Shipped From ENVIRONMENTAL CONCERNS INC
2526 E HIGHWAY 402
P OBOX 2135
LOVELAND CO 80537-8904
Ordered 01/08/07 Freight
Requested 01/08/07 Order Taken By
Delivery
Line
/ 1.000 1 Lot
Addendum to PO #6602274
per Change Order #29
l Spring Canyon Community Park
REQUISITION
CITY OF FORT COLLINS
Ship To CLRS ADMINISTRATION
CITY OF FORT COLLINS
215 N MASON, 3RD FLOOR
FORT COLLINS CO 80524-4408
Item Quantity UOM Unit Price Extended Price Business
Unit
LS .0000 4,311.55 401
Order Number
Branch/Plant
01/09/07
Page - 1
28984 - 000 - OR
2217
Account Number Buyer
Number
40144500.546310.6 4
Totals 4,311.55
01/08/2007 MON 16:20 PAX 970 221 6586 CITY OF FT COLLINS CLRS
Q 001/002
CHANGE ORDER NO.029
PROJECT TITLE:
SPRING CANYON COMMUNITY PARK
CONTRACTOR:
ECI
PROJECT NUMBER:
5952
PURCHASE ORDER NO.:
66022T4
DESCRIPTION:
cottonwood glen parking late accesslgrade improvements
1. Reason for change: redesign and update access into cottonwood glen parking lots to improve drainage
2_ Description of change: sawcut asphaR, remove asphalts, remove curb S gutter, new curb
head and new concrete pavement -77
,-ADk f \ -
3. Change in Contract Cost: $4,311,55
4. Change in Contract Time: 0
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
ADJUSTED CONTRACT COST
(Assuming all change orders
ACCEPTED BY: _
Contractor's Representative
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
CV. City Clerk Architect
Contractor Engineer
Project File Purchasing
12408, 68.49
DATE: ! - 4-9b
DATE: /A .1 J-d�re
DATE:
DATE:
DATE:
01/08/2007 MON 16:20 FA% 970 221 6586 CITY OF FT COLLINS CLRS IA002/002
i #e
CHANGE IN WORK REQUEST "63 Final revision"
Initiation Date: 12/18/2006
Project: Spring Canyon Community Park
Owner. City of Fort Collins Parks & Recroation
To: ECI Site Construction MgMt
Requested by, Ted Johnson
Authorized by: Kathleen Benedict
Please furnish change in contract stun for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be mods to incorporate this change into the wont without affecting the contract date.
Description of Proposed Changes.
Amount
As requested during a field visit with the City of Ft Collins, ECI and Connell Resources. The following
modifications are hereby proposed to fix a drainage problem and transition overflow parking at N. Entrance
1). 5awcut and remove asphalt at both entrances 58LF (M $1.7ftle
$
101.50
2). Remove asphalt (480SF + 336 SF) 91 SY Q $5.35/SY
$
486.86
3). Hauloff and dispose of concrete curb and gutter 22 LF a $4.50/LF
$
99.00
4). Re -stake/ calcl layout new concrete transitions and grades
$
630.00
5). Add IV of curb head at South Entrance C $13.701LF
$
248.60
6). Add new parking lot concrete paving at S, Entrance (Approx. 3(rxl&) @ $3.30/3F
$
1,584.00
7). Add 4' of curb head at North Entrance ® $13.70/LF
$
54.80
8). Add new parking lot concrete paving at N_ Entrance (Approx. 28'x12') @ $3.30/SF
$
1,108.80
SUBTOTAL -,-$
4.311.55
ECI Site Cumtracdon Mgmt , agrees to change the work described above for the change in price shown below. 1 have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract
Time.
The Contract Time will be Unchanged by 0 Days.
No change in Contract Sum (initial ifno mange)
ADD to the Contract Sum 3 4,311.55
DEDUCT from the Contract Sum $
This information shall be valid for thirty (30) cal4oar days from the date of signature below.
CONTRACTOR'S
APPROVED BY OWNER:
DATE: 12/18/2006
DATE:
Accepted change in work request will be included in a fitdrre forma! change order. DO NOT bill for thls change tint l a formal
change order has been crecttted by all parties Acceptance is direction ro proceed with the work described herein. Not valid