HomeMy WebLinkAbout353311 CHEVO STUDIOS - CONTRACT - RFP - P981 ART IN PUBLIC PLACES POLICECONSTRUCTION AGREEMENT
THIS AGREEMENT is made and entered into this - 14 day of , 2006, by and
P
between THE CITY OF FORT COLLINS, COLORADO, a municipal co oration (hereinafter referred
to as "the City"), and Chevo Studios, Inc., a Colorado corporation (hereinafter referred to as "Artist.")
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between
the parties hereto as follows:
1. Scope of the Work. The Artist shall furnish all of the materials and perform all of the
work shown on the drawings and described in the specifications for the Police Facility Project attached
hereto as Exhibit "A" and incorporated herein by this reference (the "Project"), and consisting in general
terms of the design, construction, signage and installation of multiple elements at the site, including
Museum Wall, Officer Wall, Badge Behind Desk, Interior & Exterior Fountain Elements, Exterior
Seating, Paving Line, and Column Carvings. Work performed shall be of high quality, in compliance
with generally accepted standards of workmanship, and in conformity with the contract documents.
2. Time of Completion. The work to be performed pursuant to this Agreement shall
commence upon receipt by artist of the Notice to Proceed and shall be fully completed by July 11, 2007.
Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto.
The City shall grant a reasonable extension of time to the Artist in the event there is a delay on the part
of the City in performing its obligations under this Agreement or if conditions beyond the Artist's
control or Acts of God render timely performance of the Artist's services impossible.
3. Coital Project Management Control System. In order to insure that the Project is
consistent with its authorized scope and schedule, the Artist shall provide an approximate SCHEDULE
for the completion of all unit work items covered by the Agreement. The schedule shall indicate the
anticipated percentage completion of each unit work item for each week for the duration of the work.
The initial schedule must be submitted to the City prior to beginning the work.
4. City Representative. The City will designate, prior to commencement of the work, its
project representative who shall make, within the scope of his authority as provided by ordinance and in
the Capital Project Management Control System, all necessary and proper decisions with reference to
the Project. All requests for contract interpretations, change orders, or other clarification or instruction
shall be directed to the City representative.
5. Changes to Scope of Work.
A. Changes by Artist. Any change by Artist from the Project specifications and drawings in
Exhibit "A" must be approved in advance by the City.
B. Changes by the City. The City shall be entitled to request changes in the design and
construction of the Project through written Change Order Requests. No work related to the
requested change shall proceed until the parties have reached agreement regarding changes in
price or scheduling requirements related to the requested change, and a written Change Order
documenting the agreed upon terms is issued by the City.
Police Facility Summary of Prices
Item
Price
Museum Wall
$57,948
Officer Wall
$32,044
Badge Behind Desk
$3125
Sub Total Museum Elements
$93,117.00
Interior Fountain
$60,384
Exterior Fountains
$91,420
Exterior Seating
$0
Paving Line
$14,285
Column Carvings
$45,090
Sub Total Fountains and Seating
$211,179.00
TOTAL
$304,296.00
PSF Project Funding
Alternate Seating
APP Funding
Ft. Collim Police Facility
Art/Collage Wall
Wall unnposed of elrineIII n1'Jde or
nn�tal(,), Ola�s pI I o I pnn[5 dnd stoIIc.
