HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 28964R5643500A
Shipped From ENVIRONMENTAL CONCERNS INC
2526 E HIGHWAY 402
P O BOX 2135
LOVELAND CO 80537-8904
Ordered 01/08/07 Freight
Requested 01/08/07 Order Taken By
Delivery
Line Description / Supplier Item
1 lot
Deduct to PO #6602274 per
Change Order #28
Spring Canyon Community Park
REQUISITION 01/08/07
CITY OF FORT COLLINS Page - 1
Order Number 28964 - 000 - OR
Branch/Plant 2217
Ship To CLRS ADMINISTRATION
CITY OF FORT COLLINS
215 N MASON, 3RD FLOOR
FORT COLLINS CO 80524-4408
UOM Unit Price Extended Price Business Account Number Buyer
Unit Number
1 Ls .0000 44,674.30- 305 30547900.546310.6 4
Totals
44,674.30-
01/08/2007 MON 14:47 FAX 970 221 6586 CITY OF FT COLLINS CLRS
R 001/003
CHANGE ORDER NO. #28
PROJECT TITLE: SPRING CANYON COMMUNITY PARK
CONTRACTOR: ECI
PROJECT NUMBER: 5962
PURCHASE ORDER NO_: 6002274
DESCRIPTION: value engineer credit for pump system, heavy timber lintels
1. Reason for change: credit for redesign of pump system and costs to have heavy timber lintels in place of
cultured stone over doorways on restrooms
2. Description of Change: redesign pump to have 2 verticle turbine main pumps, 1
submerssible pressure pump, reuse esiting wetwell and 460v power
supply, includes removal of pump house roof. Installation of 400
amp service in piece of 600 amp service, add heavy timber in lieu
of cultured stone above restroom doorways
3. Change in Contract Cost: ($44,674.30) O
4. Change in Contract Time: 0 ``
,JV
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT. THIS C.O.
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
ADJUSTED CONTRACT COST
Assumina all chana,
ACCEPTED BY:
Contractor's Rea
ACCEPTED BY:
Project Manager
REVIEWED BY:
This:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
eel. Ciry Clerk Architect
Contractor Engineer
Project File Purchasing
-0.29%
11,991746.94
DATE: (. 4 -D&
DATE: _�
DATE:
DATE:
DATE:
01/08/2007 RON 14:48 PAX 970 221 6586 CITY OF FT COLLINS CLRS
Q 002/003
CHANCE IN WORK REQUEST "61"
Initiation Date: 12/13/2006
Project•. Spring Canyon Community Park
Owner: City of Fort Collins Parks & Recreation
To: Ted Johnson, ECI
Requested by: Russell Lee, BHA
Authorized by: Kathleen Benedict, City
Please fiunish change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date.
Description of Proposed Changes - amount
As requested and in accordance with the revised pump station plans PS4 dated 9/26106,
specifications 16140 and posted as CWR 56 on the shareware. Delete original pumpstation and
replace with new 2 pump system. Includes electrical modifications requested by ESC.
1). Provide and install in existing wetwell SynchroFlo Model 820-32L-110-1400 Variable Frequency
Drive Pumping Station designed to produce 1400 GPM at 110 PSIG dischage. The pump station
shall consist of (2) vertical turbine main pumps and (1) submersible pressure maintenance pump
The pumps shall extend 14' into an existino 151 x72" weturall- 46QV_ 3 Phase Rn Hz nmunr si innly
base
($42,731.95)
($550.00)
($2,189.10)
T.B.D.
TOTAL ($45,551.05)
"Please note- no modifications will be made to the ax/sting hatch which wr71 have a 4' x4' opening
Ted Johnson. ECI , agrees to change the work described above for the change in price shows below. 1 have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or
Contract Time.
The Contract Time will be Unehau ed by Days.
No change in Contract Sum (initiai irno change)
ADD to the Contract Sum $ 45 551.M
DEDUCT from the Contract Sum S
This information shall be valid for thirty (30) calendar days from the date of signature below.
CONTRACTOR'S SIGNATURE -`� DATE: 12/13/2006
CavrmcCl�r/shaJt �rrrorn one (1) copy and rdawn ORIGImit to Owner
APPROVED BY O r i J WNER: �' r i ! �.,.,,.--' ; '` / - � DATE: f''%-7• ^
Accepted change in work reguast will be included in a fruure formal change order. DO NOT bill far this change until a formal
01/08/2007 MON 14:48 FAX 970 221 6586 CITY OF FT COLLINS CLRS
Z 003/003
CHANGE IN WORK REQUEST "71"
Initiation Date: 12/19/2006
Project: Spring Canyon Community Park -
Owner. City of Fort Collins Parks &,Recreation
To: ECI Site Construction Mgmt
Requested by: Ted Johnson
Authorized by: Kathleen Benedict
Please furnbh change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be mode to incorpomfe This change into the avork without affecting the contracr date.
Install Heavy Timber Lintels in lieu of cultured stone. Lintels to be constructed from 30x100 heavy timber.
These will be attached with 3f4` galvanlZed bolts to match the existing heavy timber conditions (2 on each
end and a series of 3 on the longer piece over the double door at the playground restroom). Division IV Inc.
will provide a credit for the material not Used in this location. GTC is waiving their fee on the CWR_ $ 835.00
ECI 5% Markup $ 41.75
SUBTOTAL $ 876.75
ECI Site Censtruttioo ,%lgmt , agrees to Change the work described above for the change in price shown below. I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor Indicates his agreement herewith, including any adjushnent in the Contract Sum or Contract
Time.
The Contract Tune will be Unchanged by 0 Days.
No change in Contract Sum (Initial if no change)
ADD to the Contract Sum $ 976.75
DEDUCT from the Contract Sum S
This information shall be valid for thirty (30) mTettfar days from the date of signature below.
CONTRACTOR'S SIGNA
to oirner
APPROVED BY OWNER:
DATE: 12/19=06
DATE: a • a- ew
Accepted change In work request will be Included in a fature formal change order. DO NOT bill far this change until a formal
change order has been executed by all pm -ties. Acceptance is direction to proceed with the work described herein. Not valid
unless signed by the owner and the contract: