HomeMy WebLinkAboutCHANGE ORDER - BID - 6019 COMMUNITY PARKS SIDEWALKSCHANGE ORDER NO. 1 PROJECT TITLE: Community Parks Sidewalks CONTRACTOR: Construction Concepts Inc PROJECT NUMBER: 6019 PURCHASE ORDER NO.: DESCRIPTION: Import Material Gradation Change 1. Reason for change: The gradation and geotechnical specification table for the import fill material is inaccurate 2. Description of Change: Attached is an update to the requirements for the import fill material requirements. See attached 3. Change in Contract Cost: $0.00 4. Change in Contract Time: 0 calendar days ORIGINAL CONTRACT COST $320,407.76 TOTAL APPROVED CHANGE ORDER $0.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $ - TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.00% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 0.00% ADJUSTED CONTRACT COST $320,407.76 (Assuming all change orders approved) ACCEPTED BY: h DATE: Z - 7 Contractor's Representa i e ACCEPTED BY: DATE: Project Manager REVIEWED BY: V DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing Project: Community Parks Sidewalks Bid # 6019 Change to specification section per Change Order #1 3.04 Embankment Construction Imported Soils should conform to the following: Gradation (ASTM C136) 3-Inch 100 No. 200 Sieve 10 - 40 (max) • Liquid Limit 30% (max) • Plasticity Index 15% (max)