HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (2)09/28/2006 THU 13:03 FAX 970 221 6586 CITY OF FT COLLINS CLRS Q 001J002 PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO. DESCRIPTION: 1. Reason for change: CHANGE'-ORCi A NO. #19 SPRING CANYON COMMUNITY PARK . ECI 5952 6602274 Add Fire Line Service Service to the maintenance facility for fire line was left off original base bid documents 2. Description of Change: survey, mobilize utility crew, potholing & hand dig over new utility lines, C PVC water line 129, N' 22112 bend, 4' 90degree bend, excavate for N' tep & valve, 4" fire line riser, ECI 50/6 markup 3- Change in Contract Cost $20,370.00 4. Change in Contract Time: 2 days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER _ -- TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all change orders ACCEPTED BY: Contractor's Rep ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Engineering: APPROVED BY: Purchasing Agent over $30,000 City Clark Artdtitect CorNacw Engineer Project File Purchminp 511,3ti0 DATE: ;A/4W DATE: 4 a# W - OZ; DATE: DATE: DATE: 09/28/2006 THU 13:03 FAX 970 221 6586 CITY OF FT COLLINS CLRS IM002/002 CHANGE IN WORK REQUEST "37" initiation Date: 9/11/2006 n Project: Spring Canyon Community Park �tJ Owner: City Of Fort Collins Parks & Recreation To: ECI Site Construction Mgmt Requested by: Ted Johnson Authorized by: Kathleen Benedict Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date. Description of Proposed Changes - amount In response to RFI #47- Add 4" PVC Fire service line to Maintenance Building 1). Survey/ Layout/ as -built fire line water service 1 LS $ 675.00 2). Mobilization of utility crawl backfill crew 1 LS $ 2,400.00 3). Potholing/ Hand excavation over new utility lines 1 LS $ 2,600.00 4). 4" PVC waterline 120 LF a $33.00/ LF $ 3.960.00 5). 4" 221/2 bend 1 Fes, $ 215.00 6). 4" 90 degree bend 2 E4 $ 460.00 7). 4" Tap on main with Valve 1 LS $ 5.400.00 6). 4" Fire line with Haar 1LS $ 3,600.00 9). ECI 5% markup on cost $ 970.00 TOTAL $ 20j370.00 •� The Dricina above reflects 4' fin service as anoineered by the fire sprinkler contractor in lieu of 6" ECI site construction MQmt , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be Increased by 2 Days. No change in Contract Sum aniw ifno ehww) ADD to the Contract Sum S 20,970.00 DEDUCT from the Contract Sum S This information sball be valid for thirty (30) CONTRACTOR'S APPROVED BY OWNER: days from the date of signature below. DATE: 9/11/2006 DATE: Accepted change in work request %W/ be included in afuture formal change order. DO NOT bill for this change until a formal