Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2903001/10/2007 WED 09:06 FAX 970 221 6586 CITY OF FT COLLINS CLRS 01-09-07 07:40 Fronn-UL/Thoupson Inc. 9702069441 i CHANGE ORDER NO: 01 PROJECT TITLE SNring Cetryon CammunlW Parts 7iz CTL TMVson L*Aem- m ORDER NO.: 904653 W t Addlgonal cons&ucdon Tbafto Tar charge: consbucfion bseng SWAM Q 001/003 T-412 P.602/002 F-597 of Change: construction taft serviaes no* In COMM CU& 541 IIM.07 go In oardrad Tine: 0 Days Mira, CONTRACT COW BMW APPROVED CHANGE ORDER PENDING CHANGE ORDER SoAo T THIS GHIWGE ORDER $47,986 % OF ORIGINAL CONTRACT. THIS r—O- 1 4 % OF ORIGINAL CONTRACT. ALL MI'S 70 !C ED CONTRACT cost tti u4ssmi g al a orders � WwVMP /�= - i waftr ay - Illy. ,g0nt oroer 150,e60 =9 cxm oem nrchIM &VIDeer pripAplis PurchavoW DATE DATE DAl`E 01/10/2007 WED 09:07 FAX 970 221 6586 CITY OF FT COLLINS CLRS Q 002/003 01-02-07 10.50 From-CTL/Thompson Inc. 9702069441 T-372 P-002/003 F-517 December 26, 2006 City of Fort Collins Park Planning and Development 215 North Mason Street P.O. Box 580 Fort Collins, Colorado 80522-0508 Attention: Ms. Kathleen Benedict Subject: Change Order for Construction Observation and Materials Testing Services Spring Canyon Community Park P.O.#6601653 Fort Collins, Colorado Proposal No. FC-06-0028; Project No. FC03715 City of Fort Collins: Ourfirm is providing construction observation and materials testing services for the Spring Canyon Community Park project (Project No, FC03715) located in Fort Collins, Colorado. We understand the fees associated with our observation and testing has exceeded the fee estimate we provided (Proposal No. FC 06-0028; dated February 13, 2006). We were requested to re-evaluate the amount of testing we estimate remains for this project as well as to summarize factors contributing to greater than anticipated fees for our services. We understand the City will utilize this budget status to generate a change order for the additional services. Information in our files indicates the following, which includes fees for services provided on or before December 16, 2006 (Up -To -Date Amount Invoiced). CTL Service Initial Estimated Fee Up -To -Date Amount Invoiced Difference Estimated Remaining Fees Submittal Review $726.90 $0.00 $726.90 $0.00 Earthwork $8.550.92 $23 840.82 $15,289.90 $4,083.36 Reinforcinq Steel 1027.98 $4,397.50 $3,369.52 $0.00 Concrete $7,996.36 $27,184.19 $19,188.84 i 453.70 Mason 632.28 $2.396.03 $236.23 $171.33 Structural Steel $1 199.31 $599.66 $599.65 $285.66 Post -Tensioned Slab $1,142.20 $0.00 $1,142.20 $0.00 Asphalt $1,401.78 $1.316.12 $934.62 Total` • 24,676.70 $59J34;32 $35 O'a7,V2 = $6 928*.48 We estimate a change order should be generated to include the $35,057.82 already exceeding the fee estimate as well as an additional $6,228-46 to comprise remaining 351 Linden Scree= I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 F2x:970-206.9"1 01/10/2007 WED 09:07 FAX 970 221 6586 CITY OF FT COLLINS CLRS 01-02-A7 lA:SA From-CTI./Thompson Inc. R 003/003 9702069441 T-972 P.002/ooe F-517 construction observation and materials testing services for a total of $41,986.07. We were requested to comment on the faotors contributing to fees exceeding the initial fee estimate. Our initial fee estimate assumed five proctors and associated classification testing would be necessary for this project. We performed proctor and associated classification testing for thirteen soil samples exceeding our estimate by eight due to a wide variety of soiic Imported and used as fill for this project We were also requested to observe and perform testing for stabilization of the creekslde area, under the berm located on the northwest portion of the site, the driveway area adjacent to the playground, as well as the culvert crossing south of the creelmide area. After the waterline and irrigation line was replaced, we retested the trench bacldill. These items were not considered during preparation of our fee estimate. We performed concrete testing at a higher frequency due to smaller than expected concrete placements, For example, we assumed testing for approximately every 50 to 75 cubic yards of concrete. We were frequently requested to test concrete for structures consisting of 6 to 20 cubic yards total which increased our number of tests. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTTL`I TTHOMPSON, INC. Eric D. Bernhardt, P.E. Manager of Field Services CM eF FORTOOLuNS 2 W WNG CANYON COMMURrTY PARK CR IT PROJECT NO. f 03718