HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 29191JAM-25-2007 THU 05:14 PM CFC ENG. FAX NO. 9702218378 P. 01 9 Change Order Form ' m x Z City o4 Fort Collins 0 m^ �n4iaecriag bepartmcut -4 PROJECT TITLE: E. Prospect-Poudre River to Summilview PROJECT NUMBER: 30521700.E (Agreement dated W106) CONTRACTOR: Stantec Inc. v �+ y n C CHANGE ORDER NUMBER: 1 ,, m n prepanng nge o e $sow toorder a epara num re paregra s e ovang: ,r 1. Reason for;2. Description of change. M 3. Change in Contract cost. 4. Change in contract lime. V 142. See attached inVolce for datails 3, ' The contract cost will increase by $3,938.00 v 4. There will be no change In contract time. ORIGINAL CONTRACT COST $124,800.00 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $33938.00 TOTAL % OF THIS CHANGE ORDER 3.10% TOTAL C.O. % OF ORIGINAL CONTRACT 3.16% ADJUST90 CONTRACT COST $128,738.00 DATE: _ b�/^L„ ACCEPTED BY: - (Contracloes RepresentaIve) APPROVED BY: � DATE' (Project ngi ear) APPROVED BY: 1 r DATE: ( eject Manager- Engineering) APPROVED BY: bV4AJDATE: PDarartment Head) APPROVED BY: cc, Pu�el�arine Accounting ControckN Prcjsct Fllu DATE, (Purchasing Agent over $30,000) - 281 North College Avenue • P,O. Box 58D -Fort Collins, CO 80522-05$0 - (970) 221-S605 JAN-25-2007 THU 05:15 PN CFC ENG. FAX NO. 9702216378 P. 02 PROPOSAL TO PROVIDE WETLAND PLANTING MONITORING SERVICES AND CONDUCT THE FIRST ANNUAL CORPS OF ENGINEERS (COE) MONITORING WORK FOR THE CITY OF FORT COLLINS' PROSPECT ROAD PROJECT (COE FILE NO.200260613) December 5, 2006 Objectives: Provide on -site monitoring of wetland planting activities during the Spring of 2007 for the 1.026 acres of compensatory wetlands to be created under the Individual Permit issued for this project. Complete the first annual monitoring fieldwork and report required by the COE for Individual Permits. schedule: Planting monitoring: As requested by the planting contractor with sufficient prior notice. Annual monitoring: Fieldwork = by October 31, 2007; Report submittal = by December 31, 2007 Methodology: The Cedar Creek representative will visit the watland mitigation site during scheduled planting activities to track the progress of such activities. Observations will be made wRh respect to the number and species of shrubs, cuttings, and trees being planted; the conditions of the planting materials prior to planting; and the planting methods employed by the contractor. Where either planting difficulties or opportunities are observed, such will be made known to the planting supervisor and suggestions made as to how the difficulties can be turned into advantages or how opportunities can be capitalized upon. Due to liability issues, no suggestions, requests, or recommendations will be given directly to equipment operators or other field personnel. Should any significant deviations from mitigation/construction/planting plan requirements be observed, these will be made known to the City as soon as possible. Further, Cedar Creek will not be responsible for certifying constructed acreages or any other information requiring a professional survey. At the end of the 2007-growing season, Cedar Creek will complete qualitative and quantitative annual monitoring work on the 1.026-acre compensatory mitigation site as per COE monitoring guidelines. Data to be collected will include vegetation cover values and species dominance, soil moisture regime measurements, soil color characteristics, and willow/shrub/tree counts. A photographic log will be initiated to document evolving site conditions. The City will need to provide a project map depicting the boundaries of the mitigation area along with topographic features for inclusion with the annual monitoring report. Deliverables: One copy of the first annual monitoring report will be submitted to the City of Fort Collins and the COE by December 31, 2007. Proposed Costs (@ $701hour); Project initiation meeting = Planting monitoring = (Assume 2 field days) _ Annual monitoring fieldwork = Annual monitoring report preparation = Project management = Word processor rental = Miscellaneous $280 $1,120 560 1,120 280 120 100 Total w $3,580 Costing Assumptions: 1.) All monitoring activities will be confined to the 1.026 acres of compensatory wetlands to be created. 2.) No additional meetings, on- or off -site, will be required, 3.) All excavation, grading, resoiling, and seedbed preparation activities relating to the 1.026-acre compensatory mitigation area have been completed to specifications or have been reasonably modified to take advantage of site conditions. 1 tool JAN-25-2007 THU 06:15 PM CFC ENG, FAX NO, 9702216378 P. Q3 a.) Weather or ground surface conditions will not interfere with the completion of fieldwork. Proposal accepted and work authorized on behalf of the City of Fort Collins by; Name Date Please return to: Stephen G. Long; 613 Hinsdale Dr.; Fort Collins, Colorado 80626.