HomeMy WebLinkAbout194201 STUART C IRBY - PURCHASE ORDER - 6606113Date: 09122/06
City of Fort Collins
City of Fort Collins
Page Number: i
Purchase Order Number: 6606113
Delivery Date: 04/23/07 Buyer: DICK,OPAL
Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence.
Note:
Line Qty UOM Description Unit Price Extended Price
1 5 EA T3000076; transformer
750 Kva pad mount; 3phs
T3000076
YARD
TRANSFORMER, 750 kVA PAD -MOUNTED
COMPARTMENTAL TYPE, THREE PHASE
DISTRIBUTION WITH SEPARABLE INSULATED
LOAD BREAK HIGH VOLTAGE CONNECTORS.
HIGH VOLTAGE RATING: 13200 GRDY17620.
LOW VOLTAGE RATING: 480Y(277.
SERIAL NUMBER 076 TO BE IN ACCORDANCE
WITH SPECIFICATION #368-300-076, REVISION MM,
Bid #5996
MFR.COOPER
GUARANTEED NO LOAD LOSS - 1176
GUARANTEED FULL LOAD LOSS - 4198
GUARANTEED TOTAL LOAD LOSS - 5374
16,998.770 84,993.85
REV. SYM: MM
3.2.2.4 HIGH VOLTAGE TAPS
A no-load tap changer with external operating handle shall provide two 2 % full capacity taps above and
below normal. The operating handle shall be mounted in the primary compartment.
3.2.2.5 BUSHING WELLS AND TERMINALS
3.2.2.6.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as
shown in Fig. 1 and Fig. 5 of this specification. All low -voltage bushings and high -voltage wells
shall be externally clamped and shall have leads of sufficient length to allow them to be changed
without removing he cover. Welded bushings and wells are expressly prohibited.
3.2.2.5.2 High -voltage bushing wells shall be 200A load -break interface 8,3/14.4 kV bushings in accordance
with ANSMEEE Sid. 386.
3.2.2.5.3 Low voltage bushing arrangement and spacing shall be 'staggered", as shown in Fig. 5 of this
Specification.
3.2.2.5.4 The low -voltage neutral shall be a fully insulated bushing. A ground pad shall be provided on the
outer surface of the tank and a removable copper ground strap shall be provided and connected
between the low -voltage neutral bushing and the ground pad.
3.2.2.5.5 The high -voltage neutral shall be connected to the low -voltage neutral internally with provision for
opening this connection for testing.
3.2.2.6 ACCESSORY CABINET
3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally
constructed in accordance with applicable ANSI specifications and dimensioned in accordance with
Fig. 1 of this Specification.
3.2.2.6.2 Cabinet doors shall be hinged, removable, and lockable. Stainless hinge pins shall be provided.
3.2.2.7 ACCESSORY EQUIPMENT
Accessory equipment shall be provided in accordance with Table 1A and the following details:
3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical
clearance for a jack shall be 1'/2 inches minimum, 3Y2 inches maximum.
3.2.2.7.2 The transformer base shall be arranged for rolling in two directions:
Parallel to and at right angles to the centerline of the high -voltage bushings,
3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on
the tank to provide a suitable lift for the completely assembled unit.
3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad.
An internal flange shall be provided at the base of the accessory compartment to provide means for
mounting the unit on the pad. (Fig. 1).
3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be
shown on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in
the low -voltage compartment, and shall be readable with cables in place. Where the nameplate is
mounted on a removable part, the manufacturer's name and transformer serial number shall be
permanently affixed to a non -removable part.
Instruction nameplate shall contain the information specified in ANSI C57.12.00-2000, paragraph
5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that
the dielectric fluid is non -PCB.
8
368-300
REV. SYM: mm
3.2.2.7.6 An automatic pressure relief device shall be located within the compartment. This device shall
meet the following requirements:
• '/: NPT or larger male Inlet Port.
• Exposed parts of weather and corrosion resistant materials.
• Non -deteriorating gasket and o-ring material.
• Manual pull ring able to withstand 25 pound force minimum.
• Body able to withstand 100 pound force minimum.
• Bug shield.
• Cracking pressure of 10 t 2 psig.
• Resealing pressure of 6 psig minimum.
• Zero leak rate from resealing pressure to —8 psig.
• Minimum flow rate of 35 SUM at 15 psig.
3.2.2.8 OIL PRESERVATION
Transformers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior
of the tank from the atmosphere, and in which the gas plus the oil volume remains constant. The
transformer will remain effectively sealed for a top -oil temperature range of —32°C to 105°C.
3.2.2.9 TANKS
The tank shall be domed or sloped to shed water and shall be of sufficient strength to support a minimum
of 500 lbs. Construction of the tank shall be in accordance with ANSI C57.12.26-1992, Section 7, except
bolted cover is preferred.
3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed.
Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be
exposed; however, where cover bolts are exposed, the comer bolts shall be welded or otherwise
rendered tamperproof.
