Change Order Form
Engineering Departmear
PROJECT TITLE: E. Prospect - LPATH Berm Erosion Protection Measure
PROJECT NUMBER: 30521700.6 (Bid No. 5998)
'CONTRACTOR: J2 Contractors (PO No. 6607396)
CHANGE ORDER NUMBER: 1
n preparing change OrdWs-sho-w-hin—ootTeff as separate numberednumbared paragraphs tne a owing:
1, Reason for change. 2. Description of change.
3. Change in contract cost, 4. Change in contract time.
1&2. See attached shoat for detail,
3. The contract cost will increase by $ 10,335.75
4, The contract time will increase by 3 working days,
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C,O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
$999,995.50
$0.00
$0.00
$10,336.76
1.03% - - -
1.03%
$1,010,332.25
DATE:.- 1.I-Z F.1O?
REVIEWED BY:
- v
DATE:
�z
(Engineer)
a
Z
ACCEPTED BY;
4! r
DATE:
(Project Manager- Engineering)
ACCEPTED BY:
DATE,
(Proj anage - al Resources)
ACCEPTED BY:
DATE:
qq
2�6fyz
(Project Manag - Stor water)
r
ACCEPTED BY:,
U lL j
DATE:
�'�J•Q%
(Department Head)
APPROVED BY:
„ DATE:
(Purchasing Agent over $30,000)
cc: Cariraclor
$3,445.25 Engineering
'
Purchn�,hxl
$3,445.25 Nawral Rewwoes
F'ro*l file
$3.445,25 Stormweter
FEB-05-2007 MON 04:00 PM CFO ENG. FAX NO. 9702216378 P. 05
Engineering Department
281 North Collage Avenue @ P.O. Box 580 *Fort Collins, CO 80522-0580
CitvoiftTtCnn+ng 'rel: (970) 221-6605 • Fax: (970) 221-6378
Change Order
Project: LPATH Berm Erosion Protection Measure
Contract / Bid No.: 5998
Contractor: J-2 Contracting Company
CHANGE ORDER NO.: 1
DESCRIPTION:
1. Reason for Change: Dewatering is needed because the water/ice elevation right now
is at 4889, and drainage layer for the of concrete revetment mat
is below that elevation. Without dewatering, the
drainage layer and the mat cannot be place correctly.
2. Description of Change, Add item 23 Construction Dewatering South Spill Location
Pay Unit - Lump Sum
Subjected to same requirement as Item 4 Construction Dewatering
(North Spill and River Riprop Location)
3. Change in Contract Cost: $10,336.75
4, Change in Contract Time: 3 working days