Loading...
HomeMy WebLinkAboutJOHNSON PROPERTY - Filed GC-GENERAL CORRESPONDENCE - (2)O 0a O JO i` 0 a J I w 0 w a w J 0 N r- N N W 3 fie/ J W W I RECEIVED MAY 2 3 2001 BY: MEMORANDUM oTO: Eric Bracke, Fort Collins Traffic Engineer Ln Sheii.Wamhoff,-: Development Review :Engineer, Tom Reiff, Transportation Planner c0 to o FROM: Matt Delich -'W 0 DATE:: May 22, 2001 u_ SUBJECT: Johnson Farm Property preliminary analysis File:0140ME02) p Attached is a copy of the memorandum that we discussed last C week (5/16/01). I realized that I did not give you much time for review. As indicated by the title, this is a preliminary analysis that is intended to provide the James Company and Downing/Thorpe/ James (DTJ) an idea of the volumes on selected streets within the subject property. It includes traffic that might use the connection zto the Prospect East Business Park, but have neither an origin or i destination within the Johnson Farm Property (cut -through traffic). D_ As we discussed in the meeting, DTJ will be using this and the C7 z W WW Z a Z W z 0 a 0 a CO Q W LL W subsequent transportation impact study to classify the streets.within this proposed development. Please review this and provide me with your thoughts regarding these forecasted daily traffic volumes. If you concur. with these, please let me know. I would also like your opinion regarding changing street classifications on a particular street where the volumes decrease as the street proceeds through the site.