Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2951503/01/2007 THU 15:26 FAX 970 221 6586 CITY OF FT COLLINS CLRS 11001/001 CHANGE ORDER NO. #32 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: Building modifications 1. Reason for change: 2x backing for m panel, break metal wraps at mullions, entry wall redesign in maint. Fee., brackets for mag locks, flashing and waterproof membrane at restrooms, paint exposed ductwork and water heater shelf, weather days for dec and jan 2. Description of Change: 2x backing for m panel, break metal wraps at mullions, entry wall redesign in maint. Fac., brackets for mag locks, flashing and waterproof membrane at restrooms, paint exposed ductwork and water heater shelf, weather days for dec and jan ". C)'kr, ::RC,C' a�SIs 3. Change in Contract Cost: $8,018.33 4. Change In Contract Time: 8 TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C,O'S ADJUSTED CONTRACT COST orders ACCEPTED BY: Contractor's Rep ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED SY: Purchasing Agent over $30,000 cc: City Clerk ArchRect Contractor Engineer Project File Purchasing [' oq $12,0 I A9 .97 DATE: 2 2 m DATE: a1 �i •,0 DATE: DATE: DATE: