Loading...
HomeMy WebLinkAboutBID - 5998 LPATH BERM EROSION PROTECTION MEASURES (4)Addendum 2 5998 LPATH Berm Erosion Protection Measures Revised Bid Schedule Unit Item Cost ($) Cost ($) 1 Mobilization LS 1 2 Traffic / Access Control LS 1 3 Clearing and Grubbing LS 1 Construction Dewatering (North Spill and River Riprap Location) 5 Remove Concrete Rubble (Assume 3 feet thick) CY 1150 6 Fence Removal/Resetting (Wood Fence) LF 100 7 Silt Fence LF 3845 8 Straw Bale – Sediment and Erosion Control Structure EA 8 9 Unclassified Excavation at Borrow Site CY 10430 10 Muck Excavation CY 200 11 Native Soil (Over Revetment Mat Only) CY 1040 Excavation and Embankment of On-Site Material at South Spill Only (Complete In Place) – No Haul Embankment of Borrow Material at both spills (Complete In Place) Including Haul from Borrow Site North Spill = 6400 CY, South Spill = 2670 CY (Assumed 15% shrinkage in Borrow Site material) 14 Concrete Sill (Complete In Place) CY 170 15 Concrete Block Revetment Mat - North Spill SF 27453 Concrete Block Revetment Mat (Including drainage layer) - South Spill 17 Riprap (Class 12) TON 1560 4" to 8" Crushed Concrete Rubble (Quantity Assumed 20% extra for voids) 19 1-1/2" Washed Rock (Quantity Assumed 35% extra for voids) TON 818 20 Landscape - Tree Removal (> 12" Diameter) EA 15 21 Ground Preparation for Seeding AC 9 22 Topsoil (Delivery and Stockpile only - No Installation) CY 200 TOTAL COST 18 28640 TON 1968 16 SF 13 12 CY 1652 CY 9070 8. BID SCHEDULE (Base Bid)Lump Sum 4 LS 1 Item Number Description Unit Estimated Quantity Addendum 2 5998 LPATH Berm Erosion Protection Measures Revised Bid Schedule Total Cost in Words:___________________________________________________________________Dollars