Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARKSEP-29-2006 FRI 02:11 PM CFC ENG, FAX N0, 9702216378 P. 01 J' CHANGE ORDER NO. #11 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: Horestooth Cross Pan 1. Reason for change: Existing cross pan on south side of Horsetooth was cracked and broken 2. Description of Change: sawcut 261f of asphalt @2.3011f, demo asphalt 15 sy, 5"asphalt patch, reprocess subgrade 15 sy, demo & haul off pan 156sf, subgrade & regrade for concrete, V' concrete pan (2 pours) 3. Change in Contract Cost: $6,879.13 4. Change in Contract Time: 0 days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL. CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST orders ACCEPTED BY: -- Contractor's Representative ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Engineering: APPROVED FlY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor rnglneer Project File Purchasing -1.82% 11,3 4, .90 DATE: 7 'zo zee DATE: %' �&.a DATE: DATE: 9- C - l `ate DATE: SEP-29-2006 FRI 02:11 PM CFO ENG. FAX NO, 9702216378 P. 02 CHANGE IN WORK REQUEST 6636- �Ilv Initiation Date: 9/712006 Project: Spring Canyon Community Parts Owner: City of Fort Collins Parks & Recreation To: ECI Site Construction Mgmt Requested by: Ted Johnson Authorized by: Kathleen Benedict Please furnish change in contract sum for the change in work described below. Do not order material or start any work until approval is received, livery effort will be made to incorporate this change into the work without affecting the contract date, Description of Proposed Changes - amount As requested by the City. ECI and Connell propose to do the following work along Horsetooth Road Asphalt Removal and Replacement 1). Sawcut asphalt 26LF @ $2.30/1-F $ 59,80 2). Demo asphalt with Hoe, hauloff and discpose 15 SY $ 907.50 3). 6" Asphalt patch- small area, re -process the subgrade 12" - Connell 15 SY $ 3,465.00 Concrete Crosspan Removal and Replacement 1). Demo and hauloff to dump broken concrete pan 156SF $ 909.05 2). Subgrade/ re -grade for new concrete $ 390.24 2). Pour back 8" thick concrete pan 26'x6' (2 separate pours for vehicular access) $ 1,147.54 TOTAL $ 6,879.13 U'r Sift construction Mgmt , agrees to change the work described above for the change in price, shown below. I have attached a breakdown which lists all COOS of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the CAmtract Sum or Contract Time. The C'.onlract'I'imc will be Unchanged by 0 Days. No change in CAmtraet Sun? (Initial it no change) ADD to the Contract Sum $ 6,879.13 DFDUCr from the Contract Sum $ This information shall be valid for CONTRACTOR'S SIGNA APPROVED BY OWNFR: from the date of signature below. 91V2006 DATE: Accepted change in work request Will be inchided in a future formal change order, DO NOT bill for this change until a formal thunge order has been execvrted by all parties. Acceptance is direction to proceed with the work described herein. Not valid