HomeMy WebLinkAboutBID - 5998 LPATH BERM EROSION PROTECTION MEASURES (6)FRONT END DOCUMENT INFORMATION NAME OF PROJECT: LPATH BERM EROSION PROTECTION MEASURES SECTION 00020 SUMMARY OF WORK The contract documents provide for: The project includes the removal of existing fence, the removal of existing trees and concrete rubble, and the installation of erosion control measures. The project also includes the excavation and transportation of fill material and the placement of fill material. The installation of concrete block revetment mats, the installation of concrete sills, buried riprap, and the preparation of all disturbed areas for revegetation. DATE CONTRACTS WILL BE AVAILABLE Thursday, September 28th, 2006 REFUNDABLE FEE OR NONREFUNDABLE FEE: N/A PREBID CONFERENCE AND JOB WALK Highly recommended, not mandatory 10:00 a.m. Thursday, October 5th, 2006, at 215 N. Mason 1st floor, Community Room. SECTION 00300 BID SCHEDULE : Excel File Attached. SECTION 00430 SCHEDULE OF SUBCONTRACTORS: Subcontractors performing over 15% of contract. SECTION 00520 ARCHITECT OR CONSULTANT Engineer: Anderson Consulting Engineers, Inc CONTRACT TIMES Substantial Completion: Defined as all buried riprap completed. North and South spill completed including concrete sills, concrete block revetment mats, and backfilling. All cut/fill work along the top of berm at both spill locations. All final grading completed at the borrow site. All ground preparation for revegetation excepted. 90 Calendar Days from start. 3/23/2007 Final Completion: 7 Calendar Days past Substantial Completion Date. 3/30/2007 LIQUIDATED DAMAGES Substantial completion: $750 per calendar day Final Acceptance: $500 per calendar day DRAWINGS LPath Berm Erosion Protection Measures Index of Sheet Sheet No. Index No. Description 1 1 COVER SHEET 2 C1 PROJECT INFORMATION 3 C2 NORTH SPILL-DEMOLITION, UTILITIES, AND SURVEY CONTROL 4 C3 SOUTH SPILL-DEMOLITION, UTILITIES, AND SURVEY CONTROL 5 C4 NORTH SPILL AND BORROW SITE-INGRESS/EGRESS, STAGING, AND TRAFFIC CONTROL PLAN 6 C5 SOUTH SPILL-INGRESS/EGRESS, STAGING, AND TRAFFIC CONTROL PLAN 7 C6 NORTH SPILL-PLAN AND PROFILE 8 C7 NORTH SPILL-GRADING AND CROSS SECTION LOCATIONS 9 C8 NORTH SPILL-BERM CROSS SECTIONS 10 C9 NORTH SPILL-BERM CROSS SECTIONS 11 C10 NORTH SPILL-RIPRAP CROSS SECTIONS 12 C11 SOUTH SPILL-PLAN AND PROFILE 13 C12 SOUTH SPILL-PLAN AND PROFILE 14 C13 SOUTH SPILL-BERM CROSS SECTIONS 15 C14 SOUTH SPILL-BERM CROSS SECTIONS 16 C15 SOUTH SPILL-BERM CROSS SECTIONS 17 C16 NORTH SPILL-CONCRETE BLOCK REVETMENT MAT LAYOUT PLAN 18 C17 SOUTH SPILL-CONCRETE BLOCK REVETMENT MAT LAYOUT PLAN 19 C18 NORTH SPILL-EROSION CONTROL PLAN 20 C19 SOUTH SPILL-EROSION CONTROL PLAN 21 C20 BORROW SITE-GRADING AND EROSION CONTROL PLAN 22 C21 CONCRETE REVETMENT MAT DETAIL 23 C22 MISCELLANEOUS DETAIL 24 L1 NORTH SPILL-LANDSCAPE AND REVEGETATION PLAN 25 L2 SOUTH SPILL-LANDSCAPE AND REVEGETATION PLAN 26 L3 SOUTH SPILL-LANDSCAPE AND REVEGETATION PLAN 27 L4 BORROW AREA-LANDSCAPE AND REVEGETATION PLAN 28 L5 NORTH SPILL CONSTRUCTION AREA-LANDSCAPE AND REVEGETATION PLAN 29 L6 SOUTH SPILL CONSTRUCTION AREA-LANDSCAPE AND REVEGETATION PLAN 30 D1 POSSIBLE DEWATERING SCENARIOS SECTION 00800 SUBSURFACE AND PHYSICAL CONDITIONS: Geotechnical investigation report attached. WEATHER Chart