f'lasind "uoeNiv ❑t plat e for reterenu'
lAlly - <linwnslons and specs from
Brinkley S,ayent
f (IPJ 1 HHh 1 1 h l oil"'.. Ai I,,i.F l iel�ii111 {'lit
fl)ut( -fly Pitl(,1111,1,,1i; M 01
No Text
Drum Scans from photos
156
scan
6
$938
Subtotal
206
$15,938
CDN 1886-176
1 DO% Artwork Design Pkg from City
ArtfCollage Wall
1-t.Collin s Police Facility
Officer Wall
Wall I!( o I[ I[),) s,I(j )t .t( I I,-,] 'j, I (I
1)110to "thud
WALL I', WMIIO'[ Ut'
`)M" Mi lAl S10D` Wjjj
I AY i I( 3 /4" PLYWOOD ON
ID
wkBY IDL MIN OYr) IN I I I\)VII w
RI), ON LACK Sd[)[
4e -S
)N ltfflo lho
91
No Text
Police Facility - Officer Wall
Glass Panel
1 $21,5631
1 panel I
1
$21,563
Subtotal
$21,563
$21,563
Design - Graphic Design I I I I
Granhir dasian_ rnllertion and rimdurtion $5() hr 50 S9 5�
Drum Scans from photos
$1561
scan
1 5 1
$781
Subtotal
$206
$3,281
CDN 1886-176
100% Artwork Design Pkg from City_OSttcar
Wall
WLET OPENNGS A RO
WATER LEV
Questions:
What is the surrounding flooring like?
Does it need to be waterproofed as well?
How far past the tank body and cap would the pad need to be poured?
Can the sculpture be mounted so far to one side of the pad?
Section View
CONCR
FOR SC
Bush Hammer Exterior Surface
Point Chisel Finish
Section View
'-`-: - Faces Saw Cut and Polished.
Impression With Saw Grooves
Elevation Interior Fountain
Point Chisel Finish
Impression With Saw Grooves (See Elevation)
—� Section View
Plan View
Scale: 1/2" = 1'-0"
9
CO
10
a
rn
p c c
ti °
U c
0 7
0 0
CD
I I
Z O .0
U g 0
Bush Hammer Exterior Surface
Point Chisel Finish
Impression With Saw Grooves
Impression With Saw Grooves
X
Scale: 1/2" = V-0"
6. Formal Acceptance and Ownership of the Project. No more than thirty (30) days after the
Artist has informed the City that the Project has been fully installed and is complete, the City will
provide a written response to the Artist, informing the same either that: (1) the City agrees that the
Project has been fully installed and is complete consistent with the terms of this Agreement, all other
related work is completed in accordance with this Agreement and Exhibit "A," and the City formally
accepts the Project as completed ("Letter of Acceptance"); or (2) the Project is not deemed to be
completed due to unresolved issues or defects that remain, and describing such outstanding issues or
defects which Artist must then cure before a Letter of Acceptance will be issued. The Project is not
finally complete for purposes of this Agreement until the City has issued a Letter of Acceptance. Upon
the City's issuance of a Letter of Acceptance the City will become the sole owner of the Project, and
artist shall have no further obligations hereunder, except as set forth in paragraphs 8, 9, 12, and 26.
7. Ownership of Works Created.
A. Assignment of ConvriQht. The Artist hereby assigns, transfers, and conveys to the City
all right, title and interest in and to the Project together with the copyright therein and the right to
secure copyright registration therefore, in accordance with Sections 101, 204, and 205 of Title 17
of the United States Code, the Copyright Law of the United States. This assignment, transfer
and conveyance includes, without limitation, any and all features, sections, and components of
the Project, any and all works derived therefrom, the Unites States and worldwide copyrights
therein, and any renewals or extensions thereof, and any and all other rights that the Artist now
has or to which he may become entitled under existing or subsequently enacted federal, state, or
foreign laws, including, but not limited to the following rights: to reproduce, publish, and display
the Project publicly, to prepare derivative works of and from the Project, to combine the Project
with other materials, and to otherwise exploit and control the use of the Project. As additional
consideration for this assignment, the City agrees that all reproductions of the Project by the City
shall credit the Artist.
B. License Back to Artist of Certain Rights. The City hereby grants to Artist the following
rights in and to the Project: the non-exclusive right to make two-dimensional reproductions of
the Project for any purpose, provided that any such reproduction clearly states the location of the
Project, acknowledges the City and the Art in Public Places Program, and contains a copyright
notice. With the exception of publicity pieces, the Artist shall not knowingly permit others to
make reproductions of the Project for commercial purposes without the written permission of the
City.
C. Rights under the Visual Artists' Rights Act. To the extent the uses or removal of the
Project under this Contract affect any rights Artist may have under the provisions of federal or
state law, including the 1990 Visual Artists' Rights Act, the Artist hereby knowingly waives any
rights of preservation of the Project provided by those laws.
8. Guarantee of Workmanship and Material. For a period of three (3) years, with the
exception of (1) year warranty on the Mechanical Contractors materials & workmanship from the date
of the City's Letter of Acceptance, Artist agrees to replace or correct any material defects in the Project,
whether caused by defects in the design, workmanship or materials used in the Project. If Artist fails to
replace or correct any such defects, or to make arrangements to do so within a reasonable time
satisfactory to the City, the City shall have the right to arrange for such replacement or correction, and
Artist agrees to reimburse the City for the costs of any such replacement or correction. Should the City
Plan View
No Text
No Text
U W� 40,447)
l
I
Wr�ir,,a Frq
I
I!I
S/ls p
" 4 �
• rare��
w�rarrrr�rwrrr/1r�i �®r
AMR w41
ti
vi
a
MI
No Text
ORAMAI
DEAF
INLET OPEMROg A MWe
WATER LEVEL
TE FOOTER
LCTURE
ROLE
Exterior Fountain Section
SECTION
Exterior Fountain Plan View
J� r
REM
No Text
Police Facilitv One Interior Fountain
Est
Category & Items
Bid Unit Price
Unit
Qty
Bid Price
Layout
Survey and Layout by others
0.00
LS
1
$0
Subtotal
0.00
$0
Fountain
Purchase of Cistern,Purchase and Installation
ofJet Spouts, Hardware and Filtration Unit
28475.00
LS
1
$28,475
Offloading, Setting & backfill of Cisterns by
0.00
LS
1
$0
Topping Slab for Basin poured by others
0.00
LS
1
$0
Electrical and Plumbing by others
0.00
LS
1
$0
Fabrication & Delivery of Center Stone & E
17180.00
LS
1
$17,180
Fabricate Custom Drainage Grate for Basir
833.33
per grate
1
$833
Equipment for Offloading and setting
0.00
LS
1
$0
Labor for setting Center Stone: Artist + 2
168.33
hr
10
$1,683
Installation of Basin: Artist + 2 Assistants
168.33
hr
20
$3,367
Setting Materials
800.00
LS
1
$800
Subtotal
47625.00
$52,338
Carving & Sandblasting
CAD Files for Sandblast mats
$50
hr
6
$300
Blast mat and adhesives
$250
LS
1
$250
Blasting Labor: Two assistants
$93
hr
8
$747
Subtotal
$1,010
$1,297
Project administration
Mobilization & clean up
0.05
$2,682
Project administration
0.10
$5,364
Subtotal
$8,045
Total Costs
$60,384
CDN 1886-176
100% Artwork Design Pkg from
City of Fort Collins
Interior Fountains
ask Artist to repair damage caused to the Project by vandalism, collision, or other unforeseeable
environmental damage, Artist shall be reimbursed for reasonable material and labor costs for such
repairs, except to the extent such damage is due to a defect in design, workmanship or materials used in
the Project.
9. Maintenance Instructions and Maintenance. Artist shall provide to the City written
instructions for maintenance of the Project, to include detailed information regarding the operation, care,
maintenance and repair of the Project and a complete set of digital images depicting no fewer than a
total of six views of each element of the completed Project. Following the warranty period, Artist
agrees to continue to provide advice to the City regarding the operation, care, maintenance and repair of
the Project at no charge to the City, unless otherwise agreed to by both parties in writing. The City shall
provide Artist with information sufficient for Artist to render an opinion on any issue for which advice is
sought. If the City wants the Artist to visit the Project site to obtain such information, the City shall
compensate Artist for Artist's time and reasonable and necessary travel expenses for such site visit.
