HomeMy WebLinkAboutCHANGE ORDER - BID - 5998 LPATH BERM EROSION PROTECTION MEASURES (3)FEB-05-2007 MON 04:00 PM CFC ENG. FAX NO, 9702216378 P. 06
Change Order Form
City)f Fort Collins
$ngineering Department
PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure
PROJECT NUMBER: 30521700.6 (Bid No. 5998)
CONTRACTOR: J2 Contractors (PO No. $507396)
CHANGE ORDER NUMBER: 3
n prepanng c ange o ers s ow In er aS $90 ra a numbere oaracrao s e nvinno:
1. Reason for change. 2. Description of change,
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail,
3. The contract cost will increase by $ 1,076.25
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$999,996.50
TOTAL APPROVED CHANGE ORDERS
$10,335.75
TOTAL PENDING CHANGE OR
($30,765.90)
TOTAL THIS CHANGE ORDER
$1,076.25
TOTAL % OF THIS CHANGE ORDER
0.11 %
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
$980,642.80
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
ACCEPTED BY:
ACCEPTED BY:
ACCEPTED BY:
ACCEPTED BY:
DATE: _ 7-II / 07
)ATE: W
I _tpY PATE: -
(Project Manager -Engineering) l
DATE: I' L 0 7
DATE:
)ATE:. Z'!S -07
APPROVED BY: I U If = DATE:
(Purchasing Agent over $30,000)
CC: Contractor
Purchasing
Pro)ecl File
$356.75 Engineering
$350.75 Nalurel Resources
$050.75 Slormwaler
Engineering Department
281 North Collage Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580
c3morAconins Tel: (970) 221-6605 • Fax- (970) 221-6378
Change Order
Project: LPATH Berm Erosion Protection Measure
Contract I Sid No.: 5999
Contractor: 1-2 Contracting Company
CHANGE ORDER NO.:
DESCRIPTION:
1. Reason for Change.
2. Description of Change:
3
See Attached Field Memorandum 3
item
Item Description Unit Unit Prical
$
Adjust
Quantity
Adjust
Amount $
Current
Quantity
New
Quantity
23
1 Muck Removal from South Spill I HR 105.00
10.25
1,076.25
0
10.25
Total Adjustment
1,07695
3. Change in Contract Cost: $1,076.25