HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (4)CHANGE ORDER NO. #15 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: stormwater inlet change & cutoff walls 1. Reason for change: revise inlet covers to stormwater standard. Install 2 cutoff walls, delete manhole 2. Description of Change: revise inlet covers to stormwater standard. Install 2 cutoff walls, delete manhole (CWR 17) 3. Change in Contract Cost: $2,938.00 4. Change in Contract Time: 0 days ORIGINAL CONTRACT COST $11,514,848.18 TOTAL APPROVED CHANGE ORDER ($43,366.33) TOTAL PENDING CHANGE ORDER ($176,105.08) TOTAL THIS CHANGE ORDER $2,938.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.03% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S -0.35% ADJUSTED CONTRACT COST 11,298,314.77 (Assuming all change orders approved) ACCEPTED BY: Contractor's Rep ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing DATE: 9 9-c4 DATE: �? 7 d-40 DATE: DATE: DATE: CHANGE IN WORK REQUEST "17" '�v W 15 Initiation Date: 6/22/2006 Project: Spring Canyon Community Park Owner. City of Fort Collins Parks & Recreation To: ECI Site Construction Mgmt Requested by: Ted Johnson Authorized by: Kathleen Benedict Please famish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount In accordance with a request from the Stormwater department dated June 14, 2006 from Ayres Associates 1). Install (2) cutoff walls on storm drain lines In the stormwater detention pond berm $3,360.00 2). Change inlet "P' per City detail 0-9A $1,2%00 3). Delete Manhole on Storm line "F" $ (1,632.00) TOTAL $2,938.00 ECI Site Construction Mgmt , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be no change by 0 Days. No change in Contract Sum (Init(al if no change) ADD to the Contract Sum $ 2,910.00 DEDUCT from the Contract Sum $ This information shall be valid for CONTRACTOR'S APPROVED BY OWNER: Accepted change in work requesADflMt'ibt lur hange order has been executed by. all parties. unless signed by the owner and the contractor. days from the date of signature below. DATE: 6/22/2006 copy gp(#.ipt�vpt]$ JVAL to thvner J' 14— DATE: i l2 OG zd n a "dare forma! change order. DO NOT bill for this change until a formal Acceptance is direction to proceed with the work described herein. Not valid AMM ASSOCIATES MEMORANDUM To: Russell Lee, BHA Design From: Eric Lessard, PE Date: June 14, 2006 Re: Inlet installation at Spring Canyon Community Park This memo is intended to provide instructions for the installation of an inlet and cut-off wall at the north end of the regional detention pond in Spring Canyon Community Park. Currently, the plans show a CDOT Type C inlet at the outlet with a 15" RCP Stormsewer delivering water to Spring Creek. Dan Mattson with the City of Fort Collins requested that a standard Fort Collins inlet be installed in order for spare grates to be readily available in case of theft. The attached standard area inlet was approved by Dan and was analyzed by Ayres Associates to ensure its suitability. Ayres Associates completed a hydraulic analysis and determined that the interception capacity of the grate matched the design discharge. Therefore, please install the inlet according to the detail drawing. Additionally, Dan indicated he wanted a cut-off wall to ensure no piping occurs. The requested cut-off wall is to be made of an impermeable clay layer. Please install the cut-off wall according to the construction drawing sheet number C4.9, detail 1. This detail shows a ditch crossing with a cut-off wall. The cut-off wall portion of the detail shall be implemented with clay material. Thank you. Enclosure cc: Dan Mattson Kathleen Benedict Jason Stutzman 3665 JFK Parkway, Building 2, Suite 200, P.O. Box 270460, Fort Collins, CO 80527 BHA6•MMO.DOC (970) 223-5556, FAX (970) 223-5578 32-0890.08 www.AyresAssociates.can Page 1 of 1 6 IN. IN. MIN. I /4 I AROUND I PIPET I II 1� I IiI 1 /4 IN. &ET GRATES LINE jl SLOPE FOR DRAINAGE Ih. SECTION A -A GENERAL NOTES: 1. AREA INLETS MAY BE USED FOR DRAINAGEWAY OTHER THAN STREETS. (EXAMPLE, PARKING LOTS. MEDIANDS, SUMP BASINS) RATE AND FRAME BY OR APPROVED EQUAL. 35 3/4 IN. 6 IN. 23 3/4 IN. J IN. CIR. O.F. 'p AR —CONCRETE 2 IN. CIR L.F. ly ...1 .$ . /4 9PIPE O.D. +r. 3 IN. CIR. O.F. 2 M. CIR L.F. ;;:../4 O 12 IN. ..''•. 12 IN. CTRS. (TYP.) /4 O 12 IN. . "LjjA�P% : 'CONCRETE PIPE CTRS. (TYP.) a /p= LII 1 STEP. MA%, li. ,�`• SPACING •t1r' r' : {hai 4 0 1 6 IN. TYPICAL WALLS AND FLOOR SECTION B-B AREA INLET CITY OF FORT COLLINE STORMWATER APPROVED: DETAIL UTILITIES CONSTRUCTION DETAIL DATE: 12/8/00 D - 9A Q DRAWN BY: NBJ