Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27707Change Order Form Engineering Department PROJECT TITLE: Timberline Rd. Widening Project PROJECT NUMBER: 30523270.6 (Bid #5954) CONTRACTOR: Connell Resources, Inc. (PO #6601742) CHANGE ORDER NUMBER: 7 n preparing cnange orders snow in order as separate numoered paragraphs the touowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $30,912.43 4. There will be no change in contract time. ORIGINAL CONTRACT COST $5,277,645.27 TOTAL APPROVED CHANGE ORDERS $158,025.60 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $30,912.43 TOTAL % OF THIS CHANGE ORDER 0.59% TOTAL C.O. % OF ORIGINAL CONTRACT 3.58% ADJUSTED CONTRACT COST $6,466,583.30 (Assuming all change orders approved) ACCEPTED ACCEPTED BY: sz�DATE: ��\�LP (Contractor's ep s� e) / �1 :T BY: DATE: L 0��O0z �n (Project Manag REVIEWED BY: /`t A—, DATE: (Engineer) APPROVED BY: ��htt. DATE: In - (L - OG epartment Head) (� r APPROVED BY: DATE: /y / � (Pur hasing Agent over $30,000) 7 cc: Contractor Purchasing Project File Engineering Department • 231 North College Avenue • P.O. Box 590 • Fort Collins, CO 80522-0590 • (970) 221-6605 v Connell Resources Inc. CHANGE ORDER NO.7 TIMBERLINE ROAD WIDENING PROJECT. INTERM SUMMARY OF WORK See attached submittal If.m n1 i2ntitu Ilnif t I I IMf T-+.1 9036 Hydromutch and Seed 15 ACRE $ 855.00 $ 12,825.00 9037 Seed and Straw Mulch 5.5 ACRE $ 545,00 $ 2,997.50 9040 Additional Concrete Costs 931.75 Cy $ 5.10 $ 4,751.93 9041 Raise Air Release Valve and Valve Box 1 LS $ 2.614.00 $ 2,614.00 9042 Pump Truck for Bike Path 1 LS $ 2,739.00 $ 2,739.00 9043 Abandon 3" Waterline 1 LS It 1,050.00 $ 1,050.00 9044 Install 18" ADS Pipe 1 LS $ 2.635.00 $ 2,635.00 9045 1 Removed Asphalt & Raised Manhole I 1 I LS 1 $ 1,300.00 $ 1,300.00 TOTAL 1$ 30,912.43 REASON FOR CHANGE after bid 9040 Addibonal Concrete Cost for Revised Mix Design 9041 Costs Incurred to excavate water vault lid and valve box, adjust grade and 8owfill 9042 lCosts incurred for the pump truck required to place the bike path underthe bridge I 90451Removed asohah to locate and raise MH in southbound Timberline Road I Posted to Pay Estimate No.7