Change Order Form
Cit7offcrxt cam
$odnevina 7lnn.ren..ne
PROJECT TITLE: Mason Street Transporation Corridor
PROJECT NUMBER: 30521900.6 (Bid #5932), Harmony Rd., Spring Creek Bike/Pedestrain Trail
CONTRACTOR: Mountain Constructors (PO #5506704)
CHANGE ORDER NUMBER: 11
1. Reason for change. 2. Description of change.
3. Change.in Contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will increase by ' $ 8,100.00
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
Representative
$1.392,915.11
$125,657.73
$0.00
$8,100.00
0.58�
9.60%
$1,526,672.84
DATE: I "of —d
SUBMITTED BY: YW- — _ DATE: —0 ��J 7
Project Engineer P
APPROVED BY: /\ ^ DATE: / J
4If __ Manager -Engineering
APPROVED BY:
;.
APPROVED BY:
cc; Purchasing
Accounting
Contrador
Project File
DATE: /
- Parks & Recreation
DATE:
(Purchasing Agdnt over $30,000)
S11,100.0D Parks & Rea
$0.00 Englneenng
Engineering Department - 281 North College Avenue - P.O. Sox 580 • Fort Collins, CO 905234580 • (970) =4605
JAN-09-2007 TUE 04:43 PM CFO ENG. FAX NO. 9702216378 P. 06
;> ''4•r '�u.i{�: e,w;l'r,•.i. l:.'N it'_!,'�'rl.:., .'...I'- 1 ii: � �'� 1 .,��riv. )li'Fr':1Y1 �: �' 1f ;it':'f�{7� I �, ,:,�1.,1,, �;It�;x''� , �. .•a', ,:�.,.;:'�•��,;;.;7:',;'`.r,,� A�QE ORQ��`s<�a �•�,tiv�, ! ���!..,.tv,�`:•�ii"i'�i.lt:r�.; �,3�%';r}��.,r,,,.,,.,r y
Project 5893 • Mason Street/Harmony RoadlSpring Creek BikelPedestrtan Trail
�a. • :.1,. C A V C .n llr
�:)" ��1%.�'...''.+ •'i;'l:''�,l y'.VU�MIpRiI 1�;. l•,,.�n"t-i^rr'l�'�:i'r it yill.�..l�•`.'��'��/i?j:Ij,1,`,4 'W t:'il: q').Y.�:
Seeding For ParkslNatural Areas
Additional Seeding Quantities placed by Geisman Seeding
in the Natural Areas land to the South of the Mason Trail,
These Items were Paid to Mountain Contractors as
overrun in Pay Application #10.
- See attached submittal -
212,00006
SEEDING NATIVE
AC
1 2.00
1 $ 690.00
1 $ 11380.00
212.00047
SOIL PREPARATION (SPECIAL).
AC
2.00
2 49000
$ A 980.00
213.00002
MULCHING EEO FREE. HAY
AC
2.00
$ Otis
$ 92100
213.00061
MULCH TACKIFIER
LB
1 300.00
1 $ 2,60
$ 840.00
TOTAL:
8,100.00
:d: •r.;..:,a`:i:;s:':�R .5ON;FOR•,GHAN E,.;;;',t,a,,. ,•'.,,.,-- :.;l;, ;;t;}„�;.,�,;;:ri<':�', :;.��,,;;,,,i,'r" .,:etS:,,;,e'r;:'ti1.L'""`z,:v.
The 2 Acres of Natural Area Seeding was Installed by
Geissman Seeding for Mountain Constructors. The area
needed to he seeded with an appropriate Natural Areas
seed mix that was provided by Jason Stunzman with Parks
Dept.
The price for the modification to the seed mix was an
additonal $200/acre.
Seed was drill seeded and then hydro -mulched at the
same unit price as Weed Free Hay Mulching.
l �a,� L-ra:•I+s I. I:I�;�•:.11°,'1; �lP>i,i..rA > Mir" . ;, ��t 4.j1 N
i r 'Y):" trt• TEO � ! I, �..: ". r.�l, ., pii,r•vr:j'fd t;,x.r :�C.r .la :in 11du
Posted to Pay Estimate # 10