3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6A of ANSI C52.12.26-1992.
3.2.2.9.3 Locking bolts shall be pentahead style.
3.2.2.10 OVERCURRENT PROTECTION
Overcurrent protection shall consist of a single element current sensing bay-o-net fuse link in series with
an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2:
Table 2 — Fusina Reautrements
Exputifibn` Use Continuous
t;airsnt'Llmitlttg Fuse
Stock
kVfA
Cutroht Rating
Conan Cuwrent Rating
Number
C
Part Nu" iA
krt'Number"
368-300-008
75kVA
10A
30A
368-300-009
4000353C06
3544030M61M
368-300-015
150kVA
15A
40A
368-300-016
4000353C08
3544040M61M
368-300-030
300kVA
25A
65A
368-300-031
4000353C10
3544065M61 M
368-300-051
500kVA
40A
100A
4000353C12
3544100M71M
368-300-075
750kVA
66A
125A
368-300-076
750kVA
(4000353C14)
(3544125M71M)
368.300-100
1000kVA
368-300-101
1000kVA
368-300-151
MOM
140A
25OA : Parallel 125A fuses
368-300-201
2000kVA
4000353C17
3544125M71M
368-300-251
2500kVA
125A Hi -Amp OL Link C05C8
250A : Parallel 125A fuses
3544125M71M
Fuse shall be as specified in the table above or shall be an equivalent as approved in
writing by Electric Standards Engineering.
9
368-300
REV. SYM: MM
3.2.2.11 COMPONENTS FOR LOOPED PRIMARY
The minimum current -carrying capability of components for the looped primary cable system shall be 200
amperes (continuous) and 10,000 amperes symmetrical (momentary).
3.2.2.12 AUDIBLE SOUND LEVEL
The audible sound level shall be in accordance with NEMA Standard TR1.
3.2.2.13 BASE PLAN
The base plan of a completely assembled unit shall be such that it can be installed on a pad of the
dimensions shown in Fig. 6 of this specification.
3.2.2.14 PAINT
3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface
free of dirt, dust, chalk, loose paint, rust, grease and any other contaminants.
3.2.2.14.2 EEI "Finishing Guidelines* specification shall apply. Finish coat shall be Desert Tan, Munseli
#10YR6.0/3.0, glossy.
3.2.2.15 SAFETY LABELS
The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning
labels after delivery.
3.2.2.16 ANGULAR DISPLACEMENT:
Per Fig. 10(b) of ANSI C57.12.26-1992.
10
368-300
I BELOW Q
JH
I I 4.5 MIN
+ _
5 X1 3rt
27.0
4.5 .a. 6. 6.b 4.
II
36A MIN•
FLANGE 3/P MIN
11n•MAK
KVA RATINGS
LOW VOLTAGE
RATINGS
COMPARTMENT
DIMENSIONS
(MINIMUM)
BUSHING
HEIGHT
A'
B
75-150
ALL
23.25
27
225-500
ALL
28
31
4aGYJ277.208Y/120
28
46
;7504000
00
480Y/227
28
48
NOTE'.
Denotes inside dimension!.
•• See Fig.5
AN dimensions in (Inches).
Maximum denensions shall allow one Inch tleeranco from edge of pad (Fig. 6).
Figure 1 - Accessory compartment & Bushing Dimensions (Config. 1)
REV. SYM: MM
11
368-300
>ntN—
_CL
TANK SURFACE
i
r
TANK SURF ACE
I �
i i I
I ! I J
A.75
f19
_A
INSIDE
Cable Ameecwry Parking Stand
Figure 1A — Cable Accessory Parking Stand Detail
Figure 2 (Config. 2) - DELETED 7/92
Figures 3 & 4 - DELETED 11/00
Ref. now to: ANSI C57.12.26 - 1992 figures 9(a)
& 9(b)
REV. SYM: mm
12
368-300
A A A 4.0"
MIN MIN
CL
X1 , _f X3
B
CL
rr Tr �
XO X2
REV. SYM: MM
6" RADIUS
TYPICAL 3
PLACES
KVA RATINGS
LOW VOLTAGE
A
B
RATINGS
75-150
ALL
4.75
8
225-500
ALL
6
8
750-2500
480/2770 208Y/120
6
10
Figure 5 - Staggered Low - Voltage Bushing Arrangement
(all dimensions minimum inches).
NOTE:
An area having a 6 inch radius around each bushing
shall remain clear of obstructions such as gauges, etc.
13
368-300
REV. SYM: MM
KVA
SERIAL
PAD
DIMENSIONS (inches)
A
8
C
D
E
F
75
-006 thru -009
75
55
40
21
15
61
150
-015
75
55
40
21
15
61
150
-016
75
55
40
21
15
61
300
-030
75
55
40
21
15
61
300
-031
75
55
40
21
15
61
500
-050
75
55
40
21
15
61
500
-051
75
55
40
21
15
61
750
-076, -075
85
72
49
23
15
67
1000
-101,-100
85
72
49
23
15
67
1500
-151
101
87
51
23
15
76
2000
-201
107
88
51
23
15
79
2500
-251
107
88
51
23
15
79
Fig. 6 - Pad Dimensions
14
368-300
REV. SYM: mm
TABLE 1A
ACCESSORY EQUIPMENT
ACCESSORY
KVA
75-150
300
500-2800
Tap changer handle in HV compartment
X
X
X
Instruction nameplate in LV compartment
X
X
X
Jacking provisions
X
X
X
Provisions for rolling in two directions
X
X
X
Lifting lugs
X
X
X
Provisions for mounting on pad
X
X
X
Arrester mounting provisions
Grounding provisions in both compartments
X
X
X
V oil drain plug
X
V oil drain valve with sampling device
X
X
Upper filer press and filling plug (or cap) (1")
X
X
X
Provisions for oil gauge
X
Provisions for pressure -vacuum gauge
X
X
Oil gauge
X
Thermometer
X
X
X
Secondary CT mounting holes
(4 holes on 4 31W x 5 5J8" centers)
X
X
X
Manuallautomatic pressure relief valve
X
X
X
15
366-300
REV. SYM: MM
3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units
3.3.1 FUNCTIONAL DESCRIPTION
The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfronY type for use on a
13.8 kV grounded "Y" distribution system.
3.3.2 DESIGN AND CONSTRUCTION
The requirements for radial -feed transformers shall be the same as those of loop -feed with the following
exceptions:
3.3.2.1 RATINGS
Table 3 - Radial -Feed Transformer Ratinas
Stock No.
WA
LOW
Volta
Impedance
13.. hin
T /CQnfl .
High Volta a
Low Voltage
368-300- 006
75
208Y/120
1.9%
0
06
368-300- 007
75
480Y/277
1.9%
0
m6
® Per Figures 5A, & 7 of ANSI C57.12.26-1992 (In -Line) EXCEPTION: high voltage bushings shall be 32 - 36 inches
above the base of the transformer
O Figures 9(a) & 9(d) of ANSI C57.12.26 -1992 (stud with 4-hole pad)
6 Figure 8(9) of ANSI C57.12.26-1992 (Staggered)
3.3.2.2 ACCESSORY CABINET
The accessory cabinet shall be dimensioned in accordance with Fig. 7 of ANSI C57.12.26-1992.
4. QUALITY ASSURANCE
4.1 GENERAL
4.1.1 RESPONSIBILITY FOR INSPECTION
Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial
laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the
inspections set forth in this Specification where such inspections are deemed necessary.
4.1.2 TEST REPORT
The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment.
Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are not acceptable
even if accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test
report.
4.2 TEST CONDITIONS
Unless otherwise specified, testing defined in Section 4.6 shall be conducted under the following conditions:
4.2.1 REFERENCE TEMPERATURE
The reference temperature to which losses, impedance, regulation, and efficiency are corrected shall be 85°
C.
4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE
Tolerance shall be as specified in ANSI C57.12.00.
16
368-300
REV. SYM: MM
4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP
The percent departure of tested impedance voltage on any tap from tested impedance voltage at rated
voltage shall not be greater than the total tap voltage range expressed as a percentage of the rated voltage.
4.3 FUNCTIONAL TESTS
Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be
performed on each unit, except Temperature and Noise Tests which shall be performed on one unit of each
design (KVA) per order.
Table 4 - Functional Tests
TEST
TEST PARAGRAPH
REQUIREMENT OR REFERENCE
Examination Of Product
4.6
3.0 3.1 3.2 3.3(This specification)
Ratio
4.6
ANSI C57.12.00 Section 8
Polarity And Phase Relation
4.6
ANSI C57.12.00 Section 8
Excitation Loss
4.6
ANSI C57.12.00 Section 8
Excitation Current
4.6
ANSI C67.12.00 Section 8
Impedance & Load Loss
4.6
ANSI C57.12.00 Section 8
Temperature Tests'
4.6
ANSI C57.12.00 Section 8
Dielectric Tests
4.6.1
3.2.2.2 is specification)
Impulse Tests
4.6.2
3.2.2.2(This specification)
Leak Testing
4.6.3
3.2.2.8 & 3.2.2.9(This specification)
Noise Testing*
1 4.6.4
1 3.2.2.12(This specification)
*One unit per design per order.
4.4 TEST METHODS — FUNCTIONAL TESTS
Each completed unit shall be inspected to determine compliance with respect to dimensions, material,
workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of
ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test
requirements and/or modifications shall apply.
4.4.1 DIELECTRIC TESTS
Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and
C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute.
The test potential between high voltage windings shall be 34,000 volts for one minute.
4.4.2 IMPULSE TESTS
ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond
wave.
4.4.3 LEAK TESTING
The transformer tank shall be filled with oil and tested for air and oil leaks under (1) 4 psig vacuum for % hour,
(2) 7 psig pressure for 24 hours in the sequence indicated. An alternate method of leak testing may be
performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector.
(Note, the automatic/manual pressure relief device must be removed for this test).
4.4.4 NOISE TESTING
Noise testing shall be conducted in accordance with applicable NEMA Standards.
5. PREPARATION FOR DELIVERY
Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units
shall be packaged in such a way as to provide for ease of handling and to protect units from shipping damage. Units shall be
fully pelletized in four-way universal pallets with 28" minimum openings to facilitate handling from any side. Pallets shall be
independent of the transformer. The Supplier shall give 24-hour notice prior to delivery for any shipments where an individual
transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with any additional
requirements or modifications shown on the purchase order and/or supplemental instructions.
17
368-300
Date: 09/22106
City of Fort Collins
City of Fort Collins
Page Number: 2
Purchase Order Number: 6606113
Delivery Date: 04123107 Buyer: DICK,OPAL
Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence.
Note:
Line Qty UOM
Description
""'IMPEDANCE MUST TEST ABOVE 5.32`... `
DELIVERY: 30 WEEKS ARO
City of Fort III s Director of Purchasing and Risk Management
This order Is valid over $2000 unless signed by James B. O'Neill II, CPPO, FNIGP
Unit Price Extended Price
Total $84,993.85
City of Fort Collins
Accounting Department
PO Box 580
Fort Collins, CO 80522-0580
City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580
REV. SYM: MM
6. DEFINITIONS AND ABBREVIATIONS
• Vendor or Supplier - The manufacturer and/or manufacturers agent supplying or quoting on the specified article.
• Article, Unit, Assembly - All refers to the equipment defined by this specification.
• DC or d.c. - Direct Current.
• AC or a.c. -Alternating Current.
• °C - Degree Celsius (Centigrade)
• T - Degree Fahrenheit
• W -1000 volts.
• CPS or Hz - Cycles per second.
• psig - Pounds per square inch gauge.
• V or v - Volts.
• WA -1000 Volt-amperes.
18
368-300
REV. SYM: m
APPENDIX A
Typical pad designs are shown in Figures 1A through 3A.
The dimensions in inches of Figures 1A through 3A will fit the minimum compartments on transformers covered by this
Specification as well as the maximum transformer envelope.
19
368-300
REV.SYM: MM
85'
55'
T3'
15' I PRIMARY SEC.
6' FRONT I•
—(�'-I
I t-- 26' 27' -- 13' 19
FOUR 113 REBAR
LENGTH AND WIDTH
10�y 40' 3r r
7 5/8' —• .TL3.
T I
Notes on Pad Material —
1. Concrete must be 3,000 psi minimum.
2. Maximum coarse aggregate size 1 1/2 inches.
Space requirements for pad and primary switching cabinet will generally
be 9' X 12'. Factors to be considered in locating the pad include —
1. Accessibility — The transformer pad shall be accessible to
line boom trucks equipped for the installation and removal of
heavy transformers. Such accessibility shall not require
intrusion on adjacent property.
2. Proximity of Buildings, Walls, Barriers, and/or Overhangs —
In addition to the clearances required for installation and
removal, the minimum clearance in front of the transformer pad
shall be eight (8) feet and the minimum clearance from all
other sides shall be three (3) feet. It the building has on
overhang, clearance to the edge of the transformer pad shall
be measures horizontally from the outer edge of the overhang.
Transformers through 300 KVA may he installed under the
overhang if the vertical clearance between the pad and the
overhang is at least 25 feet and the location is accessible to
line boom trucks.
3. Codes and Standards — In addition to the above, the
installation shall conform to the Notional Electric Code and
federol, state and city codes and standards.
2 8 25/93
REV NO. DATE DWN D.E. APP I DSNG. ENG APP DIST. APP
® CITY OF FORT COLLINS DWG 3PHaSE1
A
LIGHT AND POWER DEPARTMENT
TRANSFORMER PAD DESIGN
75 — 500 KVA
1°"' •"° �"""" 3 PHASE
Figure 1A - Pad Design (75 - 500 KVA)
20
368-300
REV. SYM: mm
BY
72'
15' I PRIMARY SECONDARY -I}I-- IT
�• FRONT— I �3•
18' 26' 23' 1s-
F➢UR B3 REBAR
49' 3'-� 3'
LENGTH AND WIDTH
7 5/9 • — — 3'
T
Notes on Pad Material -
1. Concrete must be 3,000 psi minimum.
2. Maximum coarse aggregate size 1 112 inches.
Space requirements for pad and primary switching cabinet will generally
be 9' X 12'. Factors to be considered in locating the pad Include -
1. Accessibility - The transformer pad shall be accessible to
line boom trucks equipped for the installation and removal of
heavy transformers. Such accessibility shot not require
intrusion on adjacent property.
