Loading...
HomeMy WebLinkAboutLAKE STREET TOWNHOME PUD - Filed GR-GEOTECHNICAL REPORT/SOILS REPORT -TABU OF CONTE S Table of -Contents e,........ee.. 000.oae00..o0404e0oe00«.o. Letter ofTransmittal..........:......:....er.,..e..., ii ru.Mo'art'#we..00.oa.oa.o-000.r..r.o..re..ese...aoat.,-a....:.......a.. 1 Appendix A A-1 lost Boring Location Plan .... 4o00008*00.o0.00,.e0041 oa A•2 to Borings o..00}l.orrtoor`.....e,o..erse.e,..00er;ao..as.o` A-3 Log of Borings A-4 Appendix 1 •o..r.o-.r i+le+tlo,A.rs+i.o.r0e.4.a0aooe0009e0eO'r40*o0oa ConsolidationTest .Data B-2 Sumary+ of..Test Results B-4 Aoperndix G.o.00000..o.•so....toeo..roa0aaaerrae......r,o.o0 Val M 0 e IAboratories, Inc. MATERIALS AND FOUNDATION ENGINEERS 214 No. Howes Fort Collins; Colorado 80522 P.O. Box 429 (303) 484-0359 Febnuzvcy 26, 1979 8xa.d6otd L. Smith and Associates 155 Noxth Cot2ege Avenue Foxt Cot2ins, CoZonado 80524 Attention: Joe RoesseA, Jt., P.F. Gentlemen: Branch Offices 1242 Bramwood Place Longmont, Colorado 80501 P.O. Box 1135 303)776-3921 3151 Nation Way Cheyenne, Wyoming 82001 P.O. Box 10076 307) 632.9224 We ate pteaded to submit out Repoxt o6 a Geotechnica2 Investigation ptepated Got the pxopoaed Lake StAeet Townhome, P.U.D., Poxi CotZin6, Cotoxado. The subsut6ace' condi ;iona teveated by this investigation ate zuita.bte Sot the .intended eonsttuction, provided constolcuetion ,is in aecoxdanee with the tecommendatioms contained, .in th 's nepoxt. The attached %epo't pnesent,a the subsut6ace conditions at the site and oun recommendations box. 6oundation design and constiucation. We appnec iaie .this oppoxtu.ni ty of consulting with you on thtz ptoject. 16 you have any que 6t ions ox.:i6 we can be o 6 huh the& assistance, please contact u.6. V et y nutty youAz, EMPIRE LABORATORIES, IINNCC.. James E. Veith, P. E. Geotechnicat Enginee,% Reviewed by: C ChesteA C. Smith, P. B. Puzident E. IQ.. Vol 4808 a IiCaOtj1 MEMBER OF CONSULTING ENGINEERS COUNCIL I" REPORT OFA, GEOTEOMICAL IWESTIGATION SSE This report presents the results of a geotechnical investigation prepared. for the proposed Lake, Street. Townhoee, P.U.D., Fort Collins, Colorado. The investigation included test borings,, laboratory testing, engfneering. evaluation,.and preparation of this.report. The purposes of teainvestigation were to determine subsurface condi tions i.tionsatthe site and; to provide 'recampeodations for .site development as, influenced - by the subsurface.conditions. SITE Y StII I_IOB Six (6) test borings wem drilled at the,site on.February 16, 1979. Locations of the test borings are shown on,tie Test Boring Location Plan included in Appendix A. The test borings were established in the field by referencing to existing topographic features:. The borings were advanced with continuous -flight augers to depths fourteen and one-half (141j) feet below present grades. Samples were recovered with two and one-half ( )inch Shelby tubes and the standard penetration sample technique.. During drilling, an engineering geologist of Empire Laboratories, %no was present and made a continuous visual inspection of soils encountered. Logs prepared fry the field Logs are included in Appendix k of this report. Indicated on the logs are the prjoary. strata encountered; locations of .samples, and groundwater conditions. SITE LOCATION AND DESCRIPT12 The reference -site is Ideated between Prospect and lake Streets east'of.Shields Street in Fort Collins, Colorado. More specifically, it can be described as a tract,of aand.s tuate in the southwest 1/4 of Section 14, Township 7 North, :Range 69 West of the Sixth P.N., Fort Collins, Colorado The. project site -is presently an open area with flat to gently rolling topography.. Pr1mafy' slope and drainage are to the north. Two 2) small irrigation Bite m trdverse the south portion ofthe property In an east -west direction.', The east on west property lines are presently fared. j AABt1RATORY TESTS AW .p MD ATIORS Representative samplat recovered in t ,tett borings were selected:. for tests in the laboratory to. determine their physical characteristics and engineering properties Included in -the test program were natural moisture content, water soluble sulfates, Atterberg limits, dry density, unconfined compressive strength ,' Onsalidawn potential,: Snell .potential, and swel l sconsol idati on potential'.. Laboratory test results are stsimarized in Appendix R .,,j 301h., AM W OtlRDiIATCR fI ONS The following are the„ characteristics of the primary. soil strata- encountered at the site. 41 i To I The site, Is overlein by d layer of sandy topsoil. twelve `l) inches thick. The upper six .