HomeMy WebLinkAboutBID - 6006 STEWART CASE PARK IMPROVEMENTS (2)9/12/01 Section 00510 Page 1
SECTION 00510
NOTICE OF AWARD
Date: December 20, 2006
TO: G. L. Hoff Company
PROJECT: 6006 Stewart Case Park –Site Improvements
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated November 22, 2006 for the above
project has been considered. You are the apparent successful Bidder and have
been awarded an Agreement for 6006 Stewart Case Park-Site Improvements.
Bid Item 7) Concrete Flatwork
Change flat work to 5” thick, 3500 psi concrete mix w/ no fiber
reinforcing.
Original cost $44,016.5, New Cost $39,939.5
Bid Item 8) Concrete 6” Exposed Aggregate
Remove integral color from the mix design.
Original cost $15,170, New Cost $13,764.0
Bid Item 9) Concrete Basketball Court
Remove steel reinforcing and replace with Fiber-mesh. Concrete mix design
= 3500 psi and change subgrade preparation to 6” inch recondition and 4” of
import road base.
Original cost $24,091.2, New cost $21,420.0
Bid Item 16) Prefabricated Picnic Shelter
Option #4) Litchfield “Pittsburg” all steel shelter. 16’ hexagonal with
Duo-Top and 24 gauge standing seam roof. Shelter is lump sum and work item
includes foundations, erection and Colorado Engineered Drawings. Deleted
are the 20’ footprint, overhead lattice, cupola, and handrails.
Original cost $40,450.00, New Cost $22,384.00
Bid Item 30) Irrigated Fescue Sod
Use bid alternate #1 Fescue Seed in lieu of Sod
Original Cost $5,679.00 New cost $ $2,650.20
Bid Item 32) Granite Stepping Path Boulders
Delete bid item. $19,808.00
Original Bid $251,264.20
Cost savings through value engineering -$49,057.00
Contract Cost $202,207.20
The Price of your Agreement is Two Hundred Two Thousand Two Hundred Seven
Dollars and Twenty Cents ($202,207.20.
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be
delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15)
days of the date of this Notice of Award, that is by January 4, 2007.
1. You must deliver to the OWNER three (3) fully executed counterparts of
the Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security
(Bonds) as specified in the Instructions to Bidders, General Conditions
(Article 5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to
declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return
to you one (1) fully-signed counterpart of the Agreement with the Contract
Documents attached.
City of Fort Collins
OWNER
By:________________________________________
James B. O’Neill, II, CPPO, FNIGP
Director of Purchasing & Risk Management
9/12/01 Section 00520 Page 1
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the 20th day of December in the year of 2006
and shall be effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
G. L. Hoff Company (hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may be
the whole or only a part is defined as the construction of the 6006 Stewart
Case Park-Site Improvements and is generally described in Section 01100.
ARTICLE 2. ENGINEER
The Project has been designed by City of Fort Collins Park Planning Division,
who is hereinafter called ENGINEER and who will assume all duties and
responsibilities and will have the rights and authority assigned to ENGINEER
in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete on April 13, 2006 as
provided in the General Conditions and completed and ready for Final Payment
and Acceptance in accordance with the General Conditions on May 11, 2006.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving
in a legal proceeding the actual loss suffered by OWNER if the Work is not
completed on time. Accordingly, instead of requiring any such proof, OWNER
and CONTRACTOR agree that as liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion:
Three Hundred Dollars ($300) for each calendar day or fraction
thereof that expires after the April 13, 2006 the date for
Substantial Completion of the Work until the Work is Substantially
Complete.
9/12/01 Section 00520 Page 2
2) Final Acceptance:
After Substantial Completion, One Hundred Fifty Dollars ($150) for
each calendar day or fraction thereof that expires after May 11,
2006 the date for Final Payment and Acceptance until the Work is
ready for Final Payment and Acceptance.
ARTICLE 4. CONTRACT PRICE
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows: Two
Hundred Two Thousand Two Hundred Seven Dollars and Twenty Cents ($202,207.20,
in accordance with Section 00300, attached and incorporated herein by this
reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will be
processed by ENGINEER as provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER, once each month during construction as provided
below. All progress payments will be on the basis of the progress of the Work
measured by the schedule of values established in paragraph 2.6 of the General
Conditions and in the case of Unit Price Work based on the number of units
completed, and in accordance with the General Requirements concerning Unit
Price Work.
