Loading...
HomeMy WebLinkAbout101137 PINKARD - CONTRACT - CONTRACT - 29609FIRST WRITTEN AMENDMENT TO THE P983 NORTHSIDE AZTLAN CENTER DESIGN/BUILD AGREEMENT This First Written Amendment to the P983 Northside Aztlan Center Design/Build Agreement is entered into by and between the City of Fort Collins, Colorado, a municipal corporation (the "Owner"), and Pinkard Construction Co., (the "Design/Builder"). 1. Owner and Design/Builder entered into the P983 Northside Aztlan Center Design/Build Agreement dated August 2, 2005 for the design and construction of a 49,980 square foot Northside Aztlan Center located at 112 East Willow Street, Fort Collins, CO (the "Project"). 2. Design/Builder has identified unprecedented cost escalations in the materials to construct the Project and has asked Owner to amend the Guaranteed Maximum Price (the "GMP"). 3. Owner agrees with Design/Builder that materials necessary to construct the ------ Project have undergone cost escalation higher than the average annual historical level, and in this isolated instance can agree to amend the contract GMP. 4. Therefore, the parties agree to amend the Agreement as follows: a. By modifying Section 7.01 of Article 7. GUARANTEED MAXIMUM PRICE by deleting the present language and adding the following: 7.01 DESIGNIBUILDER guarantees that the maximum obligation of OWNER for the su,n of the Cost of the Work plus the DESIGNIBUILDER's Fee will not exceed $8,292,616 (the "GMP", which includes $727,000 for Design Professional Services, Preconstruction Services, and reimbursables) subject to increases or decreases for changes in the Work. Any unused contingency shall be shared as provided in Paragraph 7.02. b. By modifying Section 12.01 of Article 12. CONTRACT DOCUMENTS by adding the following subparagraph L: L. The Design Build Estimate dated July 25, 2005, is amended in the following respects: 1. The parties agree that the sum of $199,114, which is the additional contribution of funds by OWNER to increase the GMP, is allocated to construction line items. 2. The parties agree that the Project Contingency line item is reduced by $180,000.00 to $104,958 and the parties agree the $180,000 is allocated to construction line items. 3. The parties agree that DESIGN/BUILDER shall reduce its Builder's Fee line item by $60,000 to $285,267 and allocate the $60,000 to construction line items. 4. The parties agree to scope reductions and value engineering per Attachment #1. 5. All other provisions of the Agreement shall remain in full force and effect unless modified by a subsequent amendment. THE CITY OF FORT COLLINS, COLORADO By �! Jam9B'NeHjI1 II, CPPO, FNIGP Director of Purchasing and Risk Management Date: James W inkard, Jr., President Da : A Corporate Secretary