(s) inches of the topsoil' have been penetrated by root growth and organic utter and should not be used for foundation bearing or as bactfill saiteri al . 2) SiltX,C't= Sand: The topsoil 1s underlain by: red and brown silio.clayey sand -extending to the depths explored. This stratum contains Sim gravel .and :occasional thin sews and layers of fine, sand.: With increasing depth Into this atre tO% the material becomes, more moist and softer,, The.. silty clayey sand exhibits moderate -sheer strength and bearing qualities, In its undisturbed natural state, Upon vatting, the silty clayey s ' exhibits I.W swell potential. 3) Groundwater. No water was encountered within the depths explor+ed at the timethis investigation. Groundwater` oflevels at -the site are, however, subject to fluctuation' depending on seasonal conditions and variations and irrigation 3I demands on and adjacent to the property. I ai EMENDATIONS AND DISC.0S 2! plans provided Ito' us indicate that five (5) town haute units will be Constructed at the site. . anticipate that ,the buildings will be one ( 1) or two (2.)' sto r and. may have basements. . The following are OUT, recommendations for site davelop=nt as influenced by the subsurfaces conditions' encountered 6 ' the test bofr O$. Site 6radirg ate anticipate that some.cutting and fi"tiing will be required on the Ply to. achieve desired finished grades. As building foundations and/or slabs on grade my be supported on-filljwe recoomw that fill placeeent be in, accordance' with Flit. Data Sheet- 79G.. The following are our recommendations for situ grading and placement of reacted fill. The upper six (6) inmost:of all. topsoil should be .stripped in proposed cut and fill treat and :in building and pavementLaren which will remain. at present grades, ,"iho topsoil can be stockpiled on tine : 52 site and used for final grading outside Of -building and pavement areas. At cut subgrade elevation and in areas to receive fill A the upper six 6j' inches of the subgrade should be scarified and recompacted at two percept AM pet of optimum moisture content to,.4 Minimto of ninety percent J90%) of Standard Proctor Density AS'iWO 698-704 (See Appendix The or! -site silty clayey. -Sand is suitable for :fill in proposed building -and pavement area6. :Ayr additional off -site fi11 required should be a material approved.. by geotechnical engineer. recommendthe that all fill be placed in horizontal six (6) to eight Winch lifts at two percent (2%) wet of optimum moistu;content and compacted to a percent ty ASTK Dtnieirofninetyfire rcent 955 of Standard Procter* t nsi s9-fop tyre fill .is placed, on slopes, greater than 4,-1 # horizontal benches:; should, be cut in the. sl'op6.5 to .insure integrity of the new fill on the existing slopes* for stability9.+re.,.recommend that ell .cut .and fill slopes be no steeper than 2:v, flatter. slope; are suggested for ease of maintenance. finished slopes should be seeded with native gasses to y minimize -erosion. Qualified geotechnlcal ,personnel should be present during all phases of eartbwrb-to observe. -stripping of the topsolI scarification, of the subgrades and placement and compaction- of fill, in -place density tests should be taken dait,y todetermine the degree of compaction. being 7 attained and compliance with project specifications. W anticipa te'that no unusual .proble mill. be-oncountered daring excavation for ,utilities. Temporary cut -.slopes in the silty clayey sand Willi be stable .an ll, sloppsplotter slopes. and/or shoring will be required if groundwater or, seepage is, encountered. All baekfill. pYaced in utflty.treraches in open and planted areas should be compacted in:uniform lifts at optimum Moisture to at least . r inetjv . percent 90Sj of Standard Proctor Density AST14 D 698-70 the full depth of the. trench* The upper four (4) feet of backfill placed in utility trenches under roadways and paved areas should be compacted at yr near optima moisture to at least ninety-five percent (95%) of Standard Proctor density ASTN D 698m70'9 and"the icier portion of these trenches should be compactedto it -least ninety percent (90%) of Standard Proctor Density . D 698-70. Addition of moisture to,the subsoils may be required to assure pr4per•..compaction:. It is.reaxuended.,tha all compaction requirements for uttlttp..trenches be verified.ln the