Description of Item
Add/Deduct
Quantity
Unit
Unit Cost
Unit Subtotal
Cost
Total Cost
Mechanical
ADD
414
SF
$ 8.00
$ 3,312.00
Electrical
ADD
414
St.
$ 7.00
$ 2,896.00
Design
ADD
1
S 1700.00
$ 170D.00
ReIM etc. CAR Item #42
DEDUCT
$ 17 630.00
SUBTOTAL
$ 7,778.50
Pro
7.5
HRS
$ 65.00
$ 487.50
Superintendent
8
HRS
$ 65.00
$ 520.00
SUBTOTAL
$ 8,786.00
MARKUP 4.75%, Bond 1%, Ins .85%
$ 583.21
TOTAL
$ 9,349.71
$ 934971
7
Add a storage room for Activity Room
Door for stprqgie
ADD
2
EA
$ 1,100.00
$ 2,200.00
Doom Into room
ADD
3EA
$ 1,100.00
$ 3,300.00
Walls
ADD
308
SF
$ 6.75
$ 2.079.00
07
$
$
s
SUBTOTAL
$ 7,579.00
.Prow Manager
1.3
HRS
S 65.00
$ 84M
Superintendent
1.5
HRS
$ 65.00
$ 97.50
SUBTOTAL
S 7,761.00
MARKUP(Fee 4.75% Bond'1% Ins.66%
$ 497.48
TOTAL
$ e 258A8
$ 8,258.48
8
ule 100 and extend corridor.
Exterior Wall
ADD
240
SF
$ 24.50
$ 5.800.00
Windows on South
ADD
52
SF
$ 48.00
3 2,496.00
Roof Structure and Roof
ADD
144
SF
$ 27.00
$ 3,1188.00
Grade Gems
ADD
100
SF
$ 20.50
$ 2 0,90.00
Helical Pks
ADD
1
EA
$ 9W.00
$ 996.00
SUBTOTAL
$ 15 310.oD
r
2.75
HRS
$ 65.00
$ 178.75
Superintendent
3
HRS
$ 65.00
$ 195.00
SUBTOTAL
$15,683.75
MARKUP Fee4.75% Bond 1% Ina.88%
$1,005.33
TOTAL
$18,889.08
$ 18,889.08
NO. wage 145 wemodifliTio-M-w-
scene troth from the Gym and the AdMty Room,
riding 4 doors
Down
ADD
4
LEAFS
$ 1.100.00
$ 4,400.00
0?
$
g
0?
$
$ _
0?
$ -
$ -
0?
$
$
SUBTOTAL
54.40D.00
Project Menem
1
HR
$ 65.00
$ 65.00
Superintendent2.7
65
$ 175.50
SUBTOTAL
$4,640.50
MARKUP Fee4.75% Bond 1% ins.66%
$297.46
TOTAL
$4,937.96
$ 4,937.86
10
Added Fire Sprinkler mom on east side, reworked the
mechanical area to include a separate Telecom Roan.
Doors
ADD
2
LEAFS
$ 1,100.D0
$ 2,200.00
Mason Wall for Extra Room
ADD
572
SF
S 14.00
$ 8 0D8.00
0?
$
$
0?
