RFP 10195
Page 1 of 1
ADDENDUM NO. 1
CONTRACT DOCUMENTS
RFP 10195 Organizational Design and Implementation Services for Utilities and IT
Proposal Due Date: 3:00 PM (Our Clock) August 6, 2025
To all prospective proposers under the contract documents described above, the following
changes/additions are hereby made and detailed in the following sections of this addendum:
Exhibit 1 - Questions & Answers
Exhibit 2 - Organizational Chart
Exhibit 3 - Technology Plan Report
Please contact JD McCune, Senior Buyer, at jmccune@fcgov.com with any questions regarding
this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE RFP STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.
Financial Services
Purchasing Division
nd Floor
970.221.6775
970.221.6707
fcgov.com/purchasing
Exhibit 1
Questions and Answers
1. Are we able to use font sizes smaller than 10pt for headers, footers, charts, graphics,
and other elements apart from the main body text of the proposal as long as the text is
legible?
a. The City prefers that all font be no smaller than 10pt per the RFP requirements.
2. Does all of the text in our proposal need to be Arial or just the main body font of the
proposal?
a. The main body must be Arial and the City would prefer, if possible, all text be in
Arial but will not negatively impact the evaluation score if fonts differ.
3. Can the header and footers be outside of the margin requirement?
a. Yes.
4. What is the structure of IT Department(s) for the City and utility? Please provide current
utility IT/OT organizational structure with key responsibilities and relationship of those
positions to the rest of the City’s IT, TMO, and EPMO staff.
a. See attachment 1
5. Can the City please confirm Deliverable 2? Target Organization Report will focus on the
utility IT/OT structure specifically, recognizing that interdepartmental coordination, based
on the relationship between utility IT/OT positions/responsibilities and Citywide IT/OT
positions/responsibilities, will be a component of the analysis.
a. Yes
6. Can the City please further describe what is meant in Section 3 by “augment” and what
level of effort is envisioned for Section 3?
a. Looking for a firm who has the ability to fill various technology roadmap project
roles once organizational changes have been implemented as well as aiding in
the implementation of organizational changes. Could include implementation
services and/or various staff augmentation work (such as analysts, engineers,
project managers…)
7. Can the City please share the March 2025 City Utilities Technology Roadmap for
respondents to gauge the complexities of the IT Integration Organizational Design and
Implementation Services?
a. See Attachment 2
8. Can the City please share its budget for this project?
a. The City does not share budgetary project estimates.
9. On page 7 under as-needed support, the City requests potential augmented support for
quality assurance. Can the city provide additional context as to the nature of the
possible quality assurance work?
a. During technology project implementations, will need quality assurance/control
oversight as a part of the project management efforts.
10. On page 11, the City requests in-person attendance for the project kick-off and any other
in-person activities necessary to fulfill the scope of work. Is the City aware of additional
meetings that may require in-person attendance? In addition, is the City open to a
primarily remote model for this engagement?
a. City is open to primarily (day to day) remote engagement. Periodic in-person
meetings will be needed (kick-off, milestone work, ad-hoc meetings).
11. Is the Cover Letter and Executive Summary scored as part of the Evaluation Criteria? If
so, which of the four Criteria would it fall under?
a. These sections will be evaluated under Criteria 1, Firm Capability & Experience.
12. Can the City provide a table outlining where the response sections highlighted in Section
III map to the Evaluation Criteria in Section IV?
a. These sections will be evaluated under Criteria 1, Firm Capability & Experience.
13. Is the 1-10 scoring scale progressive where firms can receive any rating from 1-10, or
are the available ratings only 1-doesn’t meet minimum requirements, 5-fulfills minimum
requirements, or 10-exceeds minimum requirements, as highlighted at the top of
Section IV.
a. Scoring scale is progressive and firms can receive any rating from 1-10.
14. Can the submission deadline be extended by two weeks to allow for additional response
time after Questions and Answers are received?
a. No
15. Was the City’s Utility Technology Roadmap developed by an external vendor? Is there
an incumbent firm currently assisting with this assessment and transformation?
a. The Technology Roadmap was developed by an external vendor. A different firm
is assisting in this assessment. Neither firm will be a candidate for this scope of
work.
16. Item 2 on Page 6 under Scope of Work. This section requests defined and documented
roles and responsibilities for the future-state design. Will the vendor be responsible for
defining roles and responsibilities for the City Utilities IT/OT team, as well as the
Transformation Management Office (TMO), IT, and the Enterprise PMO (EPMO)? How
many departments and current staff members are in scope for this engagement? How
many roles are currently in scope?
a. answers:
(i) Looking for documented roles and responsibilities primarily for City Utilities
IT/OT team.