2. Proximity of buildings, Walls, barriers, and/or Overhangs -
In addition to the clearances required for installation and
removal, the minimum oearance in front of the transformer pod
shall be eight (8) feet and the minimum clearance from all
other sides sholl be four (4) feet. If the building has an
overhang, clearance to the edge of the transformer pad shall
be measured horizontally from the outer edge of the overhang.
Transformers through 300 KVA may be installed under the
overhang if the vertical clearance between the pad and the
overhang is of least 25 feet and the location is accessible to
line boom trucks.
3. Codes and Standards - In addition to the above, the
installation shall conform to the National Electric Code and
federal, state and city codes and standards.
1 02 90 1
REV NO. DATE DWN I D.E. APP I DSNG. ENG APP DIST. APP
CITY Or FART COLLINSWG 3PHASE2
LIGHT AND POWER DEPARTMENT
4a TRANSFORMER PAD DESIGN
500 - 1000 KVA
'J1111414T 'wwl lwc " 3 PHASE
Figure 2A - Pad Design (500 - 1000 KVA)
21
368-300
REV. SYM: MM
107'
1
T-"
--1-4-� I- �•
L 3'
PRIMARY
15' f WINDOW SECDNDARY
A—
a• — FRONT — I•
T
L
} 2W---- 23'--- 2B• _-..� 28•- l
3•
-FIVE Its REBAR
3 51• 3• LENGTH AND
WIDTH
— — —
t T
Notes on Pad Material -
1. Concrete must be 3,000 psi minimum.
2. Maximum coarse aggregate size 1 1/2 inches.
Space requirements for pad and primary switching cabinet will generally
be 9' X 12'. Factors to be considered in locating the pad include -
1. Accessibility - The transformer pad shall be accessible to
line boom trucks equipped for the installation and removal of
heavy transformers. Such accessibility shall not require
mtrusion on adjacent property.
2. Proximity of Buildings, Walls, Barriers, and/or Overhangs -
In addition to the clearances required for installation and
removal, the minimum clearance in front of the transformer pad
shall be eight (5) feet and the minimum clearance from ell
other side shall be four (4) feet. If the building has an
overhang, clearance to the edge of the transformer pad shall
be measured horizontally from the outer edge of the overhang.
Transformers through 300 KVA may be installed under the
overhang if the vertical clearance between the pad and the
overhang is at least 25 feet and the location is accessible to
line boom trucks.
3. Codes and Standards - In addition to the above, the
installation shall conform to the National Electric Code and
federal, state and city codes and standards.
"'02'90
REV N0.
DATE
DWN
D.E. APP
DSNG. ENG APP
DIST. APP
CITY OF FORTCOLLINS
DWG 3PHASE3
Q
PARTMENT
LIGHT AND POWER DEPARTMENT
TRANSFORMER PAD DESIGN
".r swe.. aauer
1000 - 2500 KVA
Lent ",ml
3 PHASE
Figure 3A - Pad Design (1000-2500 KVA)
22
368-300
REV. SYM: mm
APPENDIX B
Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may
submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted
manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturers equipment must
also satisfy all requirements of this Specification to be acceptable.
TABLE 3B
MANUFACTURER SERIAL NO.
Cooper Power Systems All
ASEA Brown-Bovari (ABB) All
Howard Industries All
Pauwels Transformers All
The manufacturers in the following list have been condidonalfy approved and may bid as an alternate. The definition and
intent of "Conditional Approval' of a manufacturer is to allow the City, to gain some experience with the manufacturer's product.
Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or
none of the order to them, dependant upon the current needs of the City for that item or items.
23
368-300
REV. SYM: MM
APPENDIX C
The following forms for Individual and Average Transforrer Losses are used by the City of Fort Collins to determine loss
penalties.
1) Transformer Loss Evaluation Average Losses Form
2) Individual Transformer Loss Evaluation Form
24
368-300
TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES
City Order No. S/N
Manufacturer Invoice No.
KVA/Unit
LINE
DESCRIPTION
(1)
No. of units
(2)
Average core losses
(3)
Quoted core losses
(4)
Excess average core losses:
line (2) less line (3)
(5)
Penalty for excess average core losses:
line (1) x line (4) x $
(6)
Average copper losses
(7)
Quoted copper losses
(8)
Excess average copper losses:
line (6) less line (7)
(9)
Penalty for excess average copper losses:
line (1) x line (8) x $
(10)
Penalty to be assessed manufacturer.
line (5) plus line (9) but not less
than zero
Date
Prepared By:
Design Engineering
AMOUNT
REV. SYM: mm
NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these
averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable
to Light and Power.
368-300
INDIVIDUAL TRANSFORMER LOSS EVALUATION
City Order No
Manufacturer
KVA/Unit
LINE
DESCRIPTION
(1)
Tested core losses
(2)
Quoted core losses
(3)
Excess core losses
(4)
(5)
(6)
(7)
(8)
S/N
Invoice No.
line (1) less line (2) but not less
than zero
Percent difference
Line (3)=line (2) x 100
Tested total losses
Quoted total losses
Excess total losses
Line (6) less line (6) but not less
than zero.
