CHANGE ORDER NO.023
PROJECT TITLE: SPRING CANYON COMMUNITY PARK
CONTRACTOR: ECI
PROJECT NUMBER: 6952
PURCHASE ORDER NO.. $602274
DESCRIPTION: irrigation credit bid sit #6, add plumbing to water table, stabilize basketball
1. Reason for change: reduced mainline end lateral from bid sit 0 redesign, add 1/2" copper line and ball valve
shutoff to playground water table, 200 ton roadbase to stabilize subgrade of basketball
courts.
2. Description of Change. reduced mainline and lateral from bid sit #5 redesign, add 1/2"
copper line and ball valve shutoff to playground water table, 200
ton roadbase to stabilize subgrade of basketball courts.
3. Change in Contract Cost: ($1,122.63) 0-' 6 L
4. Change in Contract Time: 0
TOTAL APPROVED CHANGE ORDER $12,611.55
TOTAL PENDING CHANGE ORDER $0.00
TOTAL THIS CHANGE ORDER _ ($1,122.63)
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. -0.01%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 0.10%
ADJUSTED CONTRACT COST 1,626,337.10
(Assuming all change orders approved)
ACCEPTED
Contractor's
ACCEPTED
Project Mana
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
rc: City Clerk Architect
Cantraclar Engineer
Proleat File Purchasing
DATE: /Z- [ '0 co
DATE: d—&
DATE:
DATE:
DATE: