HomeMy WebLinkAboutCHANGE ORDER - BID - 5998 LPATH BERM EROSION PROTECTION MEASURES (2)FEB-05-2007 MON 04 (01 PM CFC EKG. FAX NO. 9702216378 P. 08
Change Order Form
Qtyof Fort Collins
Engineering Department
PROJECT TITLE: E, Prospect - LPATH Berm Erosion Protection Measure
PROJECT NUMBER: 30621700.6 (Bid No. 5998)
CONTRACTOR: J2 Contractors (PO No. 6607396)
CHANGE ORDER NUMBER: 4
n preparing change *roars Row In order as separate nu"mMeNea paragraphs the e owing:
1. Reason for change. 2. Description of change,
3. Change in contract cost, 4. Change in contract time.
1&2. See attached sheet for detall.
3. Tito contract cost will increase by $ 1,877.59
4. The contract time will increase by 2 working days.
ORIGINAL CONTRACT COST
$999,996,50
TOTAL APPROVED CHANGE ORDERS
$10,335,76
TOTAL PENDING CHANGE OR
($29,689.55)
TOTAL THIS CHANGE ORDER
$1,877.59
TOTAL % OF THIS CHANGE ORDER
0.19%
TOTAL C,O, % OF ORIGINAL CONTRACT
.1.75%
ADJUSTED CONTRACT COST
$982,520.19
(Assuming all change orders approved)
ACCEPTED BY!
( Contractor's
REVIEWED BY: _ t
(Engineer) �'
ACCEPTED BY:
(Project Manager - Engineering)
DATE: zI/ /0'7
DATE: D T
DATE:
ACCEPTED BY:DATE:
(Projelbt Manager- Natural Resources)
rJ ACCEPTED BY: ' A DATE:.
(Project Manager - Stormwater)
ACCEPTED 9Y: DATE:.
apartment Head)
APPROVED BY: _._ , j DATE:
(Purchasing Agent over $30,000)
cc; cookaclor SO.oe Enalneerlrg
Purchoeing S1,61Y.89 Natural ROBDOM63
Projeal File Sao] Slormwalar
Wnainaarina TiPbO 1TMP0+. 191 Nnrtf, rnrlaaa Avanun. 13 11 Rnv ARA . rmr r,.n:... r^ anc.. Acv _ inwn.... I..-
Engineering Department
281 North Collage Avenue - P.O. Boa 580 - Fort Collins, CO 80522-0580
Tel. (970) 221-6605 -Fax: (970) 221-6178
Change order
Project. LPATH Berm Erosion Protection Measure
Contract IBid No.:5998
Contractor. J-2 Contracting Company
CHANGE ORDER NO.: 4 (Natural Resources Only)
DESCRIPTION:
1. Reason for Change. Additional work requested by Natural Resources
2. Description of Change: See attached plan sheet
Item Item Description Unit Unit Price Adjust
$ Quanti
25 Excavation and Embankment of On Material at South Berm CY 1.69 1111
Total Adjustment
Adjust
Amount $j
1,B77.59
1,877.59
Current
QuantityQuanti
New
0
1111
3. Change in Contract Cost $1,877.59
4. Change in Contract Time: 2 working days