Percent difference
Line (7) _ line (6) x 100
Tested copper losses
Quoted copper losses
Excess copper losses
Line (9) less line (10) but not less
than zero.
Penalty for excess core losses
Line (3) x $
Penalty for excess copper losses
Line (11) x $
Penalty to be assessed manufacturer
Line (12) plus line (13)
Prepared By:
Design Engineering
AMOUNT
REV. SYM: MIXI
26
368-300
Revised 12/13/96
Special Conditions and Supplemental Instructions to Bidders
Applicable to Specification 368-300
A. Data to be supplied with Bidder's Proposal
The following data shall be supplied with the bidder's proposal in addition to that information required by
the "Invitation to Bid" and the "Purchase Requisition".
I . Impedance volts in percent (%) at full load, high voltage to low voltage at 85°C
2. No load and total losses at 85°C
3. Delivery in weeks
4. A statement indicating compliance with our Specification with exception or a detailed listof exceptions.
5. Escalation IS / IS NOT applicable for the transformers bid. If escalation applies, the Bidder
shall indicate in his bid, the specific items or materials subject to escalation and shall provide the method
and indices to be used in computing the amount thereof. Escalation occurring after acceptance, if Purchaser
exercises the option to delay shipment after manufacturing is completed, will not be paid.
If the above information and compliance statement are not supplied the proposal will not be evaluated
An alternate bid for the total order may be submitted in addition to the unit bids.
B. Loss Evaluations
Loss penalties and loss evaluations will be based on the following values:
1. No-load or excitation losses at $3.90/watt
2. Load losses at $2.30/watt
C. Shipping Terms
Ship F.O.B. point of destination, freight prepaid.
D. Terms of Payment
1. If escalation applies, the City of Fort Collins shall not be billed for escalation occurring after the promised
delivery date.
2. Test reports shall accompany the invoice. If test reports do no accompany the invoice, late payment penalty
charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports
shall be sent to the Standards Engineering Section, Fort Collins Utilities - Light & Power.
3. Loss penalty credits and escalation charges shall be itemized on the invoice.
THE CITY OF FORT COLLINS
Light and Power Department
P.O. Box 580
Fort Collins, CO 80522
SPECIFICATION NO: 38 -300
TITLE: PAD -MOUNTED COMPARTMENTAL-TYPE.THREE-PHASE
DISTRIBUTION TRANSFORMERS
WITH SEPARABLE
INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS
r
APPROVED BY:
Kraig Bader
Standards Engineering Division Manager
ORIGINATION DATE: 8/12/83
REVISED: 21212006
REV. SYM: MM
ITEMS COVERED BY THIS SPECIFICATION
DESCRIPTION
STOCK
NO.
SPECIFICATION NO.
SERIAL
75 KVA 208Y/120 RADIAL
368-300
-006
75 KVA, 408Y/277 RADIAL
368-300
-007
75 KVA 208Y/120 LOOP
368-300
-008
75 KVA, 480Y/277 LOOP
368-300
-009
150 KVA, 208Y/120 LOOP
368-300
-015
150 KVA, 480Y/277 LOOP
368-300
-016
300 KVA, 208Y/120 LOOP
368-300
-030
300 KVA 480YI277 LOOP
368-300
-031
500 KVA 208Y/120 LOOP
368-300
-050
500 KVA 480Y/277 LOOP
368-300
-051
750 KVA, 20BY/120 LOOP
368-300
-075
750 KVA, 480Y/277 LOOP
368-300
-076
1000 KVA, 208Y/120 LOOP
368-300
-100
1000 KVA, 480Y/277 LOOP
368-300
-101
1500 KVA, 480Y/277 LOOP
368-300
-151
2000 KVA, 48DY1277 LOOP
368-300
-201
2500 KVA, 480Y/277 LOOP
368-300
-251
2
368-300
REV. SYM: MM
REVISION DESCRIPTIONS
REVISION DESCRIPTION Previous on file
APPROVED
REVISION FF:
Tim Sagan
• Add Paragraph 5.2.2.9.3: pentahead locking bolts
Susan Coram
• Paragraph 3.2.2.13.1: add glossy requirement.
10-18-95
REVISION GG:
Susan Coram
• Title page: Remove revised date
Tim Sagan
• Paragraph 4.4 and Table 2A: Change Temperature Tests and Noise Test from every
9-22-95
unit to one unit of design.
REVISION HH:
Opal Dick
• GE removed from Appendix B
Tim Sagan
12-13-98
REVISION II:
• Add paragraph 3.2.2.10 OVERCURRENT PROTECTION and renumber remaining
paragraphs in section 3.2
Opal Dick
• Revise Fig. 1 to reflect a "V" configuration for the primary bushing arrangement vs. an
Tim Sagan
in -line arrangement.