10. Contract Sum. The City shall pay Artist for the performance of this Contract, subject to
additions and deletions provided herein, the total sum of Three Hundred and Four Thousand, Two
Hundred Ninety -Six Dollars ($304,296.), consisting of Two Hundred Twenty -Six Thousand, Five
Hundred Eighty -Seven Dollars ($226,587.) of APP funds and Seventy Seven Thousand, Seven Hundred
and Nine Dollars ($77,709.) from the Police Facility project through sources outside the APP program.
The City agrees to pay the Artist under the following schedule:
A. $91,200 upon full execution of this Agreement;
B. Up to $153,096 in monthly progress payments: Artist shall, once per month, submit an
invoice to the City representative documenting the time, materials and other allowable Project
expenses incurred by Artist in the previous 30 days for which Artist is seeking payment;
D. $ 60,000- or any remaining amounts due under this Agreement, upon the City's final approval
and acceptance of the Project as complete, and receipt by the City of satisfactory maintenance
instructions as described in Section 9, above, lien waivers in substantially the form shown in
Exhibit `B" from Artist and a comparable lien waiver from any and all Subcontractors that have
performed work or provided materials in connection with the Project.
11. Failure to Complete. The parties agree that if Artist becomes ill, dies, or is otherwise
unable or unwilling to complete the Project in accordance with the Agreement, any work already done
on the Project shall be the property of the City. The City shall be entitled to withhold any sums not yet
paid to Artist, and may use any such sums toward completion of the Project in any manner deemed
appropriate by the City.
12. Project as Unique. Artist represents and warrants that the Project is artistically unique,
and agrees that he will not create or be involved in the creation of an identical or substantially similar
artwork within 100 miles of Fort Collins, Colorado.
13. Liquidated Damages. It is specifically recognized by and between the parties hereto that
the City will suffer certain unspecified damages in the event the Project is not completed within the time
No Text
OX
%
VIA
31
PAO$
j-
K2,
"SAW
4'- Ali,;
Police Pavina Line
(note: pricing includes purchase of interior cobble w/interior install
Est
Category & Items
Bid Unit Price
Unit
Oty
Bid Price
Layout
Survey and Layout by others
$0
LS
1
$0
Subtotal
$0
$0
Stone Purchase and Delivery
Granite Cbobble
$18
sq ft
200
$3,667
Fabricate Stone Brackets for Trees
$167
pair
8
$1,333
Fabricate Sidewalk Medallion
$250
LS
1
$250
Offloading of Cobble by others
$0
LS
1
$0
Subtotal
$18
$5,250
Installation
Sub Slab for Cobble poured by others
$0
LS
1
$0
Equipment for Offloading and setting
$0
LS
1
$0
Install Cobble, brackets & sidewalk medalli
$32
sq ft
225
$7,172
Subtotal
$32
$7,172
Project administration
Mobilization & clean up
0.05
$621
Project administration
0.10
$1,242
Subtotal
$1,863
Total Costs
$14,285
CON 1886-176
100% Artwork Design Pkg from
City Paving
No Text
Police Facilitv Column Carvinas
Est
Category & Items
Bid Unit Price
Unit
Qty
Bid Price
Stone Purchase
Pennsylvania Blue Stone w one edge pitch
$1,467
per panel
4
$5,867
Subtotal
$1,467
$5,867
Stone Delivery
From Quarry to Studio
$3,333
LS
1
$3,333
Offload at Studio forklift w Operator)
$500
2 hr min
1
$500
Load at Studio forklift w Operator)
$442
2 hr min
1
$442
From Studio to Job Site
$120
hr
6
$720
Labor for offloading & loading: two Assista
$50
hr
16
$800
Lead artist supervise setting
$100
hr
24
$2,400
Subtotal
1 $4,445
$8,195
Note: Offloading at'obsite and installation by others
Carving & Sandblasting
Final Drawings for Carvings/ Lead Artist
$100
hr
60
$6,000
CAD Files for Sandblast mats
$50
hr
40
$2,000
Blast mat and adhesives
$667
LS
1
$667
Blastinq Labor. Two assistants
$93
hr
48
$4,480
Carving: Lead Artist
$100
hr
120
$12,000
Subtotal
$1,010
$25,147
Project administration
Mobilization & clean up
0.05
1 $1,960
Project administration
0.10
$3,921
Subtotal
$5,881
Total Costs
$45,090
CDN 106.176
100% Artwork Design Pkg from Cfty
Columns
set forth above, as adjusted for any delays agreed upon by the parties pursuant to Section 2, above. In
recognition of the difficulty of ascertaining the actual damages to be sustained by the City, the parties
agree that the assessment of liquidated damages shall be appropriate. In the event the Project is not
completed within the specified time, this shall be assessed against Artist, and Artist hereby authorizes
the City to retain from any monies due the Artist, the sum of One Hundred Dollars ($500.00) per day for
each and every calendar day the Project remains unfinished. In no event shall liquidated damages
exceed the sum of Twenty Four Thousand Dollars ($24,000.00).
