HomeMy WebLinkAboutCHANGE ORDER - BID - 5931 MASON STREET HARMONY ROAD FOSSIL CREEK BIKEJAN-09-2007 TUE 04:43 PM CFO ENG, FAX N0, 9702216378 P, 09
Change Order Form
City of Fort Collins
Engfncerinq Department
PROJECT TITLE: Mason Street Transporation Corridor
PROJECT NUMBER: 30521900.6 (Bid #5931). Harmony Rd., Fossil Creek Bike/Pedestraln Trail
CONTRACTOR: Mountain Constructors (PO #5506703)
CHANGE ORDER NUMBER: 6
n prepanng change or ers s ow in order as separa a hum ere paragrap s tse o owing;
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.,r,�/t
1&2. See attached sheet for detail.
3. The contract cost does not change. $ �^
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$994,646.35
TOTAL APPROVED CHANGE ORDERS
$11,090.20
TOTAL PENDING CHANGE ORDERS
($10,590.20)
TOTAL THIS CHANGE ORDER
$0.00
TOTAL % OF THIS CHANGE ORDER
0,00%
TOTAL C.O. % OF ORIGINAL. CONTRACT
0.05%
ADJUSTED CONTRACT COST
$995,346,35
(Assuming all change orders approved)
ACCEPTED BY: ole,6` DATE: /
C ractor's Re0'resentative
SUBMITTED BY;
1 'I DATE:
Project Engint?er
APPROVED BY: / !� L/ DATE:—
P oleot Manager -Engineering
APPROVED BY:
cc: Purchasing
Accounting
Conlrector
Project File
DATE:
(Purchasing Agent over $30,000)
vent„na ;nn nenartnient • 281 North College Avenne • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-4605
JAN-09-2007 TUE 04:43 PM CFO ENG. FAX NO. 9702216378 P. 10
CHANGE ORDER - 6
Project 5931 - Mason Street/Harmony RoadiFossil Creek Bike/Pedestrian Trail
S M Y OF
Mountain Constructors
Modify Inlet Grade
- See attached submittal -
TOTAL 10.00
RE ON FOR CHANGE
An inlet elevation was set to design elevation but the trail
in this area was set higher than grade with the City's
approval. It was necessary to raise the existing inlet to
make the grading around the inlet safe.
Posted to Pay Estimate # 10