5.1.1. Prior to Substantial Completion, progress payments will be in the
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
General Conditions. 90% of the value of Work completed until the Work has
been 50% completed as determined by ENGINEER, when the retainage equals 5% of
the Contract Price, and if the character and progress of the Work have been
satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 90% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided in
paragraph 14.2 of the General Conditions) may be included in the application
for payment.
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient to increase total payments to CONTRACTOR to 95% of the Contract
Price, less such amounts as ENGINEER shall determine or OWNER may withhold in
9/12/01 Section 00520 Page 3
accordance with paragraph 14.7 of the General Conditions or as provided by
law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of
the Contract Documents, Work, site, locality, and with all local conditions
and Laws and Regulations that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and
tests of subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of the
General Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or
to supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as CONTRACTOR
considers necessary for the performance or furnishing of the Work at the
Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents, including specifically the
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information
or data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provision of
paragraph 4.3. of the General Conditions.
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
9/12/01 Section 00520 Page 4
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts,
errors or discrepancies that he has discovered in the Contract Documents and
the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General Conditions,
Supplementary Conditions, those items included in the definition of “Contract
Documents” in Article 1.10 of the General Conditions, and such other items as
are referenced in this Article 7, all of which are incorporated herein by this
reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are not
limited to, the following:
7.2.1 Certificate of Substantial Completion
7.2.2 Certificate of Final Acceptance
7.2.3 Lien Waiver Releases
7.2.4 Consent of Surety
7.2.5 Application for Exemption Certificate
7.2.6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as
follows:
COVER SHEET -
DEMOLITION PLAN D-1
GRADING PLAN – CORE AREA G-1
SITE PLAN – LAYOUT S-1
SITE PLAN – LAYOUT S-2
SITE PLAN – LAYOUT S-3
SEATING AREA PLAN SA-1
SHELTER LAYOUT SH-1
BASKETBALL COURT LAYOUT BB-1
LANDSCAPE PLAN LA-1
BOULDER LAYOUT B-1
BOULDER DETAILS BD-1
SITE DETAILS SD-1
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
7.4. Addenda Numbers 1 to 2, inclusive.
7.5. The Contract Documents also include all written amendments and
other documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
9/12/01 Section 00520 Page 5
7.6. There are no Contract Documents other than those listed or
incorporated by reference in this Article 7. The Contract Documents may only
be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of
the General Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General
Conditions.
8.2. No assignment by a party hereto of any rights under or interests in
the Contract Documents will be binding on another party hereto without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due may
not be assigned without such consent (except to the extent that the effect of
this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge that assignor from any duty or responsibility under the Contract
Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
9/12/01 Section 00520 Page 6
OWNER: CITY OF FORT COLLINS CONTRACTOR:G. L. Hoff Company
By: ____________________________ By:_______________________________
JAMES B. O’NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING __________________________________
AND RISK MANAGEMENT
Title:____________________________
Date:___________________________ Date:_____________________________
(CORPORATE SEAL)
Attest: ________________________ Attest:___________________________
City Clerk
Address for giving notices: Address for giving notices:
P. O. Box 580 __________________________________
Fort Collins, CO 80522 __________________________________
LICENSE NO.:______________________
Approved as to Form
_______________________________
Assistant City Attorney
7/96 Section 00530 Page 1
SECTION 00530
NOTICE TO PROCEED
Description of Work: 6006 Stewart Case Park-Site Improvements
To: G. L. Hoff Company
This notice is to advise you:
That the contract covering the above described Work has been fully executed by
the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been
received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from
receipt of this notice as required by the Agreement.
Dated this day of , 20__.
The dates for Substantial Completion and Final Acceptance shall be ,
and , 20__, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this
day of , 20__.
CONTRACTOR: G. L. Hoff Company
By:
Title:
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
7/96 Section 00610 Page 1
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City
of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal
Corporation) hereinafter referred to as the "OWNER", in the penal sum of
in lawful money of the United States,
for the payment of which sum well and truly to be made, we bind ourselves,
successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the 20th day of December, 2006,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project, 6006 Stewart Case Park-Site Improvements.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its
duties, all the undertakings, covenants, terms, conditions and agreements of
said Agreement during the original term thereof, and any extensions thereof
which may be granted by the OWNER, with or without Notice to the Surety and
during the life of the guaranty period, and if the Principal shall satisfy all
claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the OWNER all outlay
and expense which the OWNER may incur in making good any default then this
obligation shall be void; otherwise to remain in full force and effect.
