Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2898501/08/2007 MON 16:41 FAX 970 221 6586 CITY OF FT COLLINS CLRS Q 001/003 CHANGE ORDER NO. 930 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: Trees and staking 1. Reason for change: add trees back into contract from value engineering and revise evergreen staking per forestry 2. Description of Change, add 211 trees back into contract, revise evergreen staking to use 3 t-posts per tree 3. Change in Contract Cost: $68,714.69 4. Change in Contract Time: 0 TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.0_ TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assumino all chance orders ACCEPTED BY: lull Contractor's Representative / ACCEPTED BY: Project Manager REVIEWED BY: Title APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing 5.05% $12,06TA61.65 DATE: 1. 4-, * DATE: DATE: DATE: DATE: 01/08/2007 MON 16:42 FAX. 970 221 6586 CITY OF FT COLLINS CLRS 12/27/2086 13:02 97066136411 ECI Q 002/003 PAGE 02/03 CRAMS AY'WORK REQUEST " W initiation bate: 12/26/2006 Project: Spring Canyon Community Park Owner. City of Fort Collins Parks tk Recreation To: Ted Johnsoo, ECI Requested by: Russell Lee, BRA Au&miaed by: IGathlm Bonedict, City Please tarnish chengc in eantmct sum for the change in work dauribcd below. Do not order mat&M or staff auy work tmhl approval is reoeived. Every e, brt Will be made to incorporate this ckaW Into the work without trfecr<ng the mn&ad date. Des- ;.1on if Proposed Changes - amount As requested, add trees back to project. $ 17.110.00 S 15.400.00 S 7,id0.00 $21,000.00 $1,755.00 CWR #72 TOTAL S 62V409.00 Ted Johttwa. ECI , AFM to change dte work described above for the dmp in Bice shown below. I ave attached a breakdown which list$ all costs of labor, materials, taxes, overhead, prof+t, and all other changes and/or charges Involved. 5ignanun o fthe Coukraor indicates his ag'een mt herewldti including any adjustment in the Contract Sum or Contract Time. The Contract Time will be Uncheased by Days. No change 1n Contract sum (to iw 9rno del ADD to the Contract Stun 5 62140&00 DEDUCT $om tho Contract sum S This lafotmation ftU be valid for thirty (30) CONTRACTOR'S days th m dto date of signature below. DATE: 1226/2006 -, CoNmrceor 1 in (l�rop�,a gRlrrtNdL w / APPROVED BY OWNER DATE: - G Aceeptad chnge in work request w1U be i?a duded in a juNro formal change order. DO NOT brit for this change until a format charge order has been axecutdd by all parties. ,acceptance tr dheadon to proceed with the work described herein Ntlt valid unless signed by the onvnerr and the contractor. 01/08/2007 MON 16:42 FAX 970 221 6586 CITY OF FT COLLINS CLRS Q 003/003 12/27/2006 13:02 9706696411 iultiation Date: 12127/2006 ECI CHANCE IN WORK REQUEST e72" Project Spring Canyon Community park owner. City ofFort Collins Parks & Recreation, To: ECI Site Conslr4etion Mgmt Requested try: Ted Johnson Autho&Adby. Kathleen Ben�edlg PAGE 03103 CD 0 'r?v Place furnish engage in contract sum for the obatsge in work described below. Do net arder mt terkl or start agr *ork until approval is necaived. Every effort will be made to incorporate thb change Into the workwithout gfecA49the contract date, Description of Proposed Changes - 'amount In accordance with ASI #21 delete evergreen tree guying as shown on Sheet L20 detail 04 and change to L20 detail 02 using (3) & T-posts at each tree. The unit cost includes the additional labor and T-post material for t* substitution. 1). Change Evergreen staking on 348 evergreen trees In rantract award ® $14.411 tree $ 5,014.94 2). Change Evergreen shaking on 60 evergreen trees added In CWR #W @ $14AII tree $ 894.29 ECI 5% Markup $ 300.48 SUBTOTAL. $ GrM.69 ECI Site Commetre s Mont , agrees to change the work dascribed above for the change 9 !rice shown below. T have attached a breakdown which lists 41 cants of labor, materials, tames, overhead, profit, and all other charges and/or ehmlia involved. Sigtadae of the Contractor lndiaates his agreement harswith, including any adlwtmestt to the Contract San or Contract Time. 'tire Contract Time will be Unt natlaed by 0 Days. No change in Contract Sum anww if oo chms,) ADD to the Contract Stun S 6,399.69 DEDUCT from the Contract Suss $ This bbrmadou shall be valid for thhy (30) CONTRACTOR'S APPROVED BY OWNBli: from the date of sipature below. 0XIOmai to DATE: 12/27/2006 DATE: Acaepfed change in work request will be included In albiure formal change order. DO NOT 8r77 fvr flits change until a formal ohemgee order hat been eve cured by all parties. Acceptance la direction ro proceed with the work described herein. Not valid unless signed by the owner and the o0n1ra0tor.