$
$
07
$
$
SUBTOTAL
$10 208.00
r
2
HRS
$ 65.00
$ 130.00
S
2
HRS
S 65.00
$ 130.00
SUBTOTAL
$ 10 468.00
MARKUP Fee 4.75% Bond 1 % Ins .60%
$671.00
-
TOTAL
$ 11,139.00
$ 11,139.00
11
snow men 13IMage-mikan theno aldi
of the buk kg for 150 6 of V walk
Item
#
Description of Item
Add/Deduct
Quantity
Unit
Unit Cost
Unit Subtotal
Cost
Total Cost
Sidewalk Snowmelt System
ADD
1
LS
$ 19 585.00
$ 19,585.00
Design
1
LS
$ 2,0D0.00
$ 2,000.00
SUBTOTAL
$ 21585.00
Project Miumer
4
HRS
$ 55.00
$ 260.00
Supersintanderit
4
HRS
$ 65.00
$ 260.00
SUBTOTAL
$ 22105.00
MARKUP
$ 1416.93
TOTAL
$ 23 521.93
$ 23 521.93
12Use48-2*41luoreacard
1-0
48 2x4 Fluorescent T-5 In Neu of 4 400 watt
ADD
1
LS
$ 13,130.00
$ 13130.00
SUBTOTAL
$ 13,130.00
Project Manner
2
HRS
$ 65.00
$ 130.00
SLprintandent
1
HRS
$ 65.00
$ 65.00
SUBTOTAL
$ 13 325.00
MARKUP
S 854.13
TOTAL
$ 14,179.13
$ 14179.13
13
Add sod cod around
Sod around almle park
ADD
1
LS
$ 2,601.00
$ 2,646.00
SUBTOTAL
$ 2 846A0
Manager
2
HRS
$ 05.00
$ 130A0
!
Say!
2
HRS
$ 65.00
$ 130.00
SUBTOTAL
$ 2 W&00
MARKUP
$ 186.27
TOTAL
$ 3,092.27
$ 3,09127
14
Add cod of tress (9 ea V everWeens n
side of gym.
9 es 0 evergreens
ADD
1
LS
$ 2 808.00
S 2 8 88.00
SUBTOTAL
$ 2,808.00
Project Menalfar
2
HRS
$ 65.00
$ 130.00
Superintendent
1
HRS
$ 65.00
$ 65.00
SUBTOTAL
$ 3,003.00
MARKUP
$ 192.49
TOTAL
$ 3195.49
$ 3,195.49
15
Provide a relainkg wag at new transformer location
Wadi by MIR Bros.
ADD
1
LS
$ 3,180.00
$ 3,180.00
LS
$ -
LS
$
SUBTOTAL
$ 3180.00
1
MR
$ 65-00
$ 65.00
Sr. Project Estimator
2.25
HRS
$ 65.00
$ 148.25
SUBTOTAL
S 3,391.25
MARKUP
$ 217.38
TOTAL
$ 3,608.63
S 3,608.63
16
Relocate the eahting Wrotion pumphoueeand furnish
& Install the sike water service utilities.
Water Service Cost from E-Z Excavation
39 857.00
Ies maker vault
-5876.00
Sewer Service Cost from E-Z Excavation
5.617.31
Pump House Cost
5,844.00
tNatar
P Coat
251,
-27251.OD.00
ro ewer CAR - leave f all
$7 440
440 00
Pro Pump7
House Cast
1 00
Subtotal24,431.31
Pr4act Mgr
5
HRS
325.00
Superintendent
10
HRS
650.00
Field Enalnew
3
HRS
S 123.00
SUBTOTAL
S 10.649.00
MARKUU
$ 683.00
TOTAL
S 11331.80
$ 11,331.60
171
Deduct orWnal cost for handball court,
Hendbticourt
DEDUCT
-1
LS
$ 39040.00
S39040.00
Seed & Iffilliption
ADD
1
LS
$ 1.10 i
$ 3 0.00
07
$
$
07
$
$
Hem
#
DesCrlption of Item
AddiDeduct
Quantity
Unit
Unit Cost
Unit Subtotal
Cost
Total Cost
-
SUBTOTAL
$35 080.o0
Project Manager
1
HR
$ 85.00
$ 65.00
SUBTOTAL
$35 015.00
MARKUP
(V.244.46)
TOTAL
$37 259.4
37 259.48
18
Return Environmental Allowance
1
LS
$ 75 000.00
75 000.00
MARKUP
4 807.50
TOTAL
(79,807.50)
CHANGE ORDER 4
PROJECT TITLE: Northside Azdan Center PO. No 5565679
CONTRACTOR: Pinkard Construction Co.
CHANGE ORDER NUMBER: 4
preparing change orders show In order as eeparare numoe
1. Reason for change. 2. Description of change.
3. Change in contract cost 4. Change in contract time.
;10$2. See attached sheet for detail.
