Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5858 MISC. STREET IMPROVEMENTSAdministrative Services Purchasing Division City of Fort Collins September 25, 2006 Connell Resources, Inc. Attn: William T. Welch, Vice President 4305 E. Harmony Rd. Fort Collins, CO 80528 Re: Renewal, 5858 Miscellaneous Street Improvements Dear Mr. Welch: The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions with the following revisions: • Connell Resources 2006-2007 Materials pricing • Connell Resources Labor and Equipment Rates Effective February 1, 2006 • Revision of Section 601 Structural Concrete The term will be extended for one (1) additional year, July 1, 2006 through July 2, 2007, If the renewal is acceptable to your firm, please sign this letter in the space provided and return it to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO 85022, within the next fifteen days. If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non -renewal. Please contact John D. Stephen CPPO, CPPB, Senior Buyer, at (970) 221-6777 if you have questions. Sincerely, Ja es S. O'Neill II, CPPO, FNIGP ector of Purchasing and Risk Management Signature / • ► Date (Please indicate your desire to renew 5858 by signing this letter and returning it to Purchasing Division within the next fifteen days.) Encl: Connell Resources 2006-2007 Materials pricing Connell Resources Labor and Equipment Rates Effective February 1, 2006 Revision of Section 601 Structural Concrete JBO:cj 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 '4 r V i 0 CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2006 All Rates are per hour except as noted LABOR Straight Time Overtime Project Site Manager with Pickup $85.00 Supervisor with Pickup $70.00 Foreman - Pickup Truck with Tools $60.00 $80.00 Operator - Blade $40.00 $55.00 Operator - Lg Scraper,Loader, Dozer,Hoe $37.00 Operator - Sm Scraper,Loader, Dozer,Hoe $34.00 Operator - 815, Rex Compactors $34.00 Operator - Disk, Skid Steer $29.00 Operator - Paver, Screedman $40.00 $55.00 Operator - Paving Rollers, Sweeper $37.00 Laborer - Asphalt $32.00 Grade Checker $36.00 $48.00 Pipe Layer $30.00 Laborer $27.00 $37.00 Field Mechanic $39.00 Oiler $37.00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours per day during the week. All units listed above will be an additional $12.00 per hour for overtime. TRUCKS - Fueled, Operated & Maintained Tractorw/Low Boy $110.00 Tractor w/Rock Trailer $70.00 Tractor w/Flow Boy $70.00 Tractor w/Belly Dump $70.00 Tractor w/End Dump $70.00 Truck and Pup $70.00 Tandem Dump $60.00 Cat D35 Rock Truck $120.00 Cat 621 Rock Truck $120.00 Cat D25 Water Tanker $100.00 International Water Truck $85.00 GMC Water Truck $85.00 Overtime will be added to the above prices for Weekend, Holidays, and above 8 hours per day during the week. All units listed above will be an additional $12.00 per hour for overtime. c:lsherkipVabor,equlp rates 2006 