ADDENDUM NO. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of BID 10228: Cathodic Protection Renewal - WTF Deep Well Anodes Project
OPENING DATE: 3:00 PM (Our Clock) October 28, 2025
To all prospective bidders under the specifications and contract documents described above, the
following changes/additions are hereby made and detailed in the following sections of this
addendum:
Exhibit 1 – Questions and Answers
Exhibit 2 – Preproposal Powerpoint .pdf
Please contact Jake Rector, Purchasing Manager, at (970) 221-6776 or jrector@fcgov.com with
any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID OR QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
fcgov.com/purchasing
Addendum # 1
10228 Page 2 of 4
EXHIBIT 1
Questions and Answers
1. Section 03 35 00 – Part 2.2B: Would you consider Quadex Hyperform as an
approved equal trawlable cementitious repair mortar for this project?
A: Evaluation of approved equal alternatives to specified materials will not be
conducted at this time. This product can be submitted for review by the Engineer
and City after contract execution for potential acceptance and use on the project.
2. Can you provide pictures of the current anode wells?
A: Yes. Below are pictures from the construction of the existing wells in 2013 and current
pictures of the wells.
East Well Completion – Construction
2013
West Well Completion – Construction 2013
West Well from Surface – Construction
2013
West Well Interior - current
Addendum # 1
10228 Page 3 of 4
West Well Pad with Junction Box -
current
3. What are the current anodes made of?
A: The existing anodes in both east and west deep wells are high silicone cast iron type
anodes. These anodes will be abandoned as part of the Work.
4. What is the current output of the rectifiers?
A: The east rectifier’s output on September 24, 2025: 23.17 volts and 12.10 amps.
The west rectifier’s output on September 24, 2025: 17.25 volts and 10.50 amps.
5. Will Fort Collins receive & store the palletized materials? Section 01 65 00 part 1 says
we're to receive them ourselves but that will require extra mobilizations to the site. For
similar jobs such as our current deep-well installation at Lincoln Electric in Nebraska, they
have received and stored the pallets and sent us photos so we can confirm items are
showing up and we can confirm remotely that they are correct. I believe everything could
be offloaded at the laydown/staging area and kept outside.
A: The materials can be delivered to the staging area within the Fort Collins WTF.
Deliveries will need to be coordinated with the WTF point of contact and Fort Collins
Project Manager. The selected Contractor will be responsible for ensuring that the
materials delivered are correct, free of damage, and stored properly while on City property.
6. On the drawings, pg 9. They show the entire work areas being surrounded by sediment
control logs or straw wattles, but the notes only indicate we're to place the coir matting
around the east well. I assume the SCLs are already in place? I wouldn't expect much run
off as the driller generally digs a small pit for the cuttings. (we'll be putting drill spoils into
roll offs with plastic barriers) I would think placing SCL around his dirt pile to make that pit
would make sense.
Addendum # 1
10228 Page 4 of 4
A: Modifications to the designed erosion control plan are at the discretion of the Contractor
as it will be the Contractor’s responsibility to manage erosion and runoff to meet applicable
permits. Modifications to the erosion control plan shall be reviewed and accepted by the
City’s erosion control staff prior to implementation.