7/96 Section 00610 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of ,
20__.
IN PRESENCE OF: Principal
______________________________ ________________________________________
______________________________ ________________________________________
(Title)
________________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
IN PRESENCE OF: Surety
_____________________________ By:_____________________________________
_____________________________ By:_____________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00615 Page 1
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the
City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as "the OWNER", in the penal
sum of in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind
ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the 20th day of December, 2006,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project, 6006 Stewart Case Park-Site Improvements.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor
in the prosecution of the Work provided for in such Agreement and any
authorized extension or modification thereof, including all amounts due for
materials, lubricants, repairs on machinery, equipment and tools, consumed,
rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work
whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
7/96 Section 00615 Page 2
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of ,
20__.
IN PRESENCE OF: Principal
______________________________ By:___________________________________
______________________________ ______________________________________
(Title)
______________________________________
(Address)
(Corporate Seal)
IN PRESENCE OF: Other Partners
______________________________ ______________________________________
______________________________ ______________________________________
IN PRESENCE OF: Surety
______________________________ By:___________________________________
______________________________ By:___________________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00630 Page 1
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
7/96 Section 00635 Page 1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS
(OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 6006 Stewart Case Park-Site
Improvements
_____________________________
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
____________________________
____________________________ CONTRACTOR: ______________________________
____________________________
CONTRACT DATE:____________________________
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or
specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto.
This list may not be exhaustive, and the failure to include an item on it does
not alter the responsibility of the CONTRACTOR to complete all the Work in
accordance with the Contract Documents.
_________________________________ ________________________________________
ENGINEER AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time
indicated.
________________________________ By: ________________________________________
CONTRACTOR AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as
substantially complete and will assume full possession of the project or
specified area of the project at 12:01 a.m., on . The
responsibility for heat, utilities, security, and insurance under the Contract
Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By: ________________________________________
OWNER AUTHORIZED REPRESENTATIVE DATE
REMARKS:
7/96 Section 00640 Page 1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 20__
TO: G. L. Hoff Company
Gentlemen:
You are hereby notified that on the day of , 20__, the City of
Fort Collins, Colorado, has accepted the Work completed by
for the City of Fort Collins project, 6006 Stewart Case Park-Site
Improvements.
A check is attached hereto in the amount of $________________________ as Final
Payment for all Work done, subject to the terms of the Contract Documents
which are dated ________________.
In conformance with the Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following
date:___________________________.
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
7/96 Section 00650 Page 1
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: G. L. Hoff Company (CONTRACTOR)
PROJECT: 6006 Stewart Case Park-Site Improvements
1. The CONTRACTOR acknowledges having received payment, except retainage
from the OWNER for all work, labor, skill and material furnished,
delivered and performed by the CONTRACTOR for the OWNER or for anyone in
the construction, design, improvement, alteration, addition or repair of
the above described project.
2. In consideration of such payment and other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged,
the CONTRACTOR voluntarily waives all rights, claims and liens, including
but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270
a and b), stop notices, equitable liens and labor and material bond
rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land
improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished,
delivered or performed to or for the construction, design, improvement,
alteration, addition or repair of the project were furnished, delivered
or performed by the CONTRACTOR or its agents, employees, and servants, or
by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project
or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns
arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender,
if any, and the Surety on the project against and from any claim
hereinafter made by the CONTRACTOR'S Subcontractors, materialmen,
employees, servants, agents or assigns against the project or against the
7/96 Section 00650 Page 2
OWNER or its officers, employees, agents or assigns arising out of the
project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth
above constitutes and adequate description of the property and
improvements to which this Lien Waiver Release pertains. It is further
acknowledged that this Lien Waiver Release is for the benefit of and may
be relied upon by the OWNER, the lender, if any, and Surety on any labor
and material bonds for the project.
Signed this day of , 20__.
CONTRACTOR: G. L. Hoff Company
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of
20__, by
Witness my hand and official seal.
My Commission Expires: .
Notary Public
7/96 Section 00650 Page 3
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR: G. L. Hoff Company
PROJECT: 6006 Stewart Case Park-Site Improvements
CONTRACT DATE:
In accordance with the provisions of the Contract between the
OWNER and the CONTRACTOR as indicated above, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and
agrees that Final Payment to the CONTRACTOR shall not relieve the
Surety Company of any of its obligations to the OWNER, as set
forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand
this day of , ____ .
(Surety Company)
By
ATTACH: Power of Attorney and Certificate of Authority of