(ii) See org chart
(iii) TBD – depends on outcome of analysis
17. How is the City evaluating Cost & Work Hours? Is there an identified budget or other
criteria which can be shared in order to exceed minimum requirements for the category?
a. Cost will be evaluated per the details in Section III. F. with all vendor pricing
being compared. The City does not share budgetary estimates for projects.
18. Will Job Descriptions be needed for only newly created or highly revised roles, or is the
City soliciting the revision of all JDs within the IT/OT organization?
a. Just for newly created or highly revised roles
19. What is the expectation for consultants being onsite versus virtual?
a. See #10 above
20. How many staff are currently part of this reorganization effort?
a. See Attachment 1
21. The RFP states the scope will take place over 90 days. When do you anticipate this 90
days starting? (Context: 90 days in Q4 is a different landscape than 90 days in Q1.)
a. Updating to 120 days. Anticipate it starting Q4 2025.
22. What are the expectations for all of the various “augment” roles? On-site? For how long?
Expected hours/week?
a. TBD
23. Can you tell us more of the potential intent of the staff augmentation, including the role of
the augmented staff (e.g., more like a vendor or more like a partner)?
a. Looking for a vendor who is a long-term partner to support this work.
24. Are there any known constraints (e.g., collective agreements constraints, funding
envelopes, platform architecture, concurrent initiatives, internal capacity pressures,
transformation saturation, etc.) that must be accounted for in the implementation
roadmap?
a. Yes there are the typical constraints of a municipal utility (resources, capacity,
changing priorities)
City Manager
Deputy City Manager Assistant City Manager
Chief Information
OfficerOne Water DirectorLight & Power Director Chief Transformation
Management Officer
Director, Grid Ops &
Technology Sr Director, Operations Director, Technology
Sr Manager,
Transformation
Management
Sr Manager,
Substations & Grid
Tech
Relay & Protection
Engineer/ eSCADA
Engineer
Sr Analyst AMI
Systems
Sr Systems Engineer
OT (DMS, Legacy
Systems)
Sr Manager, wSCADA
& Industrial Control
Systems Admin
Sr Administrator
SCADA & PLC
Programming
Sr Administrator
SCADA
Sr Administrator
SCADA
Administrator I,
SCADA
Sr Engineer, Data
Sr Manager, Utilities
GIS Operations
Sr GIS Analyst/
Project Manager
Geo-Data Architect
GIS Analyst II
Electric Utility
GIS Analyst I,
Electric Utility
GIS Analyst II
Broadband Utility
GIS Analyst I
Broadband Utility
GIS Analyst II One
Water Utility
GIS Analyst I One
Water Utility
Sr Specialist,
Process
Improvement
Sr Specialist,
Process
Improvement
Sr Manager, Customer
Support
Sr Supervisor,
Customer Support CIS
Product Owner
Field Services Lead
(Mobile Work
Management)
Manager, IT
Applications Support
Sr Analyst, Apps
Software
Analyst II, Apps
Software
Analyst II, Apps
Software
Analyst II, Apps
Software
Analyst II, Apps
Software
Analyst II, Apps
Software
Director, Technology Director, Technology
Manager, City GIS
GIS Analyst II
Technology Architect
Sr Engineer, Data
Sr Analyst, Apps
Software
Analyst II, Apps
Software
Manager, City IT
Service Desk
Sr Technician,
Client Services
Manager, Network
Operations
Sr Engineer, IT
Security
Manager, Systems
Engineering
Engineer II,
Systems
Sr Analyst, IT
Security
Sr Engineer,
Database VACANT
Sr Electric Project
Engineer (Maximo
Project Manager)
Sr Data Engineer
(Maximo Product
Owner) VACANT
Reports to Director of Light &
Power Electrical Engineering
LEGEND
Utilities Shared & Funded Position
Utilities Partially Shared & Partially Funded Position
City-Wide Position (Non-Utilities Funded)
Utilities One Water Dedicated & Funded
Utilities Light & Power Dedicated & Funded
City of Fort Collins
July 28, 2025
Broadband/ Fiber Dedicated & Funded
Organizational Chart Scope Statement:
This organizational chart is specifically customized to illustrate the Information
Technology (IT) and Operational Technology (OT) positions related to Utilities within the
City of Fort Collins. It includes relevant roles from both the centralized IT division and
the IT/OT departments embedded within the City of Fort Collins Utilities Service Areas.
