Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 28061Change Order Form Engineering Department PROJECT TITLE: 2006 Street Maintenance Program PROJECT NUMBER: 320200 (Concrete Project - Bid #5847) CONTRACTOR: Vogel Concrete (PO #6601601) CHANGE ORDER NUMBER: 8 n preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for -change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. See attached invoice for details 3. The contract cost will increase by $10,380.54 4. Two (2) days will be added to the contract time. ORIGINAL CONTRACT COST $1,491,976.37 TOTAL APPROVED CHANGE ORDERS $31,094.24 TOTAL PENDING CHANGE ORDERS $25,075.75 TOTAL THIS CHANGE ORDER $10,380.54 TOTAL % OF THIS CHANGE ORDER 0.70% TOTAL C.O. % ORIGINAL CONTRACT 4.46% ADJUSTED CONTRACT COST $1,558,526.90 ACCEPTED BY: DATE: �� O (Contractor's Representative) APPROVED BY: APPROVED BY: APPROVED BY:L____' APPROVED BY: cc: Purchasing Accounting Contractor Project File (Department Head) (Purchasing Agent over $30,000) DATE: t�/ 041O(A DATE: DATE: I I I-6G DATE: Engineering Department • 281 North College Avenue • P.O. Boa 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 + _ 2006 Concrete Project Vogel Concrete Bid No. 5847 Change Order No.: 8 Date: 10/27/2006 1. Reason For Change: - a. Additional concrete work was performed by Vogel Concrete for City Stormwater Utility adjacent to Rehab repairs on Olive. b. Additional labor work was performed by Vogel Concrete for City Stonnwater Utility adjacent to repairs on Olive. 2. Description Of Change: a. Increase the quantities in the contract for the specific items. b. Lump sum cost for labor to repair stonnwater pipe in Howes & Olive intersection. 3. Change In Contract Amount: a. Additional concrete repair. Unit Total Units Unit Cost Total Cost 304.01 Aggregate Base Course Ton 3.94 $ 26.92 $ 106.06 604.06 Type 13 Curb Inlet w/ Frame, Grate. Adj. Curb Bonnet Each 3.00 $ 1,741.93 $ 5,225.79 608.37 8" Concrete Pavement SF 354.50 $ 8.05 $ 2,853.73 608.2 Highback Curb & Gutter - No Sidewalk- R&R LF 5.00 $ 34.65 $ 173.25 608.3 Replace Fiatwork - 1" Additional Depth SF 709.00 $ 0.66 $ 467.94 614.03 Channelizing Barris DAY/EA 15.00 $ 0.77 $ 11.55 614.04 Type I Barricade Without Light DAY/EA 45.00 $ 0.64 $ 28.80 614.06 Type III Barricade Without Light DAY/EA 12.00 $ 3.78 $ 45.36 614.07 Size A Sign With Stand DAY/FA 9.00 $ 1.36 $ 12.24 614.12 Safety Fence Per Day Per Roll 6.00 $ 4.59 $ 27.54 614A5 Advanced Warning Flashing or Sequencing Arrow Panel Per Day Per Roll 2.00 $ 76.58 $ 153.16 614.16 Traffic Control Supervisor Per Day 2.00 $ 342.04 $ 684.08 614.18 Flagging Per Hour 10.00 $ 19.71 $ 197.10 Sub -Total - $ 9,880.54 b. Lump sum for pipe repairs. LS 1.00 $ 500.00 $ 500.00 TOTAL CHANGE IN CONTRACT AMOUNT Stormwater Utility $ 10,380.54 4. Change In Contract Time a. Two days are added in contract time. TOTAL CHANGE IN CONTRACT TIME 2 Days H:\p.m.p\PROJECTS\2006\Concrete106 Monthly Pay EsUmateAs 1 of 1