HomeMy WebLinkAboutAddendum 1 - BID - 10228 Cathodic Protection Renewal - Water Treatment Facility Deep Well Anode BedsAddendum # 1 10228 Page 1 of 4 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 10228: Cathodic Protection Renewal - WTF Deep Well Anodes Project OPENING DATE: 3:00 PM (Our Clock) October 28, 2025 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Exhibit 2 – Preproposal Powerpoint .pdf Please contact Jake Rector, Purchasing Manager, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 fcgov.com/purchasing Addendum # 1 10228 Page 2 of 4 EXHIBIT 1 Questions and Answers 1. Section 03 35 00 – Part 2.2B: Would you consider Quadex Hyperform as an approved equal trawlable cementitious repair mortar for this project? A: Evaluation of approved equal alternatives to specified materials will not be conducted at this time. This product can be submitted for review by the Engineer and City after contract execution for potential acceptance and use on the project. 2. Can you provide pictures of the current anode wells? A: Yes. Below are pictures from the construction of the existing wells in 2013 and current pictures of the wells. East Well Completion – Construction 2013 West Well Completion – Construction 2013 West Well from Surface – Construction 2013 West Well Interior - current Addendum # 1 10228 Page 3 of 4 West Well Pad with Junction Box - current 3. What are the current anodes made of? A: The existing anodes in both east and west deep wells are high silicone cast iron type anodes. These anodes will be abandoned as part of the Work. 4. What is the current output of the rectifiers? A: The east rectifier’s output on September 24, 2025: 23.17 volts and 12.10 amps. The west rectifier’s output on September 24, 2025: 17.25 volts and 10.50 amps. 5. Will Fort Collins receive & store the palletized materials? Section 01 65 00 part 1 says we're to receive them ourselves but that will require extra mobilizations to the site. For similar jobs such as our current deep-well installation at Lincoln Electric in Nebraska, they have received and stored the pallets and sent us photos so we can confirm items are showing up and we can confirm remotely that they are correct. I believe everything could be offloaded at the laydown/staging area and kept outside. A: The materials can be delivered to the staging area within the Fort Collins WTF. Deliveries will need to be coordinated with the WTF point of contact and Fort Collins Project Manager. The selected Contractor will be responsible for ensuring that the materials delivered are correct, free of damage, and stored properly while on City property. 6. On the drawings, pg 9. They show the entire work areas being surrounded by sediment control logs or straw wattles, but the notes only indicate we're to place the coir matting around the east well. I assume the SCLs are already in place? I wouldn't expect much run off as the driller generally digs a small pit for the cuttings. (we'll be putting drill spoils into roll offs with plastic barriers) I would think placing SCL around his dirt pile to make that pit would make sense. Addendum # 1 10228 Page 4 of 4 A: Modifications to the designed erosion control plan are at the discretion of the Contractor as it will be the Contractor’s responsibility to manage erosion and runoff to meet applicable permits. Modifications to the erosion control plan shall be reviewed and accepted by the City’s erosion control staff prior to implementation. Pre-BID Conference Jake Rector & Taylor Scott 10228 –Cathodic Protection Renewal-Water Treatment Facility Deep Well Anodes Project October 8, 2025 10228 Cathodic Protection Renewal –WTF Deep Well Anodes Introductions Jake Rector – Purchasing Manager Taylor Scott – Special Projects Manager Nick Humphries – HDR Project Manager -Please enter Name, Company and Email in Chat Line ITB Schedule Review ITB Issued – September 26, 2025 Pre-BID Conference – 1:00PM MT October 8, 2025 Question Deadline – 3:00PM MT October 13, 2025 BID Opening – 3:00PM MT October 28, 2025 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Agenda •Project Background •Scope of Work •Bid Requirements •Bid Schedule •Qualifications •Subcontractors •Proposed schedule •Questions 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Project Goals •Protect critical underground water infrastructure at the WTF •Replace depleted anodes and existing wells •Install a long-term solution for protection of the WTF •Complete the work safely Project Scope of Work •Abandon two existing deep well anode beds •Install two new deep well anode beds with new anodes •Connect anodes to existing infrastructure •Restore the site to preconstruction conditions 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Fort Collins Water Treatment Facility – Impressed Current System Laporte Ave Existing East Anode GB Existing West Anode GB FC WTF Both Existing GBs •320 ft deep •10 in PVC casing •30 ft deep grout seal •70 ft clay •200 ft active column •Installed in 2013 Existing Rectifiers 10228 Cathodic Protection Renewal – WTF Deep Well Anodes New Deep Anode Wells •Near existing wells - potholing •Utilize existing junction boxes and rectifiers •Includes drilling well, concrete pad, anodes, well backfill, wiring at junction box, bollards, caps, and other items •290 ft deep wells •Log electrical resistivity using test anode •12 anodes each after logging •90 ft active column; 206 ft active column •West Anode Well: junction box, vent pipe in single pad with well •East Anode Well: junction box and vent pipe on separate pad (use existing) Vent Piping •Perforated vertical vent piping within well •Solid piping outside of well, connecting to junction box padding 10228 Cathodic Protection Renewal – WTF Deep Well Anodes WTF Contractor Requirements 1.City Point of Contact assignment 2.City Excavation Permit at least 48 hours prior to any excavation or potholing to POC 3.Agree on set working days and hours 4.Site access through southern contractor gate, no building or bathroom access 5.Safety is paramount, must meet all WTF requirements – OSHA, Stop Work 6.Chlorine Evacuation Training 7.Environmental Management System – spills, leaks, and proper disposal of materials 8.May access water from fire hydrants – must request via City POC 11.Plant Speed Limits – 15 mph 12.Valves and electrical components shall only be operated by City staff 13.Staging area designated on drawings for parking and laydown 10228 Cathodic Protection Renewal – WTF Deep Well Anodes BID Requirements 9 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Section 00300 BID Schedule •Basis of award is the low responsive and responsible Bidder based on the total price for the Base Bid or the total price for the Base Bid plus selected Alternates. •This Bid Schedule has been uploaded to RMEPS in Excel format. Item No.Description Quantity Unit 1.00 General Cost of Construction 1.01 General Contract Requirements, Bonds, Insurance, Profit & Overhead 1 LS 1.02 Mobilization & Demobilization 1 LS 1.03 Permits 1 LS 1.04 Erosion and Sediment Control 1 LS 2.00 Deep Anode Well Replacement 2.01 Existing Well Abandonment 2 EA 2.02 East Deep Anode Bed 1 LS 2.03 West Deep Anode Bed 1 LS 2.04 2” Perforated Vent Pipe 600 LF 2.05 2” Solid Pipe 93 LF 2.06 Site Restoration 30,900 SQFT 10 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Section 00420 - Minimum Qualifications •Complete Statement of Bidder’ Qualifications •Provide three completed deep well anode projects in the past 5 years •Previous experience with wells 100 ft or deeper •Knowledge and understanding of deep well anode projects •Client/reference contact information •History of on time and in budget projects Section 00430 – Subcontractors 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Colorado Open Records Act (CORA) C.R.S. §§24-72-200.1 et seq. -Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. -Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” -Such statement does not necessarily exempt such documentation from public disclosure if awarded the project as all provisions of any contract resulting from this request for proposal will be public information. 10228 Cathodic Protection Renewal – WTF Deep Well Anodes Questions? Please send to Jake Rector at jrector@fcgov.com ITB Schedule Review ITB Issued – September 26, 2025 Pre-BID Conference – 1:00PM MT October 8, 2025 Question Deadline – 3:00PM MT October 13, 2025 BID Opening – 3:00PM MT October 28, 2025