WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
Connell Resources
Dated:
Work Order Number.
Purchase Order Number:
Project Title: Golden Meadow Park - Wet well installation
Commencement Data: 12/15/2006
Completion Date: 12/12/2006
Maximum Fee: (time 6t reimbursable direct costs): R7g000.00
Project Description: Scope to include all work necessary to successfully install a 60" wet well
according to the drawings referenced in the attached quotation.
Scope of Services: See attached two (2) pages of scope for details. Terms and rates for the City's
current contract bid #5853 with Connell Resources to apply for this work.
Acceptance
Service Provider agrees to perform the services
identified above and on the attached foams in
accordance with the terms and conditions contained
herein and in the Services Agreement between the
parties. In the event of a conflict between or
ambiguity in the terns of the Services Agreement
and this work order (including the attached forms)
the Services Agreement shall control.
Service Prov'
B:
Rate: '2 2 tl
CC: Purchasing
The attached fortes consisting of two 2M page(s)
are hereby accepted and incorporated herein by
this reference, and Notice to Proceed is hereby
given.
p - [5- o(4
City of Fort Collins %`y/� /
By* t V �q' ` -" 11 g—
Date: V
Director of Purchasing and Risk Management
if over $30,000
12/13/2006 WED 16:15 FAX. 970 221 6586 CITY OF FT COLLINS CLRS
rit002/002
Connell Resources, Inc.
4305 East Harmony Rd
Fort Collins, CO 80528
Phone: (970) 223-3151
Fax: (970) 223-3191
QUOTATION
Date: 12/1/2005
Submitted Tor aty or Fort Collins Bid Title Golden Meadows Park Pump Station
Address: 256 Mountain Bid Number:
Fort Collins, CD Project Location: Golden Meadows Park
COntalc ]awn 5tubman Project Cty, state: Fort edlrn:s, c0
Phone: Fax: Engineer/Archltec#*
we order rer your corionco soon me rauowing Quotation windy li aeceplim snail constitute a contract between Us.
item # Itern Description Bstirttated Quantity Unit Unit Price Total Prim
10 Provide And Install Wet Well 60" 1.00 UNIT $8,200.00 $8,200.00
12 Intake Piping 10" C900 W/ Gate valve 100.00 LF $110.00 $11,000.00
14 Install Filter Flush Pipe 100.00 LF $30.00 $3,000.OD
16 Provide And Install intake Screen 1.00 EACH $3,300.00 $3,300.00
1e Dawatering For intake Pipe And Wet WdI 5.00 4Y $1,300.00 $615WAD
Total Price for above 1. Install Wet Well With Intake Items: $32,61511.10
Total Bid Price: 137,000 OO
News: • Pricing is based upon plans entitled "Kruse Bementary School POUdre school district Pump station detalle dated 3-2 -02, Sheets P-2, P-3,
A-1, A-2, as prepared by Aqua engineering and Architect studio.
. The following are errduded from this proposal: Construction layout and engineering; Drainage fatifrty Certification; Pertartnance and
Payment bands; Warrantcc period In vicess Of one year; Street deankrg for work performed by others; Permits: including but not limited to,
dty, building, development construction, construction dewaeering, wastewater discharge, storm water discharge (NPDES), air quality, etc.;
Fees, including but not limited to, for Oevelopemenf inspection, utility connection, meters, eac.; Dewatermg; Maintenance of erosion control
devices for others; quality control or acceptance testing; prairie dog rw*val, relocation, or eztermination; Irrigation repair, landscaping,
seeding, or revegetatlon.
Pricing Is based upon field Visit with Jason Sbrtiman.
Connell will need to verify the pump layout prior to Installation.
Connell WIN need bD have the future Irrigation line located to use the eas meat as an access to the site.
The pump building If estimated as a If x IT Inside dlmenslon precast building with agwsed aggregate and recessed into the berm an the
14 tt side with a single door and louvers on the North side and the 6draust fan On the East.
Intake pipe indudes a gate valve upstream of the pump building for maintenance of the wet well.
24" condults are Included through the floor of the building and sweeps under the slab for electric and controls.
Medaical work Is excluded,
. construction water is to be pumped from the pond. Dewatering water Is to be discharged to the pond so that no dewatedng water is
discharged from the site.
. Please provide a minimum of 2 weeks advanced notification of work requests to allow for scheduling the work. No work will be completed
without a signed Purchase order Agreement. Wok Is anticipated to begin in December 2006.
. Frost removal or winter protection is not included. If requested, it will be billed either an a time and materiel Was or a lump sum amount
that is mutually agreed apon.
. Connell has not included prices for replacing damaged or broken concrete but will replace broken areas at unit prices per the Fort Collins
Mhc Streets eonbact.