REVISION OF SECTION 601 STRUCTURAL CONCRETE Section 601 of the Standard Specifications is hereby revised as follows: Subsection 601.01 is revised to include the following: This work shall consist of the construction of box culvert extensions, wing walls, parapet walls, and necessary conduits in accordance with the plans, specifications, and the Larimer County Urban Area Street Standards (Refer to detail drawing 11-0117). It shall be the City's responsibility to provide building plans and specifications. The Contractor is responsible for providing all materials and equipment necessary to meet the requirements of the Colorado Department of Transportation Standards and Larimer County Urban Area Street Standards. Mix Design : 1. Compressive Strength: 4000 psi at 28 days a. Minimum number of cylinders passing above requirement shall be 90%. b. Minimum strength of cylinder acceptable, 3800 psi. 2. Cement Content: 6 bags per cubic yard minimum 3. Maximum Permissible Water — Cement Ratio a. For 4000 psi strength, non air -entrained, absolute ratio by weight 0.49. b. For 4000 psi strength, air -entrained, absolute ratio by weight 0.45. 4. Slump: Four inch maximum. 5. Air Content: 6%+/- 1 Y:% for concrete with exposed surfaces or subject to freezing and thawing; not required for other concrete. The accepted quantities will be paid for at the contract unit price. Payment will be made under: Pay Item and Pay Unit The pay unit is denoted by (). 601-01 Structural Concrete - Cast in place — (CY) The above prices and payments shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all Work involved in a cast in place project, as shown on the plans, as specified in these specifications, and as directed by the Engineer. Bid 5858 Miscellaneous Contract Bid Tab 9/22/2006 Connell Resources 2006-07 item Number ]Description Quantity Unit I Unit Cost Total Cost 202-01 Remove pipe ADS-CMP-RCP-PVC-CLAY TILE 30 LF $5.551 $166.50 202-02 Plug Existing Pie 12"-36" 1 EA $155.831 $155.63 202-03 Remove Vertical Curb 137 LF $4.09 $560.33 202-04 Remove Roll Over Curb And Sidewalk. 100 LF $5.60 $560.00 202-05 Remove Cross anlDrivewa ! ron. 150 SF $2.35 352.50 202-06 Remove Concrete Paving8" Av Depth. 400 SF $2.45 $980.00 202-07 Remove Asphalt 8". 50 SY $5.26 $263.00 202-08 Roto Mill 3"-4" Asphalt. 100 SY $4.24 $424.00 202-09 Profile Mill 0-3". 600 SY $1.66 $996.00 202-10 Remove Sidewalk 4"-6". 403 SF $1.65 $664.95 202-12 Remove Ri Ra . 20 SY $1.65 $33.00 202-13 Remove Fence Various Types. 100 LF $2.24 $224.00 202-14 Saw Cutting ExistingAsphalt. 100 LF $1.75 $175.00 203-W Unclassified Excavation. 115 CY $4,83 $555.45 203-02 Embankment CIP). 75 CY $3.19 $239.25 203-03 Borrow Suitable Fill Material. 50 CY $13.29 $664.50 203-04 Haul Dispose, 65 CY $6.42 $417.30 203-05 Topsoil (Stripping, Stock ilin , Placing) 75 CY $10.53 $789.75 203-06 Muck Excavation (CIP). 50 CY $24.57 $1 228.50 203-07 Borrow ABC Class 5 or 8 (CIP). 50 Ton $13.84 $892.00 203-08 Borrow Fill R-25 50 CY $19.89 $994.50 203-09 Median Splash Block Shaping 500 SF $2.471 $1 235.00 203-10 Import Topsoil Screened 50 CY $42,441 $2122.00 203-11 Potholing 10 EA $255,361 $2 553.60 206-01 Structure Excavation, 50 CY $5.87 $293.50 206-02 Structure Backfill On Site Fill 50 CY $8.54 $332.00 206-03 Haul And Leveling 50 CY $15.19 $759.50 206-04 Structure Backfill Flow Fill 50 CY $611.50 $3 075.00 206-05 Filter material 1" 1/2 " washed rock 50 Ton $24.33 $121e.50 206-06 Dewaterin 15 Da $727.75 $10 916.25 208-02 Silt Fence Furnished And Installed 320 LF $37.69 $12 060.80 208-03 Straw Bales Furnished And Installed 10 LF $55.99 $559.90 208-04 Soil Retention Blanket 150 SY $4.33 $649.50 210-01 Adjust Valve Box 3 EA $222.50 $867.50 210-02 Adjust Manhole Ring/Cover 2 EAR$387.3i $774.62 210-03 Modi Manhole 2 FA $1,950.90 210-04 Relocate Fire H drant. 1 FA $1 161.29 210-05 Relocate Water Meter 1 FA $925.81 210-06 Relocate C.P. Test Station 1 FA $780.86 210-07 Ini ationService 3/4"-1" 2 EA $3734.20 210-08 Relocate Fence Various T s 100 LF $505.00 210-09 Relocate Mailbox rovide tem ora service 2 EA $665.74 304-01 Aggregate Base CL 5-6 CIP 8" 50 Ton $15.63 $781.50 304-02 Shouldering Base Class 5-6- 41n CIP 50 Ton $18.01 $900.50 304-03 Patch Placement Base CL-5-8 6" CIP 50 Ton $31.12 $1,556.00 306-01 Reconditioning 8" 50 SY $3.04 $152.00 403-01 Asphalt Patching Grading S 3" Depth) 3 Ton $115.48 $346.44 403-02 Asphalt Patching Grading SG 6"-10" De th 6 Ton $112.36 $674.16 403-03 Hot Bituminous Pavement - Grading S 3" Depth) 50 Ton $53.38 $2,669.00 403-04 Hot Bituminous Pavement - Grading SG 4" Depth) 50 Ton $50.26 $2,513.00 403-05 Asphalt Paver Leveling Course SG 25 Ton $50.28 $1 256.50 403-06 Asphalt Paver Patch Grading S 3" depth) 25 Ton $53.38 $1,334.50 412-01 Concrete Pavement 10" 75 SY $105.52 $7,914.00 412-02 Concrete Pavement 6" 175 SY $99.86 $17 440.50 420-01 Geotextile Stabilization Fabric 50 SY $5.62 $281.00 420-02 Geo-Grid Reinforcement 50 SY $9.35 $467.50 420-03 Geotextile Paving Fabric 50 SY $3,500.00 $3,500.00 506-01 Rip Rap vrith Type II Bedding, Topsoil -CIP 10 SY $57.66 $576.60 60 -01 Structural Concrete(including falsework 60 CY $445.35 $26 721.00 601-02 Structural Concrete Cold Weather Curing 1 EA $1,075.00 $1,075.00 602.02 1Reinforcein Steel (Epoxy Coated 16000 1 LBS 1 $1.351 $20 250.00 602-03 1 Reinforceing Steel 15000 1 LBS 1 $0.951 $14.250.00 603-01 12" CMP 27 L1 $33.591 $906.93 603-02 12" CMP FES 2, Ea $157.361 $314.72 603-03 24" CMP 30 EA $45.24 $1 357.20 803-04 24" CMP FES 2 LF $247.34 $494.68 603-05 12" Class III RCP 30 LF $34.12 $1,023.60 603-06 W' Class III RCP 30 LF $38.00 $1,140.00 803 07 18" Class III RCP 30 LF $41.99 $1,259.70 803-08 21" Class III RCP 30 LF $52.02 $1 580.80 603-09 24" Class III RCP 80 LF $60.061 $4,804.80 603-10 27" Class III RCP 30 LF $68.811 $2,064.30 603-11 30" Class III