HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27704Change Order Form Engineering Department PROJECT TITLE: Ziegler Rd. & Kechter Rd. Roundabout PROJECT NUMBER: 30523285.6 (Bid #5979) CONTRACTOR: Gerrard Excavation (PO #6603521) CHANGE ORDER NUMBER: 4 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 51,800.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST $1,456,808.87 TOTAL APPROVED CHANGE ORDERS ($38,541.33) TOTAL PENDING CHANGE ORDERS $9,003.05 TOTAL THIS CHANGE ORDER $51,800.00 TOTAL % OF THIS CHANGE ORDER 3.56% TOTAL C.O. % OF ORIGINAL CONTRACT 1.53% ADJUSTED CONTRACT COST $1,479,070.59 (Assuming all change orders approved) ACCEPTED BY: ( DIu" uj-(.l - DATE: Contractor's Representative) REVIEWED BY: DATE: )D S oZoO(o (Project Engineer) / ACCEPTED DATE: (Project Man (r - Engineering) ACCEPTED BY: LJU) At p� k A `11 L DATE: jU • 4 •0 1(5epartment Head - Engineering) APPROVED BY: 0 DATE: (Purch ing 'gent over $30,000) t cc'. Contractor Purchasing Project File Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Zeigler Road and Kechter Road Roundabout Project Gerrard Excavating The Contractor was awarded a Contract Substantial Completion Incentive per Section 00520, Page 2, Article 3.2.3) of the contract. Item Quantity Unit $ 1 Unit Total Contract Incentive 1 251 DAYS $ 2,072.00 $ 51,800.00 TOTAL I $ 51,800.00 The Contractor substantially completed the project 25 days prior to the total number of days allowed in the contract. Posted to Pay Estimate No.4 - FINAL