Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CORRESPONDENCE - BID - 5811 SNOW AND ICE
Bid #5811 04-05 Snow and Ice Removal Tally Sheet - Resources List Firm Name End Dumps Foutch & Foutch Inc Hageman Earth Cycle Barker Construction Co Inc Tandem Dump Trucks Capacity (Yds, hp, ortons) Rate /Hr $55.55 $65.00 !, 60 cyd $72.50 18-20 cyd # of Units 21f 1 6 De- Icer per # Blade/Broom Phone # i06-4141 21-7173 i82-9526 Capacity (Yds, hp, De- ortons) Icer Firm Name Rate /Hr # of Units per # Blade/Broom DeGroot Trucking Inc $43.00 2 568-7840 O'Neill Trucking $45.00 14.5 cyd Rock Box 1 568-7927 Barker Construction Co Inc $45.00 10-12 cyd 6i, Bivens Trucking $48.00 14 cyd 3I 493-2347 T&J Trucking Inc $48.00 12-13 cyd 1 568-9533 Doug Weitzel Excavating $48.00 10 cyd 2; 1482-4983 Blade sand Foutch & Foutch Inc $50.00 21 spreader fir- w ' $52.00 ',15 cyd 1 962-9370 Alarids Trucking 1 $53.00 ',14 cyds 1, 223-1139 E & LL Trucking $53.00 'Pete 12-14 cyds 1 203-1821 E & LL Trucking $53.00 Mack 10-14 cyds 1, Hageman Earth Cycle $55.00 38 cyd 1 Hageman Earth Cycle $55.00 20 cyd 1' Single Axle Dump Trucks Capacity (Yds, hp, or tons) Firm Name Rate /Hr Foutch & Foutch Inc $40.00 $45.00 8 cyd Fuller Landscaping $60.00 ! 5 cyd Wheel Loader Capacity (Yds, hp, or tons) Firm Name Rate /Hr Fuller Landscaping $60.00 2 cyd Foutch & Foutch Inc $80.00 4.5 cyd Foutch & Foutch Inc $80.00 3.5 cyd Barker Construction Co Inc $85.00 3 cyd Bivens Trucking $85.00 3 cyd De- Icer # of Units per # Blade/Broom 2, 1 2 484-4833 De- Icer # of Units per # Blade/Broom 1 1 1 5 1', w/12' Angle Blade Earth Cycle $95.00 4 cyd 2 $125.00/hr w/12' Angle Blade Earth Cycle $95.00 3 cyd 2' $125.00/hr Motor Grader Capacity (Yds, hp, or tons) Firm Name (Rate /Hr Barker Construction Co Inc $95.00 Bivens Trucking $95.00 IJD777BH Foutch & Foutch Inc $70.00 1 150 hp Other Large (i.e. Unimog) Capacity (Yds, hp, or tons) Firm Name Rate /Hr Foutch & Foutch Inc $90.00 DTF Dozer Backhoe Capacity (Yds, hp, or tons) Firm Name Skid Steer Firm Name Foutch & Foutch Inc Barela's Lawn Maintenance Hageman Earth Cycle Fuller Landscaping Bivens Trucking Small Tractor Firm Name Foutch & Foutch Inc Monarch Landscape Mgmt Fuller Landscaping L & L Landscape Rate /Hr Capacity (Yds, hp, or tons) Rate /Hr j $40.40 I $50.00 $55.00 $60.00 165 hp $65.00 Daewoo 801 Capacity (Yds, hp, ortons) Rate /Hr $30.00 120 hp $50.00 $60.00 65 hp $60.00 48 hp Other Small (i.e. Walker Mower) De- Icer # of Units i per # Blade/Broom 5 14' Blade 1added 04-05 De- Icer # of Units' per # Blade/Broom 1 De- Icer # of Units per # Blade/Broom De- Icer # of Units per # I Blade/Broom 2' Blade 2' 482-5587 1, Blade 1 1 De- Icer # of Units per # Blade/Broom 1 Blade/blower 3 Blade 482-4036 1 Blade 8' 1 Blade Capacity (Yds, hp, De- ortons) Icer Firm Name Rate /Hr # of Units per # Blade/Broom Fuller Landscaping $45.00 '20 hp 2 Blade 42" Walk -Behind Snow Blower Capacity (Yds, hp, De- ortons) Icer Firm Name Rate /Hr # of Units per # Blade/Broom arela's Lawn Maintenance $35.00 10 hp 1 I Pick -Up with Plow Capacity (Yds, hp, De - Firm Name 1 Rate /Hr # of Units per # froutch & Foutch Inc $30.30 1 ton -Foutch & Foutch Inc $30.30 :3/4 ton 1 Fuller Landscaping $60.00 1 ton 1 Monarch Landscape Mgmt $75.00 1 ton 4 Bivens Trucking $85.00 3/4 ton 1 Hand Shoveling & De-ker Application Capacity (Yds, hp, ortons) I Firm Name Rate 1Hr )utch & Foutch Inc $25.00 & L Landscape $27.00 onarch Landscape Mgmt $30.00 3rela's Lawn Maintenance $30.00 filler Landscaping $35.00 a Blade/Broom 10'Blade 10'Blade 8.5' Blade 8' Blade 7' De- Icer # of Units per # Blade/Broom Market value $1.00 $0.35 $0.50 $1.00 581-1956 Cell # 7-4076 6-4684 7-0915 1-4196 7-9606 1134 566-1710 Bid #5811 Snow and Ice Removal_ Tally Sheet - Resources List End Dumps Firm Name Rate /Hr I Phone # Cell # Foutch & Foutch Inc $55.001f506-4141 g y d (� bola OK a , (.aG<< I lr7-d- a eman Earth Cycle $65.00 221-7173 Barker Construction Co Inc $72.50 �482-9526 Tandem Dump Trucks Firm Name R I568-7840 DeGroot Trucking Inc � $43.00 566-3274 O'Neill Trucking $45.00 1 568-7927 217-4076 Barker Construction Co Inc_ $45.00 10-12 cyd Chuck Hoffman $47.80 1498-0449 Bivens Trucking $48.00 i 493-2347 566-4684 T&J Trucking Inc $48.00 1568-9533 227-0915 Doug Weitzel Excavating $48.00 '482-4983 Elmer S. DeWitt $48.50 1481-4777 Foutch & Foutch Inc $50.00 A B Trucking $52.00 II962-9370 1 a� A1ids Trucking $53.00 1 223-1139 6K & LL Trucking $53.00 i203-1821 E & LL Trucking $53.00 Hageman Earth Cycle $55.00 38 cyd Hageman Earth Cycle $55.00 '12o cyd Single Trucks p Firm Name Foutch & Foutch Inc Doug Weitzel Excavating Fuller Landscaping Wheel Loader Firm Name Fuller Landscaping Foutch & Foutch Inc Foutch & Foutch Inc Barker Construction Co Inc Bivens Trucking Hageman Earth Cycle I481-4196 A /Na Id I217-9606 Rate /Hr $45.00 8 cyd _y $60 00 1484-4833 1566-1134 Rate /Hr $60.00 2 cyd $80.00 4.5 cyd $80.00 3.5 cyd $85.00 1,3 cyd $85.00 3 cyd $95.00 4 cyd 3 �f61RNt W"IlFAY. �(OAb