Loading...
HomeMy WebLinkAboutAddendum 1 - RFP - 10215 Independent Cost Estimating ServicesAddendum # 1 10215 Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP 10215: Independent Cost Estimating Services OPENING DATE: 3:00 PM (Our Clock) October 8, 2025 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers Please contact Jake Rector, Purchasing Manager, at (970) 221-6776 or jrector@fcgov.com with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE PROPOSAL STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 fcgov.com/purchasing Addendum # 1 10215 Page 2 of 2 EXHIBIT 1 QUESTIONS AND ANSWERS 1. Scope of Submission: The RFP requests a “previously completed cost estimate submittal” for another utility organization. Does this requirement mean the entire original document must be provided, or would a representative portion (such as key sections or summaries) be sufficient? If a portion is acceptable, could you please clarify which components are considered the minimum required? A: That is to the discretion of the respondent to this RFP, however, a representative portion with key sections and summaries would be accepted. The key sections and summaries would include a brief summary of the project and delivery method, methodology of providing the cost estimates for the project, and how those estimates are presented. This portion of a previous cost estimation should include, as many as possible, the components outlined in Section II.A while demonstrating the breadth of service the respondent can provide. 2. Page Count: The RFP limits the total proposal to a maximum of fifty (50) 8½ x 11” pages (excluding cover pages, table of contents, dividers, and the Acknowledgement form). Should the cost estimate submittal provided under Section C.2 be counted toward this 50- page maximum, or is it excluded from the page limit? A: The sample will be counted towards the 50 page maximum.