6/3199
• Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions
A from 5" and 5.5" to 6" on 225-2500 WA sizes
REVISION JJ
Bill Bray
• Reformat and converted to MS Word, delete List of Active Pages
Tim Sagan
911412D00
REVISION KK
Kraig Bader
• Added drawing la to describe cable accessory parking stand detail, revise to reflect
Tim Sagan
current editions of national standards, change impedance on 368-300-009 from
911112001
1.7% to 1.9%.
REVISION LL
Kraig Bader
• Change fusing from oil -immersed current sensing weak link cartridge to a current
4/2/2004
sensing bay-o-net fuse link in series with an ELSP current llmiting backup
fuse (clause 3.2.2.10).
• Change column header for impedance table in 3.2.2.1 to clarify that impedance
numbers are nominal values. (Tolerances are consistent with ANSI C.57.12.00-
2000)
• Changed wording from "Mr. Ouch" in 3.2.2.15 to "warning label'
Revision MM
Kraig Bader
• Change clause 3.2.2.10 to specify current sensing bay-o-net fuse link by size and
2/2/2005
part number. Table 2 was added for this purpose.
• Renamed table in 3.3.2.1 to from Table 2 to Table 3
• Renamed table in 4.3. from Table 2A to Table 4
3
368-300
REV. SYM: MM
TABLE OF CONTENTS
ITEMS COVERED BY THIS SPECIFICATION ............. »................... .................... ............... ............. ........ ...»... ............. ...... ...........2
REVISIONDESCRIPTIONS.................................................................................................................»..............................................3
1. SCOPE..................................................................................................................................................................................................5
2. APPLICABLE DOCUMENTS...........................................................................................................................................................5
3. REQUIREMENTS.............................................................................................................................................................................»5
3.1 GENERAL REQUIREMENTS FOR DESIGN................................................................................................................................5
3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS........................................................................................7
3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS.................................................................................16
4. QUALITY ASSURANCE.................................................................................................................................................................16
4.1 GENERAL.....................................................................................................................................................................................16
4.2 TEST CONDITIONS....................................................................................................................................................................16
4.3 FUNCTIONAL TESTS..................................................................................................................................................................17
4.4 TEST METHODS -- FUNCTIONAL TESTS................................................................................................................................17
5. PREPARATION FOR DELIVERY.................................................................................................................................................17
6. DEFINITIONS AND ABBREVIATIONS....................................................................................................................................18
APPENDIXA.........................................................................................................................................................................................19
APPENDIXB.........................................................................................................................................................................................23
APPENDIXC.........................................................................................................................................................................................24
TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES.................................................................................................25
INDIVIDUAL TRANSFORMER LOSS EVALUATION ........-....................................................................................................26
4
368-300
SPECIFICATION FOR
PAD -MOUNTED COMPARTMENTAL -TYPE, THREE-PHASE
DISTRIBUTION TRANSFORMERS WITH
SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS
1. SCOPE
REV. SYM: tit
This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ,
mineral oil immersed, self -cooled, pad -mounted, compartmental -type distribution transformers rated 2500 kVA and
smaller, high voltage 13,200 Grd Wl7620 volts, with separable insulated load break high voltage connectors. These
transformers are used for step down purposes from an underground primary cable supply.
This standard generally conforms to ANSI requirements for pad -mounted compartmental -type, self -cooled, three-phase,
distribution transformers for use with separable insulated high -voltage connectors, C57.12.26.
2. APPLICABLE DOCUMENTS
The following documents form a part of this Specification to the extent specified herein. The latest issue in effect on the
date of invitation for bids shall form a part of this Specification, unless otherwise noted.
• ANSI C57.12.00 - Distribution, power, and regulating transformers, and shunt reactors, general requirements for
• ANSI C57.12.26 - Pad mounted, compartmental -type, self-cwled three phase, distribution transformers for use with
separable insulated high voltage connectors, high voltage 34,500 Grd Y119,920 volts and below,
2500 kVA and smaller, requirements for
• ANSI C57.12.70 - Terminal markings and connections for distribution and power transformers
• ANSI C57.12.80 - Terminology for power and distribution transformers
• ANSI C57.12.90 - Distribution, power, and regulating transfomrers, and shunt reactors, test code for
• ANSUIEEE 386 - Separable insulated connectors for power distribution systems above 600V
• NEMA STANDARD TR7 - Transformers, regulators and reactors
3. REQUIREMENTS
3.1 GENERAL REQUIREMENTS FOR DESIGN
3.1.1 BASIC DESIGN STANDARDS
Transformers purchased under these Specifications shall be new and, unless otherwise specified, meet the
requirements of the applicable ANSI Standards and the modifications and additions given in the subsequent
paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shown:
a) This Specification.
b) ANSI C57.12.26
c) Other applicable ANSI and NEMA Standards.
3.1.2 KILOVOLT AMPERE TEMPERATURE RATINGS
Kilovolt -ampere ratings are continuous and are based on not exceeding either a 65°C average winding
temperature or an 800C hot spot temperature rise. The temperature rise of the insulating oil shall not exceed
65°C when measured near the top of the tank. The temperature rise is based on an altitude of 3,300 feet.