14. Governing Law. This Agreement shall be governed by the laws of the State of Colorado.
15. Notice. Any notice to be sent pursuant to this Agreement shall be deemed delivered if
sent to the other party by certified or registered mail, return receipt requested and postage prepaid, at the
following address:
If to the Artist:
Chevo Studios, Inc.
Andrew Dufford
Denver, CO 80212
(303) 477-3780
16. Termination/Default.
If to the City:
Ellen Martin
Lincoln Center
417 West Magnolia
Fort Collins, CO 80521
(970)416-2789
A. Termination. This Agreement may be terminated by the City upon at least seven (7) days
written notice to the Artist. In such event the City shall compensate Artist for all services
performed to the date notice of termination is received, together with reasonable expenses then
due, unless otherwise agreed in writing by the parties.
B. Default. Each and every term and condition of this Agreement shall be deemed to be a
material element of this Agreement. Time is of the essence. In the event either party should fail
or refuse to perform according to the terms of this Agreement; they may be declared in default
thereof. If Artist defaults or neglects to carry out the work in accordance with this Agreement,
the City may elect to make good such deficiencies and charge Artist therefore.
C. Remedies Upon Default. In the event a party has been declared in default hereof and
performance is possible within the completion time as established herein, such defaulting party
shall be allowed a period of five (5) days within which to cure said default. In the event the
default remains uncorrected (or timely performance is not possible), the party declaring default
may elect to: (1) immediately terminate the Agreement; (2) treat the Agreement as continuing
and require specific performance; and/or (3) avail himself of any other remedy at law or equity.
If either party elects to terminate the agreement for default, termination shall be effective upon
the mailing, by the terminating party, of written notice of termination to the defaulting party.
D. Attorneys Fees. In the event of default of any of the agreements herein by either party
which shall require the party not in default to commence legal or equitable action against the
defaulting party, the defaulting party shall be liable to the non -defaulting party for the non-
defaulting party's reasonable legal fees, including attorney's fees, incurred because of the
default.
17. Assignment. It is understood that the City enters into this Agreement based on the
special abilities of Artist and that this Agreement shall be considered as an agreement for personal
services. Accordingly, Artist shall neither assign any responsibilities nor delegate any duties arising
under this Agreement without the prior written consent of the City.
18. Artist -- Independent Agent. The Artist shall perform all work under this Agreement as
an independent agent and shall not be considered an agent of the City, nor shall the Artist's
Subcontractors or employees be subagents of the City.
19. License and Business. The Artist shall hold, in the Artist's name, all necessary licenses to
perform the work, and shall have full authority to do business in the State of Colorado. The Artist shall
have a designated place of business for making and accepting communications with or from the City.
The address and telephone number of Artist shall be maintained with the City throughout the contract
period.
20. Superintendence. The Artist shall keep competent supervisory personnel on the work
during its progress and designate before starting work an authorized representative who shall have
complete authority to represent and to act for the Artist. The Artist shall provide efficient supervision of
the work, using his best skill and attention. The Artist shall be solely responsible for all construction
means, methods, techniques, and procedures, and for providing adequate safety precautions and
coordinating all portions of the work.
