Change Order Form
PROJECT TITLE: Ziegler Rd. & Kechter Rd, Roundabout
PROJECT NUMBER: 30523285.E (Bid #5979)
CONTRACTOR: Gerrard Excavation (PO #6603521)
CHANGE dRDER NUMBER: 3
n preparing change orders show In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will increase by 5 9,003.06
4. Thero will be no change in contract time,
P.
P
01
d
K
0
V
J
r
a
o
°
�
a
�4
R
c
ORIGINAL CONTRACT COST
$1,458,608.87
TOTAL APPROVED CHANGE ORDERS
($38,541.33)
TOTAL PENDING CHANGE ORDERS
$0,00
TOTAL THIS CHANGE ORDER
$9,003,05
TOTAL % OF THIS CHANGE ORDER
0.82%
TOTAL C.O, "% OF ORIGINAL CONTRACT
-2,03%
APJUSTEP CONTRACT COST
$1,427,270.59
(Assuming all change orders approved)
ACCEPTED BY:
( Contractor's Representative)
DATE; /G-S t➢_,__
REVIEWED BY: Y l _ _ DATE; d
(Project�Engineer)
� ACCEPTED BY, BY: _._"=�1r�`"� DATE; l�%z�
(Project Mans - Engineering)
ACCEPTED BY: W _ DATE: —16. L L
(Department Head - Engineering)
APPROVED BY:
cc: Oonlractor
PurchiWr g
Projmr File
DATE: ,C5 L Z O
F.nainPer inv Denartment - 281 North Caileee Avenue - P.O. Box 580 - Fort Collins. CO 80522.0580 - f970) 221.6605
OCT-10-2006 TUE 07:24 AM CFO ENG, FAX NO, 9702216378 P. 02
GHANOE ORDER NO.3
Zeigler Road and Kechter Road Roundabout Project
SUMMARY OF WORK
Garrard Excavating
Installation of 2" PVC InigaWn One to final'ae connaebon to Iha RoundaboUfS center median.
(Please see attached Invoice # 200610001, dated 10/0412006)
Item Quantify Unit $1 Unit Total
Installation of lnl adon Line
11
LS
s 8,730.25
1 s 9.730.25
PCLWD Water Usage for Irrl ailon
11
1.3
1 $ 272.801
3 272.80
TOTAL
Is 9,003.05
REASON FOR CHANGE
The project was able to ulifize an existing irrigation line (Poudre School Dialriict for the Park
Systam). As a rasull, [his e6minatod tho rood to Inslall a new Irrigation tap onto the
FCLWO water line which provided a significant mat savings.
WHEN POSTED
Posted to Pay Eaffmate No.4 - FINAL