Loading...
HomeMy WebLinkAboutBID - 5998 LPATH BERM EROSION PROTECTION MEASURES (12)Project: LPATH Berm Erosion Protection Measures Bid Schedule Item Description Unit Estimated Number Quantity 1 Mobilization LS 1 2 Traffic / Access Control LS 1 3 Clearing and Grubbing LS 1 4 Construction Dewatering (North Spill and River Riprap Location) LS 1 5 Remove Concrete Rubble SF 10350 6 Fence Removal/Resetting (Wood Fence) LF 100 7 Silt Fence LF 3845 8 Straw Bale – Sediment and Erosion Control Structure EA 8 9 Unclassified Excavation (Quantity Assumed 15% shrinkage in Borrow Site material) CY 9068 10 Muck Excavation CY 200 11 Native Soil (Over Revetment Mat Only) CY 1040 12 Embankment (Complete In Place) without Haul - South Spill Only CY 1652 13 Embankment (Complete In Place) with Haul - Both Spill Locations CY 9738 North Spill = 7416 CY, South Spill = 2322 CY 14 Concrete Sill (Complete In Place) CY 170 15 Concrete Block Revetment Mat - North Spill SF 27453 16 Concrete Block Revetment Mat (Including drainage layer) - South Spill SF 28640 17 Riprap (Class 12) TON 1560 18 4" to 8" Crushed Concrete Rubble (Quantity Assumed 20% extra for voids) TON 1968 19 1-1/2" Washed Rock (Quantity Assumed 35% shrinkage) TON 818 20 Landscape - Tree Removal (> 12" Diameter) EA 15 21 Ground Preparation for Seeding AC 9 22 Topsoil (Delivery and Stockpile only - No Installation) CY 200 TOTAL COST TOTAL COST IN WORDS July 2006 Section 00525 Page 4 Unit Item Cost ($) Cost ($) ---- ---- ________________________ July 2006 Section 00525 Page 4