NAME OF PROJECT: LPATH BERM EROSION PROTECTION MEASURES
SECTION 00020
SUMMARY OF WORK
The contract documents provide for: The project includes the removal of existing fence, the
removal of existing trees and concrete rubble, and the installation of erosion control measures.
The project also includes the excavation and transportation of fill material and the placement of
fill material. The installation of concrete block revetment mats, the installation of concrete sills,
buried riprap, and the preparation of all disturbed areas for revegetation.
DATE CONTRACTS WILL BE AVAILABLE
Thursday, September 28th, 2006
REFUNDABLE FEE OR NONREFUNDABLE FEE: N/A
PREBID CONFERENCE AND JOB WALK
Highly recommended, not mandatory
10:00 a.m. Thursday, October 5th, 2006, at 215 N. Mason 1st floor, Community Room.
SECTION 00300
BID SCHEDULE : Excel File Attached.
SECTION 00430
SCHEDULE OF SUBCONTRACTORS:
Subcontractors performing over 15% of contract.
SECTION 00520
ARCHITECT OR CONSULTANT
Engineer: Anderson Consulting Engineers, Inc
CONTRACT TIMES
Substantial Completion: Defined as all buried riprap completed. North and South spill
completed including concrete sills, concrete block revetment mats, and backfilling. All cut/fill
work along the top of berm at both spill locations. All final grading completed at the borrow
site. All ground preparation for revegetation excepted. 90 Calendar Days from start. 3/23/2007
Final Completion: 7 Calendar Days past Substantial Completion Date. 3/30/2007
LIQUIDATED DAMAGES
Substantial completion: $750 per calendar day
Final Acceptance: $500 per calendar day
DRAWINGS
LPath Berm Erosion Protection Measures
Index of Sheet
Sheet No. Index No. Description
1 1 COVER SHEET
2 C1 PROJECT INFORMATION
3 C2 NORTH SPILL-DEMOLITION, UTILITIES, AND SURVEY CONTROL
4 C3 SOUTH SPILL-DEMOLITION, UTILITIES, AND SURVEY CONTROL
5 C4 NORTH SPILL AND BORROW SITE-INGRESS/EGRESS, STAGING, AND
TRAFFIC CONTROL PLAN
6 C5 SOUTH SPILL-INGRESS/EGRESS, STAGING, AND TRAFFIC CONTROL
PLAN
7 C6 NORTH SPILL-PLAN AND PROFILE
8 C7 NORTH SPILL-GRADING AND CROSS SECTION LOCATIONS
9 C8 NORTH SPILL-BERM CROSS SECTIONS
10 C9 NORTH SPILL-BERM CROSS SECTIONS
11 C10 NORTH SPILL-RIPRAP CROSS SECTIONS
12 C11 SOUTH SPILL-PLAN AND PROFILE
13 C12 SOUTH SPILL-PLAN AND PROFILE
14 C13 SOUTH SPILL-BERM CROSS SECTIONS
15 C14 SOUTH SPILL-BERM CROSS SECTIONS
16 C15 SOUTH SPILL-BERM CROSS SECTIONS
17 C16 NORTH SPILL-CONCRETE BLOCK REVETMENT MAT LAYOUT PLAN
18 C17 SOUTH SPILL-CONCRETE BLOCK REVETMENT MAT LAYOUT PLAN
19 C18 NORTH SPILL-EROSION CONTROL PLAN
20 C19 SOUTH SPILL-EROSION CONTROL PLAN
21 C20 BORROW SITE-GRADING AND EROSION CONTROL PLAN
22 C21 CONCRETE REVETMENT MAT DETAIL
23 C22 MISCELLANEOUS DETAIL
24 L1 NORTH SPILL-LANDSCAPE AND REVEGETATION PLAN
25 L2 SOUTH SPILL-LANDSCAPE AND REVEGETATION PLAN
26 L3 SOUTH SPILL-LANDSCAPE AND REVEGETATION PLAN
27 L4 BORROW AREA-LANDSCAPE AND REVEGETATION PLAN
28 L5 NORTH SPILL CONSTRUCTION AREA-LANDSCAPE AND
REVEGETATION PLAN
29 L6 SOUTH SPILL CONSTRUCTION AREA-LANDSCAPE AND
REVEGETATION PLAN
30 D1 POSSIBLE DEWATERING SCENARIOS
SECTION 00800
SUBSURFACE AND PHYSICAL CONDITIONS: Geotechnical investigation report attached.
WEATHER
Chart