Loading...
HomeMy WebLinkAboutBID - 6006 STEWART CASE PARK IMPROVEMENTS (42)City of Fort Collins Section 02220 - Demolition Park Planning & Development Division Page 1 of 1 DIVISION 2 SECTION 02220 - DEMOLITION PART 1 - GENERAL 1.01 Description of Work A. Demolition or salvage and removal of boulders (if found) for re-use in landscape; and remove fencing, other plant material, and debris or other items on the site necessary for the construction of the project. 1.02 Quality Assurance A. Standards listed hereunder and referenced elsewhere in these specifications shall become a part of this specification and are incorporated herein by reference. The latest edition, amendment or supplements thereto in effect thirty (30) days before date of invitation shall apply. 1. City of Fort Collins, Street Cut and Excavation Repair Standards 2. City of Fort Collins, Stormwater Drainage Design and Construction Standards PART 2 - MATERIALS - Not Used PART 3 - EXECUTION 3.01 Inspection and Reviews A. Schedule site meeting with Owner’s Representative to verify and mark limits of demolition. 3.02 Protection A. Refer to the General Requirements for site protection and temporary controls. B. Erect barriers and warning signs as necessary to prevent injury to the public and construction personnel. C. Protect features and areas not marked for demolition. Limit use of site to the delineated areas. D. Use of explosives is prohibited. 3.03 Demolition and Removal A. Items listed for salvage remain the property of the City. Items listed for demolition become the property of the Contractor. B. Remove from site items shown on demolition plan. C. Arrange for and pay costs associated with off-site disposal. 3.04 Hidden Conditions A. A hidden condition is any feature that could not be discovered or reasonably inferred from a careful inspection of the site prior to demolition. B. Promptly report hidden conditions to the Owner’s Representative. C. Hidden conditions may cause damage to features that are to remain in a finished work if demolition operations continue. Stop demolition operations affected by hidden conditions until a determination is made by the Engineer. D. Hidden conditions may cause a change in contract time or price; refer to the General Conditions. END OF SECTION