3. The contract cost will increase by $200,647.00
4. The contract completion date vdi be extended by 14 calendar days
AMENDED ORIGINAL CONTRACT COST
$8.292,616.00
TOTAL APPROVED CHANGE ORDERS
$97.829.00
TOTAL PENDING CHANGE ORDERS
$34,455.00
TOTAL THIS CHANGE ORDER
$200,647.00
TOTAL % OF THIS CHANGE ORDER
2A2%
TOTAL C.O. % OF ORIGINAL CONTRACT
4.01%
ADJUSTED CONTRACT COST
$8,625,548.00
(Assuming all change orders approved)
ACCEPTED BY:
DATE:
ct ntative
'
DATE: l a, I
ACCEPTED BY:
ject Manager)
REVIEWED BY:�
DATE:
(Engin
ACCEPTED BY:
DATE:
rtment Head) rr ^
APPROVED BY: �
,d� DATE: 31,
r �innl
cc: Codredor
Purchmainp
Pmjed File
item
#
Description of Item
Amount
1
ARemate No. 1 - Accepted for Phase 1
construction of parking and drives only.
Phase 2 and 3 will be priced and offered
when those phases occur
not accepted for payment
2
Alternate No. 2 - Not Accepted
3
Alternate No. 3 - Not Accepted
4
ARemate No. 4 - Not Accepted
5
ARemate No. 5 - Not Accepted
6
Alternate No. 6 - Not Accepted
7
Alternate No. 7 - Not Accepted
8
ARemate No. 8 - Accepted
$6,898.96
9
Alternate No. 9 - Not Accepted
10
ARemate No. 10 - Not Accepted
11
ARemate No. 11 - Not Accepted
12
Alternate No. 12 - Not Accepted
13
Alternate No. 13 - See OCO #3
14
Alternate No. 14 - See OCO #3
15
Alternate No. 15 - See OCO #3
16
Alternate No. 16 - Not Accepted
17
Alternate No. 17 - See OCO 03
18
Alternate No. 18 -Accepted
$193,595.00
19
Alternate No. 19 - Not Accepted
20
Alternate No. 20 - Accepted
$155.00
TOTAL
$200,646.96
fte
m
9
Description of item
AddlDeduct
Quantty
Unit
Unit Cost
1
Subtotal
Cost
Total
Cost
1
Almmats No.1 - Accepted for Phase 1 construction of parking and d6m only.
Phase 2 and 3 will be priced and offered when those phases occur.
'
EaAhmrk
ADD
1
is
$18w.00
31,600.00
SUBTOTAL
$1ew.00
Project Manager
ADD
1
Hr
$65.00
$e5.00
Supermlenderyt
ADD
2
Wr
$65,w
$130.00
SUBTOTAL
$1 796.00
MARKUP
$115.06
TOTAL - riotaccepted for pWmnt
$1 OOQ
2
Al6amts No. 2 - Not Accepted
3
Aitemate No. 3 - NotAcoe
4
No. 4-NotAxa
5
Albmaie No. 5 -Not
6
AttemaesNo. 6- Not Accepted
7
Aitemate No. 7 - Not Accepted
do water closets
ADD
i
Is
SM.w
$980.00
$0.00
SUBTOTAL
$9wJOO
Pmiect Manager
ADD
1.15
Hr
$85.00
$74.7e
SUBTOTAL
$1,054.75
MARKUP
$67.61
TOTAL
$1122.36
8
Athade No. 8 - Accepted
Carpet
DEDUCT
-1
1s
$2 70D.w
.760.
Wood Flooring
ADD
1
Is
$6 850.w
8.650.00
Helical Piles fires loiter from Sh wbiral Engirmr to
ADO
4
as
$5713.00
$2 312.00
SUBTOTAL
02,00
ed M e/
ADD
2
hm
Sm.00
130.00
Superwoolklerit
ADD
23
hm
$65.00
$149.50
SUBTOTAL
$6.481.50
MARKUP
$415.4e
TOTAL
96
g9em
8
Altemah 4otAccapeod
10
Aitemaea No. 10 - Not