All non-IT/OT departments and positions are intentionally excluded to maintain a clear
focus on the technology functions that support utility operations and citywide
infrastructure.
EXHIBIT 2
November | 2023
Technology Roadmap
Technology Report
March 10, 2025
EXHIBIT 3
2TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 2Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapCurrent State Application Landscape
Platte River Power Authority
NextAxiom
Routine
Connexo
Netsense
Head End
Topos AMI
Meter Network
Manually Read/
Probed
Non-AMI Meters
Siemens
EnergyIP
MDM
Utilities Maximo
Energy
Supply
Transmission
Electric
Distribution
And Grid
Management
DER Solutions
Banner Customer Information System (at PRPA)
Itron Comverge DR functions have been
absorbed by IntelliSOURCE
Cisco Finesse
Agent desktop
Eleveo
Call Logging Quality
Monitoring
JD Edwards ERP
Commercial
Ops
AutoCad & DWG
AutCad Drawings
Franklin Energy
Feed ( to V1)
Legend for Platforms:
Potential In-Scope
Out of Scope Existing Project
Out of Scope Functionally
Bill - Billing and
Invoicing
Bill - Payment
Posting
Meter Read
Data
Iconics Gen64
eSCADA
ArcGIS Explorer
(Antiquated viewer)
EMS
iEnergy Operations
PowerClerk
PV/Batteries Attributes
ArcFM
Designer
EDAR DMS/OMS
(temporary)
ArcFM GIS
Desktop and Portal
ACS Prism OMS
(to be decommissioned)
Asset
Management
Work Order
Management
Materials
Management Data SpliceScheduling
Credit &
Collections
Customer Case
Mgmt
Rates Admin Bill Test
Bill Format
Honeywell AMI
Customer
Meters
Operations
General LedgerFinanceUtility Accounting
Itron
IntelliSOURCE
DERMS (Load Mgmt)
Kubra - Customer Online
Payments (goes away)
(EBPP Electronic Bill/Pay)
Inhouse
Bill Print
and Inserting
NCR - Customer CC
Payments
We
s
t
e
r
n
I
n
t
e
r
c
o
n
n
e
c
t
i
o
n
Itron MV-90
Large C&I
Non-AMI
Customer Meters
Milsoft
Engineering
Operations
One Water
Bertha
BC Services
for Collections
CDS Global
Payment Aggregators
CallNet
After Hours
My Energy
(to V1 VXEngage)
ESRI ArcGIS
Customer Address (Banner, LPCE, Cust
Solutions)
Azure Data Lake
Crystal Reports
Customer Data
Accela
LPCE
Cisco
Phone Switch
WattNet
Meter Test
NextAxiom ver 10.5.0.1
Primary Middleware Platform
w/Dev Ops Used if apps don’t have APIs
Middleware extends app capability
AMS Device
Manager Backflow
Customer Portal
For Account
Management (to V1)
EPA SWMM
storm water modeling
Electric
Systems Load
Energy Engage Mobile
Web Portal for Acct
Mgrs
GIS Streetlights
Access DB has
attributes
MARS
Water Meter Testing
MiniTab 17
Statistical Analysis
Data Visualization
Itron MV-Web E&W
OpenFlows
Flowmaster
Engineering Calcs
Nexant
iEnergy
InfoWater
GeoSpacial Water
Tool
W KAFKA
Streams data so MS
Azure Synapse
Surface Water
Modeling System
AMI Customer
Meters (mix with
Siemens Comms)
Non-AMI
Customer Meters
Manual
Spreadsheets
Data Warehouses
AutoCad
Iconics Gen64
wSCADA Suite
Siemens
VFD
Schneider Vejeo
Designer
Programmable HMI
Eco Structure Control
Expert and Proworx
PLC programming
Unity Diff CombiVis 6
Connected
Components
Prosoft Profi
Trace
PowerBI
Customer Data Customer Service
Representatives
My Water
(Water Smart)
(Capability goes to V1)
Usage Data
Address
Validation
MEAT Meter Energy
Analysis Tool (Apex
Reports
Materials
Management
(MMA)
Switchpoint
Inspections
SubAssets
Substation Assets
Serialized
Equipment
(SED)
Admire
Meter Inventory/
Inspections
Electric Meter
Database
Instrumentation CT/PTs
Equipment &
Cable Outage
Stats
Trouble Call
OMS
Cisco UCCX
ACD and IVR
Online Service Requests
start/stop (goes away)
Appropriations
Status
Collector
Applications
Contrail (Flood
Warning System)
Control Number
Esti-Mate
Electric
Field Pro
(Itron)
Finance Rate
Analysis Water and
Wastewater
First National Bank
(Customer Payments)
US Army CE flood
hydrologic model
ArcFM
Conduit Manager
X
X
X
Waste Water Plants
Water Production Plants
WaterSmart
Water Utility
Mgmt System
GraniteNet
Video Inspection
X-LIMS
Lab Software
ESRi ArcGIS
(Suite)
Water Field Operations
CASS Certification
USPS (with PRPA)
Innovis
Identify
Verification
UView (ESRi
webmap)read-only
BOSS 811
Utility Locates
IoT Customer Devices
Behind the Meter
Enervee
Marketplace
for EE Products
Field Reps
THOR CSR knowledge base
OneNote (replace with SP)
ArcMap
ESRi ArcGIS Pro
Linko
Water Complaint
Work Order to Test
UtilityAPI data consent
authenticate customers
authorize data sharing
3TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 3Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapFuture State Application Landscape
Electric Distribution And Grid Management
SE Network
Modeling
VertexOne
VXEngage
Platte River Power Authority
NextAxiom
Routine
Connexo
Netsense
Head End
AMI
Meter Network
Manually Read/
Probed
Non-AMI Meters
Siemens
EnergyIP
MDM
Utilities Maximo
and Maximo Mobile
Energy
Supply
Transmission
DER Solutions
VertexOne VXCIS
Itron Comverge DR functions have been absorbed
by IntelliSOURCE
Cisco Finesse
Agent desktop
Eleveo Call Logging,
Quality Monitoring
JD Edwards ERP
Commercial
Ops
Legend for Platforms:
New/Updated Capability
Customer Applications
Electric
Water
Bill - Billing and
Invoicing
Bill - Payment
Posting
Meter Read Data
EMS
iEnergy
Trans
Operations
PowerClerk
PV/Batteries Attributes
Asset
Management
Work Order
Management
Materials
Management
Mobile Work
ManagementScheduling
Credit &
Collections
Customer Case
Management
Rates Admin Bill Test
Bill Format
Honeywell AMI
Customer
Meters
Energy
Trading
General LedgerFinanceUtility Accounting
Itron
IntelliSOURCE
DERMS (Load Mgmt)
Printed Bills
NCR - Customer CC
Payments
We
s
t
e
r
n
I
n
t
e
r
c
o
n
n
e
c
t
i
o
n
Itron MV-90
Large C&I
Non-AMI
Customer Meters
Energy
One Water
BC Services
for Collections
CDS Global
Payment Aggregators
CallNet
After Hours
Esri ArcGIS Pro (Suite) v 3.X
Customer Address (Banner, LPCE, Cust
Solutions)
Meter Energy
Analysis Data
Crystal Reports Bertha Data
Tyler Technologies
LPCE
Cisco
Phone Switch
NextAxiom ver 10.5.0.1
Primary Middleware Platform w/Dev Ops
Used when apps don’t have APIs
AMS Device
Manager
Backflow
Electric
Systems Load
Data Visualization
Itron MV-Web E&W
Nexant
iEnergy
AMI Customer
Meters (mix with
Siemens Comms)
Non-AMI Customer
Meters
Azure Synapse Data WarehousesW SCADA
Siemens
VFD
Schneider Vejeo
Designer
Programmable HMI
Eco Structure Control
Expert and Proworx
PLC programming
Unity Diff
Connected
Components
Prosoft Profi
Trace
Customer Service
Representatives
Dispatch
My Water
(Water Smart)
Address
Validation
Cisco UCCX
ACD and IVR
Appropriations
Status
Contrail (Flood
Warning System)
Esti-Mate Electric
Field Pro
(Itron)
Finance Rate
Analysis Water and
Wastewater
First National Bank
(Customer Payments)
X
X
X
Waste Water
Plants
Water
Production
Plants WaterSmart
Water Utility
Mgmt System
Water Field
Operations
InfoSend
Innovis
Identify
Verification
IoT Customer Devices
Behind the Meter
Enervee
Marketplace
for EE Products
Field Reps
SharePoint
CSR knowledge
W
K
A
F
K
A
St
r
e
a
m
s
d
a
t
a
s
o
M
S
A
z
u
r
e
S
y
n
a
p
s
e
Water Complaint
Work Order to Test
(from XLIMS)
Linko
Customer Portal
For Account
Management
My Energy
Energy Engage Mobile
Web Portal for Acct
Mgrs
Customer Preference
Center
Product and Service
Catalog
Customer Program
Enroll/De-Enroll
CASS Certification Bill Print
Electronic Bill
Print and Pay
PRPA DERMS
ADMS
Esri Geolocation/Visualization of
the Utility Network
Customer
Incentive/Rate/
Bill/Pay/Credit
Customer Support
Customer
NotificationsProduct Development
Product Attributes
Grid DERMS
Connect, Aggregate,
Optimize, Dispatch,
and Report Utility DERs
and VPPs
Grid Edge DERMS
Connect, Aggregate,
Optimize, Dispatch, and
Report Customer DERs
to VPPs
Service Orders
Work
Management
Meter Shop WattNet
Meter Test
Engineering
Support
E SCADA
Iconics Gen64
ArcFM
Conduit Manager
BOSS 811
Utility Locates
Uview Web
read-only web maps
Esri ArcGIS Pro (Suite) 3.X
Milsoft
Engineering
Operations
Outage
Management
Distribution
Management
System
AutoCad & DWG
AutCad Drawings
ArcFM GIS
Desktop and PortalAutoCad
Engineering
OpenFlows
Flowmaster
Engineering Calcs
Laboratory
and Analysis
X-Lims
Lab Software
MARS
Water Meter Testing
Surface Water
Modeling System
USACE
hydrologic model
EPA SWMM
storm water modeling
Geolocation/
Visualization
of the Utility
Network
Iconics Gen64 *Esri ArcGIS
Enterprise
InfoWater
GeoSpacial Water
Tool
Customer Data
Esri ArcGIS Pro
(Suite) v 3.X
GraniteNet
Video Inspection
MiniTab 17
Statistical Analysis
CombiVis 6
Electric Usage DataWater Usage Data
X
Poudre Water Quality
Network (PWQN)
Eleveo
Workforce Management
UtilityAPI Data Consent
Authenticate customers
authorize data sharing
ArcFM
Designer
ArcFM
Mobile
Uview Web
read-only webmaps
*Esri ArcGIS Enterprise
*Esri ArcGIS Enterprise
- ArcGIS Dashboards
- ArcGIS QuickCapture
- ArcGIS Survey123
- ArcGIS Workforce
- ArcGIS Sites
- ArcGIS Field Maps
- ArcGIS StoryMaps
- ArcGIS Experience Builder
- ArcGIS Map Viewer
4TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 4Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapTechnology Roadmap Value for Fort Collins
•Aligns technology initiatives
to FCU’s City goals
•Creates clear vision for FCU’s
future
Strategic Clarity & Alignment
•Meets current demands
•Supports future growth
•Considers emerging
technologies
•Establishes clear path for CIS,
EAM, ADMS, CX, GIS
Future-Proof FCU
•Cultivates collaboration and
buy-in
•Delivers enhanced tools and
solutions
Customer & Employee Centricity
•Helps forecast resource needs
- technology, capital, expense,
resource
•Improves financial visibility -
capital underutilization &
expense overutilization
Financial & Resource Planning
Enable a future-ready utility where technology empowers our employees to fulfill commitments to people, communities, and the environment.
•Facilitates clear view of
upcoming projects
•Reduces likelihood of
reactive decisions
Informed Decision-Making
5TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 5Technology Roadmap v1.0 3/10/2025
Digital Network
Models/GIS
Tech
Management
2025 2026 2027 2028 2029
Maximo Upgrade to MAS9
MaxP1: Maximo for Water & Electric Meter Shop
Upgrade DataSplice V7 MaxP7: Substations
MaxP5: Design/Build Work Management
MaxP6: Serialized Equipment
MaxP4: Electric Structure Asset Management
MaxP3: Electric Distribution Asset Inspection
MaxP2: Warehouse Data Conversion & Configuration
MaxP8: DataSplice to MaxHydraulic Modeling Upgrade
Address Management System
Migrate Maps on GeoCortex
Align ArcFM & ArcPro Model
ArcMap Retirement
GIS Migration & Implementation
Digital Accessibility
Citywide Digital Experience Platform
CIS Billing Replacement
Eleveo Data Migration Eleveo Work Mgmt. Sys Strategy & Implementation
Customer Contact Center Optimization
Customer Digital Experience
Expand Interactive Voice Response Capability & Improve Customer &
Employee Digital Experience
Tenant Manage API (TMA) Upgrade/Migration to SaaS Datawarehouse & Data Lake BuildCache la Poudre River (CLPR) Quality Dashboard
Program
Delivery
OCM
Outage Management System(OMS) Transition
Advance/Distributed Management System (A/DMS) Procurement & Implementation
OMS Procurement & Implementation
Water Head-End System Communication
License, Permit, & Code Enforcement
PRPA & FC Distributed Energy Resource Mgmt. System(DERMS) Integrated Strategy & Implementation
Intellisource Integration
PRPA & FC DERMS Optimization
Roadmap Governance
Geographical Information System(GIS)
Governance
Project Management Office
Enterprise Architecture
Application Ownership
Business Relationship Manager(BRM)/Technology Relationship Manager(TRM)
Organizational Change Management (OCM) & Business Process Mgmt.(BPM) Governance
Budget/Capacity Planning
Digitalization
Data
Management
Work & Asset
Lifecycle
Management
Legend:Analysis & Planning PhaseImplementation Phase
Strategies/GovernanceRoadmapIn Flight
Water Work & Asset Mgmt.
Strategy
6TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 6Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapRoadmap - Change Saturation Summary
Change Categories:
•Process,
•Technology,
•Job Skills,
•Customer Interaction
Sum of In-Flight projects planned during each half-year indicate:
•Average of 8-12* in-flight projects (years 2025-27)
•One substantial project scheduled yearly
Note:
•Peak change saturation occurs mid-2025 through mid-
2026
•Concurrent “substantial” projects occur 2025-1H thru
2026-1H
Minimal
Will not significantly change workflows or responsibilities. Limited
amount of training required.
Moderate
Different workflows and introduce new processes; Impacts
some employees and groups; Some training and
communication required
Substantial
Significant change that directly impacts current processes and
systems; Impacts many employees or departments;
Comprehensive training and corresponding communications
required
12*8*12*11*7*6*6*5*12*
LPCE & launch of
ADMS/DMS
CIS Upgrade &
launch of LPCE
7TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 7Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapKey Risks
#Category Risk Title Probability Impact Threat Action
1 Roadmap Governance Challenges to staff both roadmap governance, projects, and operations 5-Highly
Likely 4-Major High Reduce
2 Project Delivery Budget constraints 4-Likely 4-Major High Reduce
3 TMO, STO, OCM, PMO,
and BPM
Lack of commitment to minimize software changes and adhere to industry/product best
practices 4-Likely 4-Major High Reduce
4 Project Delivery Lack of project delivery maturity, methods, and tools 4-Likely 4-Major High Reduce
5 Application Ownership Lack of application ownership 3-Possible 4-Major High Monitor
6 Project Delivery Vendor failure to perform 3-Possible 5- Critical Medium Transfer
7 Data Management Lack of a governance model 3-Possible 4-Major Medium Reduce
8 Data Management Poor data (i.e. digital network model)3-Possible 4-Major Medium Transfer
9 TMO, STO, OCM, PMO,
and BPM
Ineffective change management, training and communication program for the roadmap
and the projects 3-Possible 4-Major Medium Reduce
10 Technology
Management Lack of mature IT enterprise architecture 3-Possible 4-Major Medium Reduce
8TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 8Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
Roadmap
Cultivate Proactive & Strategic Mindset
Shift to a more proactive and strategic mindset for
technology investments
Shift our Mindset on How We Make Technology Investment Decisions
FCU has challenges keeping application versions current and completing projects as planned. Going forward, we must:
FuturePast
Siloed Utility Service Area Decisions
Conservative Experimentation
Reactive Prioritization (End of Life)
Tactical Solution Thinking
Think Capability Advancement
Prioritize investments that advance FCU capabilities
Innovate
Rally around innovative & future-focused decision-making
Identify projects with input from across FCU and
establish a well-defined evaluation structure
Collaborate on Project Ideas & Evaluation
9TMG Confidential – for use by City of Fort Collins authorized personnel only
Application Workshops 9Technology Roadmap v1.0 3/10/2025
Phase 5
Technology
RoadmapHow You Can Help
You are a key part of making a shift in mindset happen….
Communicate Transparency
Ensure your teams understand why
this matters - explain why focus on
strategic capabilities is critical
Pave the way for the shift in mindset
- help guide FC through the transition
Serve as a Change Agent
Remain Actively Engaged
Express your support - executive
commitment encourages others
to engage
Understand Concerns
Acknowledge that change is often
harder than expected - be realistic
about how FCU will navigate