HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 28937r CHANGE ORDER NO. #27 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: add underdrain at basketball & column alignment 1. Reason for change: place column at grid line 3 with HSS8x6 lintel beam, add underdrain and cleanouts to protect basketball courts from surface and subsurface water. 6 weather days in October (count 3 to contract per specs) 2. Description of Change: place column at grid line 3 with HSS8x6 lintel beam, add 4101f of underdrain, 3 single cleanouts, 3/4" rock to within 6" of surface, eci feeon rock and tracer wire. - 3 weather days 3. Change in Contract Cost: $15,650.79 4. Change in Contract Time: 3 TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all chanq ,P ACCEPTED BY: Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: orders 0.23% 12,043,421.24 DATE: / . 4 06 DATE:,/,�/ -fY >e t"p DATE: DATE: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing Initiation Date: 12114/2 vb CHANGE IN WORK REQUEST "66 Revised" Project: Spring Canyon Community Park Owner: City of Fort Collins Parks & Recreation To: Ted Johnson, ECI Requested by: Russell Lee, BHA Authorized by: Kathleen Benedict, City Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount As requested onsite- Add additional drainline around basketball courts. Per CTL recommendations add crushed rock aggregate to 6" below finish grade to intercept water. 420 LF of 8" underdrain (ED_ $28.35 per LF Add on Add 11,907.00 1,015.89 1,200.00 $60.00 $100.80 TOTAL $14,283.69 Ted Johnson, ECI , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be Unchanged by Days. No change in Contract Sum (Initial if no change) ADD to the Contract Sum $ 14,283.69 DEDUCT from the Contract Sum $ This information shall be valid for thirty (30) calendar days from the date of signature below. CONTRACTOR'S SIGNATUiii APPROVED BY OWNER: 12/14/2006 Accepted change in work request will be included in a future formal change order. DO NOT bill for this change until a formal change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor. ' t f/" "Jul" Initiation Date: 12/1112006 CHANGE IN WORK REQUEST "47 Revised" Project: Spring Canyon Community Park Owner: City of Fort Collins Parks & Recreation To: ECI Site Construction Mgmt Requested by: Ted Johnson Authorized by: Kathleen Benedict Please fumish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount Reference RFI #52. Place column at grid line 3 per architect witth HSS8X6 lintel beam to support column. Reference RFI #52 sketches A & B. Work includes field modification to existing column that was onsite prior to RFI #52 being issued. Additional masonry grouting and reinforcement for lintel and structural masonry was also required. ECI 5% Fee 1,302.00 65.10 TOTAL $ 1,367.10 ECI Site Construction Mgmt , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be Unchanged I by 0 Days. No change in Contract Sum (initial if no change) ADD to the Contract Sum $ 1,367.10 DEDUCT from the Contract Sum $ This information shall be valid for thirty {30) lendar days from the date of signature below. �. CONTRACTOR'S SIGNATURE DATE: 12/11/2006 Co ! o ORIGINAL to ner Z!N Ir DATE: APPROVED BY OWNER: !'Lo Accepted change in work request 4ill be included in a future formal change order. DO NOT bill for this c ange until a formal change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid unless signed by the owner and the contractor.