RCP 30 LF $75.901 $2 277.00 603.12 36" Class III RCP 30 LF $84.541 $2 536.20 603-13 42"Class III RCP 30 LF 115.651 $3 469.50 603-14 12 RCP Class III FES 2 EA $542.481 $1,084.96 603-15 15" RCP Class III FES 2 EA $542.481 $1,084.9e 603-18 18" RCP Class III FES 2 EAR$72 $1 208.64 603-17 21" RCP Class III FES 2 EA $1,439.64 603-18 24" RCP Class III FES 2 EA $1 439.64 803 19 27" RCP Class III FES 2 EA $1 717.30 603-20 30" RCP Class III FES 2 EA $1,717.30 603-21 36" RCP Class III FES 2 EA $2 524.64 603-22 42" RCP Class III FES 2 EA 5 $2 711.30 603.23 24"x 38" RCP 30 LF2 $3150.60 603-24 24"x 38" RCP- FES 2 EA $726.82 $1 453.64 603-25 14" x23" RCP 30 LF $84.86 $1,945.80 603-26 14"x 23" RCP FES 2 EA $552.98 $1,105.96 603-27 Trash Rack 2 EA $679.14 $1 358.28 603-28 15" ADS N-12 30 LF $31.51 $945.30 603-29 WADS FES 2 EA $245.65 $491.30 603-30 18" ADS Pi N-12 30 LF $34.26 $1 027.80 803-31 18" ADS FES 2 EA $245.65 $491.30 803-32 24" ADS Pl N-12 30 LF $44.79 $1 343.70 606-33 24" ADS FES 2 EA $288.15 $576.30 603.34 36" ADS Pipe N-12 30 LF $71.45 $2 143.50 603-35 36" ADS FES 2 EA $515.65 $1 031.30 603-36 4" PVC Irrigation Pie SCH-200 30 LF $20.85 $625.50 603-37 4" Sanitary Sewer Service SDR-35 30 LF $25.14 $754.20 603-38 6" Pvc Sanitary Sewer 30 LF $25.13 $753.90 603-39 8" Pvc Sanitary Sewer SDR-35 30 LF $32.14 $964.20 603-40 Concrete Encasement 20 LF $73.88 $1 477.60 603-41 Concrete Cut Off Walls ditch crossing) 2 EA $2 275.00 $4 550.00 603-42 Pipe Headwall 2 EA $2 858.33 $5 716.86 603-43 4" Median Underdrain Pipe Perforated 30 LF $19A1 $582,30 603-44 4" Median Underdrain Pipe Solid 30 LF $19.79 $593.70 603-45 4" Clean Out 2 EA $387.03 $774.06 604-01 Type 3 Single Inlet 2 EA $2,630.95 $5 261.90 604-02 Type 3 Double Inlet 2 EA 1$3,923.151 $7,846.30 e40-03 5' Type R Inlet 2 EA $2 861.42 $5 722.84 604-04 IV Type R Inlet 2 EA $3 703.70 $7 407.40 604-05 15'Type R Inlet 2 EA $4 282.60 $8 565.20 604-06 Combinatlon Tvpe 131nlet 2 EA $2,855.33 $5 710.66 604-07 COFC Single Inlet Area Inlet 2 EA $2,633.69 $5,267.38 604-08 4' Diameter Manhole 2 EA $1,610.88 $3,221.76 804-09 6 Diameter Manhole 2 EA $2,368.72 $4 737.44 604-10 5' Diameter Manhole Drop 2 EA $2 808.49 $5 616.98 604-11 6' Diameter Manhole 2 EA 1$2,919.351 $5,838.70 607-01 Temporary Fence- Corral Fence 100 LF $23.33 $2 333.00 607-02 Temp Fence- Corral Panel + screen 100 LF $29.17 $2,917.00 607-03 Privacy Fence 8' Cedar 100 LF $23.16 $2,316.00 607-04 Privacy Fence 6' Cedar 100 LF $18.37 $1,837.00 607-05 2 Rail Split 100 LF $17.50 $1,750.00 607-06 3 Railed Dowel Fence 100 LF $21.00 $2,100.00 607-07 4 Strand Barb Wire 100 LF $8.17 $817.00 607-08 Orange Safety Fence 100 LF $3.14 $314.00 808-01 Concrete Sidewalk 4" 500 SF $4.22 $2,110.00 808-02 Concrete Sidewalk 6" 935 SF $5.02 $4 693.70 80,8-03 Concrete Access Ramps with Colored Landings 6" 36 SF $10.91 $392.76 608-04 Concrete Drive Approach 6" 250 SF $7.82 $1 955.00 608-05 Drive