21. Employees. The Artist shall employ only competent, skillful workers to do the work;
whenever any person shall appear to be incompetent or to act in a disorderly or improper manner; such
person shall be removed from the work.
22. Subcontractors. It is understood by the parties that the Artist may utilize Subcontractors
to complete the fabrication, transportation and/or installation of the Project, under Artist's direction and
supervision. The Artist shall, within fifteen (15) days of the effective date of this Agreement, submit to
the City the names of all Subcontractors proposed for the work. The Artist shall not employ any
Subcontractors that the City may object to as lacking capability to properly perform work of the type
and scope anticipated. The Artist agrees that he is as fully responsible to the City for the acts and
omissions of his Subcontractors and of persons either directly or indirectly employed by them as he is
for the acts and omissions of persons directly employed by him. Nothing contained in the contract
documents shall create any contractual relation between any Subcontractor and the City, except to the
extent the City is indemnified or insured through requirements upon said Subcontractor. If
subcontractors are used, the City may, in its discretion, require the submission of lien waivers in a form
reasonably acceptable to the City by any such subcontractors prior to final payment to the Artist.
23. Prosecution of the Work. It is expressly understood and agreed that the time of
beginning, rate of progress, and time of completion of the work are the essence of this Agreement. The
work shall be prosecuted at such time, and in or on such part or parts of the project as may be required to
complete the Project during the time specified in the Agreement and the approved construction schedule.
The Artist's tools and equipment used on the work shall be furnished in sufficient quantity and of a
capacity and type that will safely perform the work specified without delay in the progress of the work.
24. Safety. The Artist shall be solely responsible for maintaining a safe work area and
protecting the safety and welfare of Artist's employees, subcontractors, and the general public, including
without limitation area residents, motorists, bicyclists, pedestrians, and children from work area hazards.
The Artist shall provide all work area safety control devices, at Artist's cost, including, for example,
barricades and safety fences around excavations and drop-offs. The Artist's safety precautions shall be
in compliance with all applicable laws, rules and regulations.
25. Work and Property. The Artist shall use his best efforts to at all times safely guard the
City's property from injury or loss in connection with the work. The Artist shall, at all times, use his
best efforts to safely guard and protect from damage the work and adjacent property, including
underground utilities. All passageways, guard fences, lights, and other facilities required for protection
by state or municipal laws and regulations and location conditions must be provided and maintained.
The Artist shall protect the work and materials from damage due to the nature of the work, the elements,
carelessness of the Artist, or from any foreseeable cause whatever until the completion and acceptance
of the Project. All loss or damages arising out of the nature of the work to be done under this
Agreement, or from any unforeseen obstruction or defects which may be encountered in the prosecution
of the work, or from the action of the elements, shall be the liability of the Artist.
26. Indemnity. The Artist shall indemnify and hold harmless the City, and its officers, agents
and employees, from and against all claims, damages, losses, and expenses, and legal fees including
attorney's fees, arising out of or resulting from the Artist's performance under this Agreement.
In any and all claims against the City, or any of its officers, agents, or employees by any employee or
agent of the Artist, or of any Subcontractor, the indemnification obligation under this Section shall not
be limited in any way by any limitation on the amount or type of damages, compensation, or benefits
payable by or for the Artist or any Subcontractor under Workmen's Compensation laws, Disability
Benefit laws, or other employee benefit laws.
27. Insurance and Liability. The Artist shall provide, or in lieu of himself providing, shall
require all Subcontractors providing services in connection with this Agreement to provide from
insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all
costs before commencing work under this Agreement. The Artist shall furnish the City with certificates
of insurance specified herein showing the type, amount, class of operations covered, effective dates, and
date of expiration of policies, and containing substantially the following statement:
"The insurance covered by this Certificate will not be canceled or materially
altered, except after ten (10) days written notice has been received by the Owner,
the City of Fort Collins."