field with density. tests performed under, toe. direction of the soils engineer.. foundetto Based upon the subsurface conditions encountered at. the site and the • 1 oads transmitted. by ..the proposed construction, wo,,recomend that 914- sutures be supported, by..conventionil continuousor isolated sproad footings bearing in,undisturbed natural', soil or, Ill l,placed as recommended above.: As . on-iOte materials will. be used for ff 11 ', strut- triral . fill placed and comp$cted as.reccesended _above will .have coia- M parable shear strength and bearing qualities % those -of -,,the -in situ moterials. Exter9or` footings . should bear a minimn of thirty(30) itches below exterior finished grades for frost protection.; The nature of true , bearing soil. should, -tie : verified by qualified Wtechnicil personnel 01gr to placement of. fo da iron toncrot+e Footings bearing at a above- -recommended depths mac be designed fQr;,a . ma ximum allowable sofT'.pr+essure of three thousand . (3,OQO) pounds per:..,square foot under: dead ;plus maximum live loads.:- To resist swelling p ssures, which will develop' if the, subsoils become wetted ' .l footings shpuld. be designed for,,a-no0j upn dead., load pressure of 'five hundred 500) Pounds pper square . fogt .., . The anticipated settlement. under the above -recommended maxim prnssuress, based aapon.labp tort.tests and analyses, should not exceed 0.$ inch. Basements and dabs on Grade The subsurface profile revealed by this investigation will permit excavationofbasnts for the structures. Based upon field and labora- tory test results an. d.eXAMhations of eeco"red samplest we anticipate that,no dewatering Systems.wilI be required beneath basements._ Preparation to slab'on grade.subgrade elevation should be acccltshed as twended above. All. slabs an grade should_be: underlain by a minima of four (4) i.nohes of gravel or crushed rock free of fines.. The gravel layer vol act as a capillary break and will. help to distribute floor loads. It is , f L recooded that slabs on grode,be:designed.and constructed independent i of. .alI bearing 'members, Tp "minimize and control shrinkage cracks which miiiI develop in slabs, on grade,'"it is suggested that control .joints be placed every fifteen (t5) to 'twinty (RB) feet and than the total :area, ontai'ned within these t ints`.be no greater than four hundred (460) f J 444re foot." Garage fl000r stabs should be, reinforced With :wire Mesh running . ,through the" control joints' Pavewnt 4y' Ifthitt areas to be -paved, preparation to subgr'aoe elevation should be accomplished as reco"'. d: ,tn the *Site Grading!'.'section of , thus report. . A.A S M.T#o. classification, of :the material forming pavement subgrade is A- -4_.with a group .index of 0. Based upon a group index of Q the following pavement, thickness is reccomended Coll Restdnottal Select Base Course 6. OF Asphaltic Co MUI 2" 20 Total "Thickness $ - .. . 6 The above-recomomWed thickness for residential ,stnets should be used"for .off-street parking areas. Asphaltic concrete should meet City of Fort Collins'specifications.and be"placed'in accordance with those apec#fications# The, base- course- overlying -the subgrade should consist of a hard, durable,.crushed rock or stone and -filler and should have a minimum C.04R. value of 80. The composite base course materia] should be free. from vegetable Matter and 'lumps -or balls of clay and should apt the Colorado Department of :Highways Specification ,Class 6 Aggregate Base Course which follows: 5ieve.Size° I Passing 3/a200 04. 30-65 ,; , 8 25451 l200 Y 3-12 Liquid, Limit - 3O+ akitmxa Plasticity. Index 6 Maximum The base course should be placed on,the subgrade at or near optimum moisture and compacted to at'least ninety,five percent (95%) of Standard proctor Density`ASTM D 698-70._ , (See Appendix C;) - It is important that the base course:be shaped to grade sa,'that.proper'drainage of the parking area is,obtalned. GENERAL REC"LILATIONS I) Laboratory testsAndl'eate that water soluble sulfates in the subsoils are negligible. , A Type I cement May be used in all concrete exposed to subsoils. 2) finished grade should: be'sloped away from the structures on all- sides .to give positive drainage.,. Five percent (5S) for: the first five (5) feet a from the -structures is the suggested slope. 3) Backfil.l around the outside perimeter of the structures should be mechanically compacted at optimum moisture to at least ninety -five -percent, (95%) of Standard,Proctor Density AS'iM 698-70. (See Appendix C.) Puddling should not- permi'tted as a method'of compaction. 