Over Curb+Sidewalk 6" 200 SF $9.31 $1 862.00 608-O6 Concrete Cross ans+A ons 10" 390 SF $12.37 $4,824.30 608-07 Concrete Trickle Pan 4ft Wide 6" Thick 760 SF $5.48 $4,164.80 608-08 Colored Concrete Bike Path 5" Fibermesh And Colored Yosemite Brown 1000 SF $7.99 $7 990.00 008-09 Bus Stop Pad 6" Flat Work 500 SF $6.911 $3,455.00 608-10 Pedestrian Refuge Islands 100 SF $10.91 $1,091.00 608-11 HI-Eafly Concrete 24hr 25 C $47.83 $1,195.75 808-12 Flow Fill 50 C $62.88 $3,134.00 609-01 Remove and Replace Concrete Curb and Gutter match existing) 100 LF $40.25 $4 025.00 609-02 Vertical Curb+Gutter 30" 66 LF $25.06 $1 653.96 809.03 Ouffall Curb+Gutter 18" 50 LF $24.73 $1 236.50 4 Rollover Curb+Gutter 50 LF $24.78 $1,239.00 1 Drivewa Curb Cuts 4 EA $237.42 $949.68 As halt Curb 150 LF $8.14 $1,221.00 1 Ex osed A re ate Concrete Hardsca a Medians 4" 250 SF $11.05 $2782.50 Patterned Concrete Stam ed 250 SF $13.44 $3 380.00 3 Interlockin Sidewalk Pavers-T 1 250 SF $15.63 $3907.50 M 1 6" DIP Class 52 And Pol Wra 30 LF $36,44 $1 093.20 6"x6"Tee 1 EA $316.29 $316.29 3 8"x6" Cross 1 EA $372.29 $372.29 4 6" 45" Bend 1 EA $287.29 $267.29 5 6" Gate Valve And Box 1 EA $853.37 $853.37 t 6" Me a Lu s Restraints 2 EA $129.86 $259.72 7 6"x2"Blow Off 1 EA $1,439.86 $1439.86 619-08 8" DIP Class 52 And Ploy Wrap 30 LF $41,93 $1 257.90 619-09 8'W" Tee 1 EA $395.16 $395.16 619-10 8"x8" Cross 1 EA $407.70 $407.70 619.11 8" 45 " Bend 1 EA $305.32 $305.32 610-12 8x2"Blow Off 1 EA $1521.53 $1521.53 619-13 8" PVC C-900 30 LF $33.19 $995.70 619-14 8" Gate Valve And Box 1 EA $1,199.87 $1 199.87 619-15 8" M a Lugs Restraints 2 EA $157.57 $315.14 619-16 8"x2"Blow Off 1 EA $1.521.53 $1521.53 619-17 Fire Hydrant 1 EA $2 560.92 $2 560.92 619-18 6" Flre Hydrant Extension 1 EA $199.31 $199.31 619-19 12" Fire Hydrant Extension 1 EA $673.86 $673.88 819-20 3/4" Copper Pie 30 LF $25.94 $778.20 619-21 3/4" Corp Stop 1 EA $194.48 $194.48 819-22 3/4" Curb Stop 1 EA $240.27 $240.27 819-23 3/4" Meter Pit with 314" Yoke 1 FA $731.38 $731.38 619-24 1"CopperPi 30 LF $33.82 $1014.60 819-25 1" Corp Stop 1 FJ�$209.84 $209.64 819 26 1" Curb Stop1 EA $272 $271.77 819 27 1" Meter Pit with 3/4" Yoke 1 I i A 1 $579.191 $579,19 819-28 1" Air Vac Assembly 1 I EA 1 $3,860.301 $3 860.30 Protect Manaaement Fees and Mobilization Costs 4000 Estimating 1 HR 4002 Project Management 1 HR 4004 GPS Survey 1 HR 5000 Mobilization 0-5 miles 1 EA 5002 Mobilization 6-10 miles 1 EA 5004 Mobilization 11-15 miles 1 EA 5006 Mobilization 15+ miles 1 EA Project management fees will be determined when scoping the Notes: miscellaneous project with Connell Resources, Inc. Mobilization will be charged for each project. Multiple mobilization charges may apply and should be determined when scoping the project with Connell Resources, Inc. 601-01: Masonry work/brick ledge and handrails/embeds excluded in structural concrete 601-02: Assumes a8 work to be heated