In case of the breach of any provision of this Section, the City, at its option, may take out and maintain,
at the expense of the Artist, such insurance.
The Artist shall not commence work under this Agreement until all the insurance required thereunder
has been reviewed by the City and an acceptable certificate of insurance has been provided to the City.
The Artist, or in lieu thereof, all Subcontractors of Artist, shall maintain during the life of this
Agreement the statutory Worker's Compensation Insurance required and, in addition, Employer's
Liability Insurance in an amount not less than $400,000 for each occurrence, for all of his her
employees, if any, to be engaged in work on the Project under this Agreement.
The Artist and all Subcontractors of Artist shall maintain during the life of this Agreement such
commercial general liability insurance as will provide coverage for claims for damages for personal
injury, including accidental death, as well as for claims for property damage, which may arise directly or
indirectly from performance of the work under this Agreement. Coverage for property damage shall be
on a "broad form" basis. Amount of insurance to be provided shall be not less than $300,000 combined
single limits for bodily injury and property damage.
In the event any work under this Agreement is performed by a Subcontractor, the Artist shall be
responsible for any liability directly or indirectly arising out of the work performed under this
Agreement by a Subcontractor, which liability is not covered by the Subcontractor's insurance.
The City shall be named as additional insured on the Artist's and any Subcontractor's insurance policies
required under this Agreement, for any claims arising out of work performed under this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first
above written.
�,OF FORT�i
TTEST:
SEAL
Wanda Krajicek • :,
City Clerk �'o:•�•�•�:.n
APPROVED AS TO FORM:
Assist City Attorney
THE CITY OF FORT COLLINS, COLORADO,
A Municipal Corporation
BY: tz 01 &t-;Q
J ej B. O'Neill II, CPPO, FNIGP
Dir ctor of Purchasing and Risk Management
ARTIST:
CHEVO STUDIOS,
A Colorado Comma
Andrew Dufford, President
STATE OF COLORADO )
)ss.
COUNTY OF Q ( )
Subscribed and sworn to before me this day of2006, by:
Oro fe�,j
Witness my hand and official seal. /
My Commission Expires:
Notary Public
eft
4� r./}r fr r•
EXHIBIT B
SAMPLE LIEN WAIVER RELEASE
(ARTIST)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Chevo Studios, Inc, (ARTIST)
PROJECT: Police FacilityProjecf
1. The ARTIST acknowledges having received payment,
skill and material furnished, delivered and performed by the Al
design, improvement, alteration, addition or repair of the above
tal payment, from the OWNER for all work, labor,
the OWNER or for anyone in the construction,
project.
2. In consideration of such payment and this good and valuable consideration, the receipt and adequacy of which are
hereby acknowledged, the ARTIST,t bhmtarily waives all rights, claims and liens, including but not limited to, mechanic's
notices, equitable liens and labor and material bond rights which the ARTIST may now or may afterward have, claim or
assert for all and any work, labor.- skill or maierisls punished, delivered or performed for the construction, design,
improvement, alteration, addition`or repair of the above described project, against the OWNER or its officers, agents,
employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all
land and the buildings on and appurtenances to the land improved by the project.
3. The ARTIST affirms that all work, labor and materials, furnished, delivered or performed to or for the construction,
design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the ARTIST or
its agents, employees, and servants, or by and through the ARTIST by various Subcontractors or material men or their agents,
employees and servants and further affirms the same have been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S rights or control
concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project.
4. The ARTIST agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project
against and from any claim hereinafter made by the ARTIST'S Subcontractors, material men, employees, servants agents or
assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for
all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the
property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver
Release is for the benefit of and may be relied upon by the OWNER, the LENDER, if any, and Surety on any labor and
material bonds for the project.
Signed this day of , 2007.
CHEVO STUDIOS, INC.
By:
President
STATE OF COLORADO )
) ss.
COUNTY OF )
Subscribed and sworn to before me this
Witness my hand and official seal.
My Commission Expires:
Notary Public
day of 2007,by: