HomeMy WebLinkAboutCHANGE ORDER - BID - 6019 COMMUNITY PARKS SIDEWALKSCHANGE ORDER NO. 1
PROJECT TITLE:
Community Parks Sidewalks
CONTRACTOR:
Construction Concepts Inc
PROJECT NUMBER:
6019
PURCHASE ORDER NO.:
DESCRIPTION:
Import Material Gradation Change
1. Reason for change: The gradation and geotechnical specification table for the import fill material is
inaccurate
2. Description of Change: Attached is an update to the requirements for the import fill material requirements.
See attached
3. Change in Contract Cost: $0.00
4. Change in Contract Time: 0 calendar days
ORIGINAL CONTRACT COST
$320,407.76
TOTAL APPROVED CHANGE ORDER
$0.00
TOTAL PENDING CHANGE ORDER
$0.00
TOTAL THIS CHANGE ORDER
$ -
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
0.00%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
0.00%
ADJUSTED CONTRACT COST
$320,407.76
(Assuming all change orders approved)
ACCEPTED BY: h DATE: Z - 7
Contractor's Representa i e
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: V DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Architect
Contractor Engineer
Project File Purchasing
Project: Community Parks Sidewalks
Bid # 6019
Change to specification section per Change Order #1
3.04 Embankment Construction
Imported Soils should conform to the following:
Gradation (ASTM C136)
3-Inch 100
No. 200 Sieve 10 - 40 (max)
• Liquid Limit 30% (max)
• Plasticity Index 15% (max)