3.1.3 GENERAL CONSTRUCTION
3.1.3.1 The pad -mounted compartmental -type transformers shall consist of the transformer tank, high -voltage
cable terminating compartment, and the low -voltage cable -terminating compartment. All three of these
components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a
pad. There shall be no exposed screws, bolts or other fastening devices, which are externally
removable, except the main cover bolts may be exposed. Where the main cover bolts are exposed, the
5
368-300
REV. SYM: mm
comer bolts shall be welded or otherwise rendered tamperproof. There shall be no opening through
which foreign objects such as sticks, rods, or wires might be inserted to contact live parts. Suitable
means for padlocking the compartment door(s) shall be provided.
3.1.3.2 The high and low -voltage compartment shall be located side by side on one side of the transformer tank.
When facing the compartment, the low -voltage compartment shall be on the right.
3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting
pad without disturbing the entrance cables.
3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that
are in contact with the pad to minimize corrosion.
3.1.3.5 Minimum dimensions shall be as shown in Fig. 1 of this Specification. Maximum transformer and
minimum pad dimensions are shown in Fig. 6 of this Specification.
3.1.4 LOSSES
The total losses of a transformer shall be the sum of the excitation losses and the load losses (I2R losses).
Load loss tests shall be performed and reported on all units regardless of whether or not a record of such
tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the
°Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation
losses and I2R losses at the specified rates. If tested losses exceed quoted losses but are within the
tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses
will be calculated using the following equation and the above specified rates and will be deducted from the
original Purchase Order or back charged to the manufacturer. In Table 18 and the following equation "Units"
shah mean "Transformers of the same size and design on one order."
Excess loss $ _ [No. of units] [(No Load Loss Evaluation $) (Avg. No Load Losses — Quoted No Load Losses)
+ (Load Loss Evaluation $) (Avg. Load Losses — Quoted Load Losses)]. If this equation results in a negative
number no credit will be given the Supplier.
If any unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall not
be shipped without express permission from the City. If accepted, the deduction for excess losses will be
based on the following equation: Excess loss $ _ (No Load Loss Evaluation $) (No Load Losses — Quoted No
Load Losses) But Not Less Than Zero + (Load Loss Evaluation $) (Load Losses — Quoted Losses) But Not
Less Than Zero,
3.1.5 SERVICE CONDITIONS
Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature
range shall be 400C above to 320C below zero. The transformer shall operate safely with starting
temperatures as low as 32"C below zero.
6
368-300
REV. SYM: MIN
3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units
3.2.1 FUNCTIONAL DESCRIPTION
The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfronf type for use on a
13.8 kV grounded "Y" distribution system.
3.2.2 DESIGN AND CONSTRUCTION
3.2.2.1 RATINGS
Table 1 - Lonn-Feed Tranafnrmer Ratinas
Stock No.
WA
Low
Voltage
Nominal
Impedance
101humshina7 e/Con .
Hil h Volta a
Low Voice e
368-300- 008
75
208YI120
1.9%
0
(M)
368-300- 009
75
480YI277
1.7%
0
®(O
368-300- 015
150
1 208Y/120
2.1%
O
®®
368-300- 016
150
480Y/277
2.1%
0
®m
368-300- 030
300
208Y/120
2.5%
0
0T
368-300- 031
300
480Y/277
2.5%
0
®®
368-300- 050
500
208Y/120
3.04%
0
®®
368-300- 061
500
480Y/277
3.04%
i0
®0
368-300- 075
750
208Y1120
5.75%
0
m
368-300- 076
750
480Y/277
5.75%
r0
368-300- 100
1000
208Y/120
5.75%
0
368-300- 101
1000
480Y/277
5,75%
OO
368-300- 161
1500
480Y/277
5.75%
O►
0
368-300- 201
2000
480Y/277
5.75%
0
0
368-300- 251
2500
480Y/277
5.75%
O
OFigure 1 (V-config.) of this specification
0 Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.26-1992, Fig. 9(d)
and shall include a separate spade with NEMA standard drilling
4@Figure 9(a) of ANSI C57.12.26 - 1992 (4-hole pad)
®Figure 9(b) of ANSI C57.12.26 -1992 (6-hole pad)
3.2.2.2 INSULATION LEVEL
3.2.2.2.1 The basic impulse level (BIL) of the completely assembled transformer, including high -voltage and
low -voltage terminals shall be 95 kV and 30 kV respectively.
3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Paragraph 5.10 of ANSI
C75.12.00-2000
3.2.2.2.3 The unit shall withstand test voltages in accordance with ANSI C57.12.00 and impulse tests in
accordance with NEMA Standards for Transformers, Publications No. TR1.
3.2.2.3 TRANSFORMER CORE
A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of
three-legged designs is expressly prohibited.
7
.368-300