HomeMy WebLinkAboutBID - 5998 LPATH BERM EROSION PROTECTION MEASURES (8)Administrative Services
Purchasing Divison
215 North Mason Street 2nd Floor P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6775 Fax (970) 221-6707 www.fcgov.com
ADDENDUM No. 2
5998 LPATH Berm Erosion Protection Measures
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5998 LPATH Berm Erosion Protection Measures
OPENING DATE: 3:00 P.M. (Our Clock) October 19, 2006
To all prospective bidders under the specifications and contract documents described above, the
following changes are hereby made.
Revision: Section 01270 Measurement and Payment
SECTION 01270
MEASUREMENT AND PAYMENT
1.02 PAY ITEMS
5. Remove Concrete Rubble
The measurement for removal of this item will be made on a unit basis. The unit
price bid for this item shall be full compensation for removing, hauling and
disposal of such items including existing concrete rubble, and all other work
necessary to remove these items in accordance with the Drawings and
Specifications. Replacement of riprap, trees, or vegetation outside of the pay
lines due to the CONTRACTOR’s failure to protect existing, undisturbed
materials shall not be paid for and shall be replaced at the CONTRACTOR’s
expense.
Pay Item Pay Unit
Remove Concrete Rubble (Assume 3 feet thick) CY
9. Unclassified Excavation at Borrow Site
12. Excavation and Embankment of on-site material at South Spill (Complete In
Place) - No Haul
13. Embankment of Borrow Material at both spills (Complete In Place) including
Haul from Borrow Site
The measurement for payment of unclassified excavation will be the total
number of cubic yards of material excavated according to the final Drawings.
Unclassified excavation shall consist of excavation of all materials on the site to
final grades, excluding the bid items listed in Section 02220. Excavation of
unsuitable material will only be paid for if it is found to be unsuitable in its
original state. Unclassified excavation shall be measured from the drawings and
cross sections, and the plan quantity will be paid for by the cubic yard.
Muck excavation shall include excavation of unsuitable material and haul and
disposal of unsuitable material. Muck excavation shall also include the cost of
materials used to replace muck excavation. Muck excavation of material from
rain or weather damage will not be paid for and is entirely the CONTRACTOR’S
responsibility. This item will be measured in the field and will be paid for by the
cubic yard.
If unsuitable subgrade is encountered and the ENGINEER directs the
CONTRACTOR to overexcavate the material, the CONTRACTOR shall use
uniformly graded 1 1/2” rock. This item will be measured in the field and will be
paid by the cubic yard per ticket of material used.
Native Soil shall include stripping existing vegetation, temporarily stockpiling,
load, haul and placement of topsoil within all designated areas of the construction
site. This item shall be measured in the field and the volume calculated by the
area multiplied by the depth, as determined by the ENGINEER with no
allowance for shrinkage or swell, and shall be paid for by the cubic yard.
Embankment (Complete In Place) without Haul shall include all excavated
material, which is placed as embankment and compacted to final grades as
specified in Section 02315. This item shall include placement and compaction of
excavated material that has been determined as suitable from the on-site
excavations. This item will be measured from the drawings and cross sections
and the plan quantity will be paid for by the cubic yard.
Embankment (Complete In Place) with Haul shall include all excavated material,
which is placed as embankment and compacted to final grades as specified in
Section 02315. This item shall include haul, placement and compaction of
excavated material that has been determined as suitable from the on-site
excavations. This item will be measured from the drawings and cross sections
and the plan quantity will be paid for by the cubic yard.
Pay Item Pay Unit
Unclassified Excavation at Borrow Site CY
Muck Excavation CY
Native Soil (Over Revetment Mat Only) CY
Excavation and Embankment of on-site material at
South Spill (Complete In Place) without Haul CY
Embankment of Borrow Material at both spills
(Complete In Place) including Haul from Borrow Site CY
Please contact at (970) with any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.