Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 28283 5971 2006 PEDESTRIAN ACCESSNOV-30-2006 THU 01:37 PM CFO ENG. FAX NO, 9702216378 Change Order Form &nal[e_rin[ D[nsrlment — — — PROJECT TITLE: 2006 Pedestrian Access - Pedestrian Bridgos PROJECT NUMBER: 30521451.6 (Bid #5971) CONTRACTOR: G.L, Hoff (PO #6602850) CHANGE ORDER NUMBER: 2 1. Reason for change. 2. Description of change, 3. Change in contract cost, 4. Change in contract time, 1 &2. See attached sheet for detail, 3. The cbritract cost will increase by $ 673,68 4. There will be no change in contract time, P. 01102 � a ORIGINAL CONTRACT COST $141,689.60 TOTAL. APPROVED CHANGE ORDERS $20,541.60 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $673.68 TOTAL. % OF THIS CHANGE ORDER 0.48% TOTAL C.O. % OF ORIGINAL CONTRACT 14.98% ADJUSTED CONTRACT COST $162,804.78 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ACCEPTED 4 ACCEPTED BY; ACCEPTED BY: APPROVED BY: cc: Contractor Purchasing Project File /71 110 DATE: /�;��f� - 046 _ (Contractor's R re Ive) (Project Mager - Pedestrian Access) (Project Manager - Pedestrain Planning) %(Department Head) (Purchasing Agent over $30,000) $614.2B Pod Access ($140M) Pad Plan DATE: DATE: �► DATE: DATE: DATE: c Engineering Department • 281 North College Avenue • P.O, Box 590, Port Collins, CO 80522-0580 • (970) 221-6605 NOV-30-2006 THU 01:37 PM CFC ENG, FAX N0, 9702216378 P, 02/02 Change Order No.: 2 Date: 1112812008 Pedestrian Bridges C L Hoff Company Bid No. 5971 i, Reason For change: a. A handrail was added to the West Lapone Bridge. b. Labor and Flowf II was not used In the Laporte bridge abulments previously added by change order. c. Labor and Flowfill was not used In the Mulberry brldge abutments previously added by change order. 2. Description Of Change: a. Adds a lump surd price for a handrall Installed at the West Laporte Bridge. b. Deducts a lump sum price for Labor and Flowfill not used in the Laporte bridge abutments. c. Daducls A lump Burn price for Labor and Flowfill not used in the Mulberry bridge abutments. 3. Change In Contract Amount: Unit Quantity Unit Cost Total Cost a. Handrail Lump Sum Price LS 1 $ 1,025.18 $ 1,025,18 $ 1,025.18 Unit quantity Unit Cost Total Cost b, t)oduct Lump Sum Price lot Laporte abutments. LS 1 $ (210.00) $ (210.90) c. Ooducl Lump Sum Price for Mulberry abutments. LS 1 $ (140.60) $ (140.80) 3 (351.50) TOTAL CHANGE IN CONTRACT AMOUNT $ 673.58 4. Change In Contract Time a. One day are added to the contract. TOTAL CHANGE IN CONTRACT TIME 1 Day H,\p,m.p\PED\Pod Acccss\Pad Access 2004\Ped 6ridgesWonthly Pay Estimate 1 of 1 Change Order Form Endneerina Denartment - PROJECT TITLE: 2006 Pedestrian Access - Pedestrian Bridges PROJECT NUMBER: 30521451.6 (Bid #5971) CONTRACTOR: G.L. Hoff (PO #6602850) CHANGE ORDER NUMBER: 2 n preparing change orders Show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 673.68 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: 0.48% 14.98% DATE: DATE: ACCEPTED Bk�y DATE: (Project M ager -Pedestrian Access) $141,589.50 $20,541.60 $0.00 $673.68 $162,804.78 ACCEPTED BY: �e �(.ndlc ei-,- !� „.R DATE: y-b Cp It' (Project Manager - Pedestrain Planning) ACCEPTED BY: ( ' / (Department Head) APPROVED BY: �J (Purchasing Agent over $30,000) cc: Contractor Purchasing Project File $814.28 Ped Access ($140.60) Ped Plan DATE: I! -&a • oG DATE: Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 . (970) 221-6605 Change Order No.: 2 Date: 11 /28/2006 Pedestrian Bridges G L Hoff Company Bid No. 5971 1. Reason For Change: a. A handrail was added to the West Laporte Bridge. b. Labor and Flowfill was not used in the Laporte bridge abutments previously added by change order. c. Labor and Flowfill was not used in the Mulberry bridge abutments previously added by change order. 2. Description Of Change: a. Adds a lump sum price for a handrail installed at the West Laporte Bridge. b. Deducts a lump sum price for Labor and Flowfill not used in the Laporte bridge abutments. c. Deducts a lump sum price for Labor and Flowfill not used in the Mulberry bridge abutments. 3. Change In Contract Amount: Unit Quantity Unit Cost Total Cost a. Handrail Lump Sum Price LS 1 $ 1,025.18 $ 1,025.18 $ 1,025.18 Unit Quantity Unit Cost Total Cost b. Deduct Lump Sum Price for Laporte abutments. LS 1 $ (210.90) $ (210.90) c. Deduct Lump Sum Price for Mulberry abutments. LS 1 $ (140.60) $ (140.60) $ (351.50) TOTAL CHANGE IN CONTRACT AMOUNT $ 673.68 4. Change In Contract Time a. One day are added to the contract. TOTAL CHANGE IN CONTRACT TIME 1 Day H:\p.m.p1PED\Ped Access\Ped Access 2004\Ped Bridges\Monthly Pay Estimate 1 of 1