4). Gutters and. downspouts should be designed to carry roof runoff water well beyond thee.backfill area. 5) underground sprinkling systems should not be installed within ton (10) fuel . of the, - structures:, . and this recommendation should be taken into account in the landscape planning. 6) 3t is mended that '411 compaction requirements_ specified herein be verified in the field with density tests performed under the supervision of an experienced.geotechnical engineer. 7). It'is_-reconmended that a registered prafe$sional engineer design the foundations, using the recomanndations presented in this 'report. GFAERAL COMENTS This report has been prepared to aid in the evaluation of the property and to assist.the:architect and/or engineer in the design of this prtaJect. In . the event that any changes in the des lgn of the structures or their locations are planned, the conclusions and recom mendations contained in this report will not -be considered.valid unless said changes.acre reviewed and.'conclusions of this report modified or approved in writing :by- moire :l aboratories, . Inc-., the soils engineer, of record. N' N Every effort was .made to provide comprehensive site coverage through careful locations of the test borings# -while keeping the site investigation scono i-ally feasible. Variations in soil and groundwater conditions between test ,bor°ings may be encountered during construction. In order .to `perms t correlation. ,between the reported . subsurface eon- ditions and the actual -conditions encountered during construction and ,to aid Wcarryi ng out the plans. and. specifications as originally con - plated, it is re; nddd that Empire Laboratories, Inc. be retained to performs continuous .cotruction review during the excavation and foundation phases of the work.:. ire Laboratories, Inc. assumes no responsibility for cbmpl Uncn. Frith the reconnen.dations included in this, report unless -they have been retained to perform adequate.on»site construction review during the course of construction. APPENDIX A. 3 i KEY TO BORING LOGS TOPSOIL L• GRAVEL FILL SAND & GRAVEL SILT is SILTY SAND & GRAVEL. 1 CLAYEY SILT ep COBBLES I. SANDY SILT SAND, GRAVEL &COBBLES CLAY WEATHERED BEDROCK. i SILTY CLAY SILTSTONE BEDROCK SANDY CLAY CLAYSTONE BEDROCK SAND SANDSTONE BEDROCK SILTY SAND Ed LIMESTONE CLAYEY SAND K x K K GRANITE SANDY SILTY CLAY SHELBY TUBE SAMPLE STANDARD PENETRATION DRIVE SAMPLER WATER TABLE 24 HOURS AFTER DRILLING C HOLECAVED T 5/12 Indicates that 5 blows of a 140 pound hammer falling 30 inches was required to penetrate 12 inches. A-3 EMPIRE LABORATORIES, INC. 100 95 90 85 10/12 80 _ 95 90 APPENDIX B. 41 39 ua .o S 10 APPLIED PRESSURE—TONS/SQ. FT. 0 JJW tl Z 0 Q 0 QJ N Z O i 5 10 APPLIED PRESSURE—TONS/SQ. FT. EMPIRE LABOPXA ORIES, INC. 52 51 b0 9.49 a 0 o .48 47 46 45 44 0 1 W 2 II 0 3 a 0 4 z O u 5 6 10 APPLIED PRESSURE—TONS/SQ. FT. Eli1111 111 11111 III 11111 11111 IIIII n lllli\11111 IIIII 11111 5 to APPLIED PRESSURE—TONS/'SQ. FT. B-3 EMPIRE LABORATORIES, INC. Z, O= NU Q Z- O N N r N N N N H O to co Z 3 r-- r c S N r dm W co Vol w uQ M cn J W N W au Z OG a vi H p i LU NU M CD CD C) p Ce aW U N N LO M O LL. W W0N M L1) O OOm LLi G N iq ZLL 00 V O M 10 r0 W D r Co N r O M r CD co O O Lo O 01 O LO O O. O CD 11) Im-d 0 al r . Cf ci O Ol r t Lo m 01 O O O O O O O O 1- O tl7 1 O 1 O I O 1 O 1 tfy M a ^ co M M ct Ct 1 CO M LO OZ m B-5 SUMMARY OF TEST RESULTS Swelling Pressures Boring Depth Moisture Dry Density Swelling Number Ft.) Before Test _ PCF Pressure PSF 2 3.0-4.0 4.9 109.5 335 7.0-8.0 5.7 95.4 255 4 3.0-4.0 4.2 109.6 205 5 7.0-8.0 4.3 114.1 660 6 3.0-4.0 7.6 116.3 325 Atterberg Summary Boring Number 1 @ 4 @ and Depth 30-4.0 3.0-4.0 Liquid Limit 24.6 20.2 Plastid Limit 16.1 18.2 Plasticity Index 8.5 2.0 Passing #200 Sieve 30.9 33.8 Group Index 0 0 1 Classification Unified SC-SM SC-SM AASHTO A-2-4(0) A-2-4(0) B- APPENDIX C. APPENDIX C. Suggested Specifications for Placement of Compacted Earth Fill and/or Backfills. GENERAL A soils engineer shall be on -site to provide continuous observation during filling and grading operations and shall..be the owner's repre- sentative to inspect placement of all compacted fill and/or backfill on the project. The soils engineer shall.approve all earth materials prior to their -use, the methods of placing, and the degree of.compaction obtained. MATERIALS Soils used for all compacted fill and backfill shall be approved by the soils engineer prior to their use. The upper two (2) feet of compacted earth backfill placed adjacent to exterior foundation walls shall be an impervious, nonexpansive material. No material, including rock, having a. maximum dimension greater than six inches shall be placed in any fill. Any fill containing rock should be carefully mixed to avoid nesting and creation of voids. In no case shall frozen material be used as a fill and/or backfill material. PREPARATION OF SUBGRADE All topsoil, vegetation (including trees and brush), timber, debris, rubbish,.and other unsuitable material shall be removed to a depth satisfactory to the soils engineer and disposed of by suitable means before beginning preparation of the subgrade. The subgrade surface of. the area to be filled shall be scarified a minimum depth of six inches, moistened as necessary, and compacted in a manner specified. below for the subsequent layers of fill. Fill shall not be placed on frozen or muddy ground. C-2 PLACING FILL No sod, brush, frozen or thawing material, or other unsuitable material shall be placed in the fill, and no fill.shall be placed during unfavorable weather Iconditions. All clods shall be broken into small pieces, and distribution of material in the fill shall be such as to preclude the formation of lenses of material differing from the surrounding material. The materials shall.be delivered to and spread on the fill surface in a manner which will result in a uniformly compacted fill.: Each layer shall be thoroughly blade mixed during spreading to insure uniformity of material and moisture in each layer. Prior to compacting, each layer shall have a maximum thickness of eight inches, and its upper surface shall be approximately horizontal. Each successive 6" to 8' lift of fill being placed on slopes or hillsides should be benched into the existing slopes, providing good bond between the fill and existing ground, MOISTURE CONTROL While being compacted, the fill material in each layer shall, as nearly as practical contain the amount of moisture required for optimum compaction or as specified, and the moisture shall be uniform throughout the fill. The contractor may be required to add necessary moisture to the fill material and to uniformly mix the -water with the fill material if, in the opinion of the soils engineer, it is not possible to obtain. uniform moisture content by adding water on the fill surface. If, in the opinion of the soils engineer, the material proposed for use in.the compacted fill is too wet to permit adequate compaction, it shall be dried in an acceptable manner prior to placement and compaction. COMPACTION When an acceptable, uniform.moisture content is obtained, each. layer shall be compacted by a method acceptable to.the soils engineer and as specified in the foregoing report as determined by applicable standards. Compaction shall be performed by rolling with approved tamping rollers, G-3 pneumatic -tired rollers, three -wheel power rollers, vibratory compactors, or other approved equipment well -suited to the soil being compacted. If a sheepfoot roller is used, it shall be. provided with cleaner bars attached in a manner which will prevent the accumulation.of material between the tamper feet. The rollers should be designed so that effective weight can be increased. MOISTURE -DENSITY DETERMINATION Samples of representative fill materials to be placed shall be furnished by the contractor to the soils engineer for determination of maximum density and optimum moisture or percent of Relative Density for these materials. Tests.for this determination will be made using methods conforming to requirements of ASTM D 698, ASTM D 1557, or ASTM D 2049. Copies of the results of these tests will be furnished to. the owner, the project engineer, and the contractor. .These test results shall be the basis of control for all compaction effort.. DENSITY TESTS The density and moisture content of.each layer of compacted fill will be determined by the soils engineer in accordance with ASTM D 1556, ASTM D 2167, or ASTM D 2922. Any material found not to comply with the minimum specified density shall be recompacted until the required density is obtained. Sufficient density tests shall be made and submitted to support the soils engineer's recommendations. The results of density tests will also be furnished to the owner, the project engineer, and the contractor by the soils engineer. c-a