for three days/placement. If multiple pours are required, multiple cold weather curings will be required. TOTAL 1 $395,375.14 $55.53 $55.53 $76.19 $1,056.94 $1,409.26 $2,113.89 $3,171.15 See also: Connell Resources, Inc.'s "Contractor Time and Material Labor and Equipment Rates for 2006" CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL • LABOR AND EQUIPMENT RATES Effective February 1, 2006 All Rates are per hour except as noted GRADING EQUIPMENT - Fueled & Maintained Scraper 615C $110.00 Scraper 631 E $160.00 Scraper 627E $170.00 Scraper 623F $160.00 Scraper 621 E $160.00 Scraper 613E $100.00 Scraper 613C $100.00 Blade 14OG $85.00 Blade 140H $85.00 Blade 14H $110.00 Road Reclaimer -Dirt $130.00 Road Reciaimer - Asphalt $180.00 980 Loader $125.00 972 Loader $110.00 970 Loader $110.00 966 Loader $11.0.00 950 Loader $90.00 938 Loader $90.00 936 Loader $90.00 IT 28 Loader $90.00 John Deere 8650 with Disk $80.00 John Deere Landscape Loader $60.00 Skid Steer $37.00 D-9 Cat Dozer $170.00 D-8 Cat Dozer w/rippers $145.00 D-6 Cat Dozer $90.00 D-5 Cat Dozer $80.00 D-4 Cat Dozer $70.00 D-3 Cat Dozer $60.00 ASV 4810 Track Dozer $45.00 EXCAVATION EQUIPMENT - Fueled & Maintained Komatsu PC600 $155.00 Komatsu PC400 $135.00 Komatsu PC300 $115.00 Komatsu PC220 $85.00 Komatsu PC200 $85.00 Komatsu PC150 $75.00 Komatsu PC200 W/Hammer $115.00 Cat 350 Excavator $135.00 Rock $210.00 $185.00 cAsherRclpUabor,equip rates 2006 • • 0 CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2006 All Rates are per hour except as noted Cat 330 Excavator $115.00 Cat 325 Excavator $105.00 Cat M318 Wheel Excavator $85.00 Cat 436 Backhoe $65.00 Cat 426 Backhoe $65.00 Cat 416 Backhoe $65.00 PUMPS 3" $30.00 4" $35.00 5" $40.00 10" $55.00 PAVING EQUIPMENT - Fueled & Maintained Paving Machine Cat AP1055B $140.00 Paving Machine LeeBoy 8500 $75.00 Paving Machine Blew Knox 4410 $115.00 GlIcrest 813 Pro Paver $65.00 Roadtec RX700 Profiler $500.00 CS 8200 Profilograph $75.00 Power Curber 150 $80.00 Johnson Street Sweeper $90.00 Crew Truck & Tools $200.00 Day Spray Rig $160.00 Day Tractor w/Spreader Bar $300.00 Day Tack $3.00 Gal ROLLER EQUIPMENT - Fueled & Maintained 815B Sheepsfoot Compactor $116.00 Ing Rand 122FB Compactor $90.00 Rex 3-35 Compactor $85.00 Dynapac CA151 Vibratory Roller $65.00 Dynapac CA151 Compactor $65.00 Cat CP323 Compactor $50.00 Cat CP434 Smooth Drum $65.00 Cat CB 334E $45.00 Cat CB 224C $35.00 Cat CB 225E $30.00 Hypac 530A Rubber Roller $45.00 Hyster C766 Roller $70.00 Dynapac Roller,CC21,CC101,CC122 $37.00 Ing Rand DD32 Asphalt Roller $37.00 c:lsherllcipllabor,equlp rates 2006 • CONNELL RESOURCES, INC. CONTRACTORS TIME AND MATERIAL LABOR AND EQUIPMENT RATES Effective February 1, 2006 All Rates are per hour except as noted MISCELLANEOUS Broom $35.00 Asphalt Saw $65.00 Compressor & Tools $280.00 Day Plckup Truck & Tools $14:00 Fuel Truck $70.00 cAsherl\cip\labor,equlp rates 2006