Pre-BID Conference
Jake Rector & Taylor Scott
10228 –Cathodic
Protection
Renewal-Water
Treatment Facility
Deep Well Anodes
Project
October 8, 2025
10228 Cathodic Protection Renewal –WTF Deep Well Anodes
Introductions
Jake Rector – Purchasing Manager
Taylor Scott – Special Projects Manager
Nick Humphries – HDR Project Manager
-Please enter Name, Company and Email in Chat Line
ITB Schedule Review
ITB Issued – September 26, 2025
Pre-BID Conference – 1:00PM MT October 8, 2025
Question Deadline – 3:00PM MT October 13, 2025
BID Opening – 3:00PM MT October 28, 2025
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Agenda
•Project Background
•Scope of Work
•Bid Requirements
•Bid Schedule
•Qualifications
•Subcontractors
•Proposed schedule
•Questions
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Project Goals
•Protect critical underground water infrastructure
at the WTF
•Replace depleted anodes and existing wells
•Install a long-term solution for protection of the
WTF
•Complete the work safely
Project Scope of Work
•Abandon two existing deep well anode beds
•Install two new deep well anode beds with new
anodes
•Connect anodes to existing infrastructure
•Restore the site to preconstruction conditions
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Fort Collins Water Treatment Facility – Impressed Current System
Laporte Ave
Existing East Anode GB
Existing West Anode GB
FC WTF
Both Existing GBs
•320 ft deep
•10 in PVC casing
•30 ft deep grout seal
•70 ft clay
•200 ft active column
•Installed in 2013
Existing Rectifiers
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
New Deep Anode Wells
•Near existing wells - potholing
•Utilize existing junction boxes and rectifiers
•Includes drilling well, concrete pad, anodes,
well backfill, wiring at junction box, bollards,
caps, and other items
•290 ft deep wells
•Log electrical resistivity using test anode
•12 anodes each after logging
•90 ft active column; 206 ft active column
•West Anode Well: junction box, vent pipe in
single pad with well
•East Anode Well: junction box and vent pipe
on separate pad (use existing)
Vent Piping
•Perforated vertical vent piping within well
•Solid piping outside of well, connecting to
junction box padding
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
WTF Contractor Requirements
1.City Point of Contact assignment
2.City Excavation Permit at least 48 hours prior to any excavation or potholing to
POC
3.Agree on set working days and hours
4.Site access through southern contractor gate, no building or bathroom access
5.Safety is paramount, must meet all WTF requirements – OSHA, Stop Work
6.Chlorine Evacuation Training
7.Environmental Management System – spills, leaks, and proper disposal of
materials
8.May access water from fire hydrants – must request via City POC
11.Plant Speed Limits – 15 mph
12.Valves and electrical components shall only be operated by City staff
13.Staging area designated on drawings for parking and laydown
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
BID Requirements
9
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Section 00300 BID Schedule
•Basis of award is the low responsive and responsible Bidder based on the total
price for the Base Bid or the total price for the Base Bid plus selected Alternates.
•This Bid Schedule has been uploaded to RMEPS in Excel format.
Item No.Description Quantity Unit
1.00 General Cost of Construction
1.01 General Contract Requirements, Bonds,
Insurance, Profit & Overhead 1 LS
1.02 Mobilization & Demobilization 1 LS
1.03 Permits 1 LS
1.04 Erosion and Sediment Control 1 LS
2.00 Deep Anode Well Replacement
2.01 Existing Well Abandonment 2 EA
2.02 East Deep Anode Bed 1 LS
2.03 West Deep Anode Bed 1 LS
2.04 2” Perforated Vent Pipe 600 LF
2.05 2” Solid Pipe 93 LF
2.06 Site Restoration 30,900 SQFT
10
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Section 00420 - Minimum Qualifications
•Complete Statement of Bidder’ Qualifications
•Provide three completed deep well anode projects in the past 5 years
•Previous experience with wells 100 ft or deeper
•Knowledge and understanding of deep well anode projects
•Client/reference contact information
•History of on time and in budget projects
Section 00430 – Subcontractors
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Colorado Open Records Act (CORA) C.R.S. §§24-72-200.1 et seq.
-Any proposals submitted hereunder are subject to public disclosure by the City
pursuant to CORA and City ordinances.
-Vendors may submit one (1) additional complete proposal clearly marked “FOR
PUBLIC VIEWING.”
-Such statement does not necessarily exempt such documentation from
public disclosure if awarded the project as all provisions of any contract resulting
from this request for proposal will be public information.
10228 Cathodic Protection Renewal – WTF Deep Well Anodes
Questions?
Please send to Jake Rector at jrector@fcgov.com
ITB Schedule Review
ITB Issued – September 26, 2025
Pre-BID Conference – 1:00PM MT October 8, 2025
Question Deadline – 3:00PM MT October 13, 2025
BID Opening – 3:00PM MT October 28, 2025